Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-98-511, Transmits Updated IST Program Project Plan & Schedule. Commitment to Review & Update IST Program Was Made in 971212 Response to Insp Repts 50-266/97-17 & 50-301/97-17.Schedule for Revised IST Program Extended Approx Four Months + (ML20249B529)
- NPL-98-0511, Transmits Updated IST Program Project Plan & Schedule. Commitment to Review & Update IST Program Was Made in 971212 Response to Insp Repts 50-266/97-17 & 50-301/97-17.Schedule for Revised IST Program Extended Approx Four Months + (ML20249B529)
- ML20249B530 + (ML20249B530)
- 05000327/LER-1998-001-04, :on 980519,automatic Reactor Trip Occurred. Caused by Failure of Alternate Feedwater to 1A1-A 480-volt Shutdown Board.Normal Feedwater Breaker Placed in Svc & 480- Volt Shutdown Board Returned to Operation + (ML20249B531)
- L-98-123, Provides Response to 980602 Telcon RAI Re LARs 218 & 85, Modifying Source Range Neutron Flux Requirements to Allow Use of Alternate Detectors.Supplemental LAR Will Be Submitted Following Required Reviews + (ML20249B532)
- ML20249B533 + (ML20249B533)
- ML20249B535 + (ML20249B535)
- ML20249B536 + (ML20249B536)
- ML20249B537 + (ML20249B537)
- ML20249B538 + (ML20249B538)
- IR 015000011/1997001 + (ML20249B539)
- ML20249B541 + (ML20249B541)
- ML20249B542 + (ML20249B542)
- ML20249B543 + (ML20249B543)
- NPL-98-0510, Responds to Request for Addl Info Re ASME Section XI Relief Requests PTP-3-01 & 3-02 for Units 1 & 2.Relief Request PTP-3-01 Deals W/Testing of ASME Code Class 1,2 & 3 Bolting. Util Withdrawing Relief Request + (ML20249B544)
- ML20249B548 + (ML20249B548)
- ML20249B550 + (ML20249B550)
- L-98-508, Provides Response to Staff Request for Design Info on Piping Restraints for Units 1 & 2.Util Has Ongoing Design Basis Documentation Program for Assembling Info + (ML20249B551)
- NPL-98-0508, Provides Response to Staff Request for Design Info on Piping Restraints for Units 1 & 2.Util Has Ongoing Design Basis Documentation Program for Assembling Info + (ML20249B551)
- ML20249B553 + (ML20249B553)
- ML20249B555 + (ML20249B555)
- ML20249B557 + (ML20249B557)
- ML20249B559 + (ML20249B559)
- ML20249B560 + (ML20249B560)
- ML20249B562 + (ML20249B562)
- ML20249B563 + (ML20249B563)
- ML20249B565 + (ML20249B565)
- ML20249B566 + (ML20249B566)
- ML20249B567 + (ML20249B567)
- ML20249B569 + (ML20249B569)
- ML20249B570 + (ML20249B570)
- ML20249B571 + (ML20249B571)
- ML20249B572 + (ML20249B572)
- ML20249B573 + (ML20249B573)
- ML20249B574 + (ML20249B574)
- ML20249B576 + (ML20249B576)
- ML20249B577 + (ML20249B577)
- ML20249B579 + (ML20249B579)
- IR 07100021/2011025 + (ML20249B582)
- ML20249B583 + (ML20249B583)
- ML20249B584 + (ML20249B584)
- ML20249B585 + (ML20249B585)
- ML20249B586 + (ML20249B586)
- ML20249B587 + (ML20249B587)
- ML20249B590 + (ML20249B590)
- ML20249B591 + (ML20249B591)
- NG-98-1053, Forwards Addl Info Re Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps + (ML20249B592)
- ML20249B593 + (ML20249B593)
- PY-CEI-NRR-2289, Monthly Operating Rept for May 1998 for Perry,Unit 1 + (ML20249B595)
- ML20249B596 + (ML20249B596)
- ML20249B597 + (ML20249B597)