Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20249B510 + (ML20249B510)
- ML20249B511 + (ML20249B511)
- ML20249B512 + (ML20249B512)
- NG-98-1031, Forwards Monthly Operating Rept for May 1998 for Daec.Rept Prepared IAW Guidelines of NRC GL 97-02.Revised Contents of Monthly Operating Rept & Distribution Made IAW DAEC Tech Specs,Section 6.11.1.c + (ML20249B513)
- HL-5643, Forwards Response to 980611 RAI Re Third 10-yr Interval ISI Program Relief Request RR-18 + (ML20249B515)
- ML20249B516 + (ML20249B516)
- ML20249B517 + (ML20249B517)
- ML20249B518 + (ML20249B518)
- ML20249B519 + (ML20249B519)
- ML20249B520 + (ML20249B520)
- 05000327/LER-1998-001, Forwards LER 98-001-00 Re Unit 1 Reactor Trip Resulting from Breaker Failure.Rept Submitted IAW 10CFR50.73(a)(2)(iv) as Event or Condition,Resulted in Automatic Actuation of Esfs, Including Reactor Protection Sys + (ML20249B522)
- ML20249B524 + (ML20249B524)
- B17324, Advises That Jh Austin,License Number OP-11117,no Longer Needs to Maintain Mnps,Unit 3,operator License + (ML20249B525)
- ML20249B526 + (ML20249B526)
- ML20249B527 + (ML20249B527)
- ML20249B528 + (ML20249B528)
- L-98-511, Transmits Updated IST Program Project Plan & Schedule. Commitment to Review & Update IST Program Was Made in 971212 Response to Insp Repts 50-266/97-17 & 50-301/97-17.Schedule for Revised IST Program Extended Approx Four Months + (ML20249B529)
- NPL-98-0511, Transmits Updated IST Program Project Plan & Schedule. Commitment to Review & Update IST Program Was Made in 971212 Response to Insp Repts 50-266/97-17 & 50-301/97-17.Schedule for Revised IST Program Extended Approx Four Months + (ML20249B529)
- ML20249B530 + (ML20249B530)
- 05000327/LER-1998-001-04, :on 980519,automatic Reactor Trip Occurred. Caused by Failure of Alternate Feedwater to 1A1-A 480-volt Shutdown Board.Normal Feedwater Breaker Placed in Svc & 480- Volt Shutdown Board Returned to Operation + (ML20249B531)
- L-98-123, Provides Response to 980602 Telcon RAI Re LARs 218 & 85, Modifying Source Range Neutron Flux Requirements to Allow Use of Alternate Detectors.Supplemental LAR Will Be Submitted Following Required Reviews + (ML20249B532)
- ML20249B533 + (ML20249B533)
- ML20249B535 + (ML20249B535)
- ML20249B536 + (ML20249B536)
- ML20249B537 + (ML20249B537)
- ML20249B538 + (ML20249B538)
- IR 015000011/1997001 + (ML20249B539)
- ML20249B541 + (ML20249B541)
- ML20249B542 + (ML20249B542)
- ML20249B543 + (ML20249B543)
- NPL-98-0510, Responds to Request for Addl Info Re ASME Section XI Relief Requests PTP-3-01 & 3-02 for Units 1 & 2.Relief Request PTP-3-01 Deals W/Testing of ASME Code Class 1,2 & 3 Bolting. Util Withdrawing Relief Request + (ML20249B544)
- ML20249B548 + (ML20249B548)
- ML20249B550 + (ML20249B550)
- L-98-508, Provides Response to Staff Request for Design Info on Piping Restraints for Units 1 & 2.Util Has Ongoing Design Basis Documentation Program for Assembling Info + (ML20249B551)
- NPL-98-0508, Provides Response to Staff Request for Design Info on Piping Restraints for Units 1 & 2.Util Has Ongoing Design Basis Documentation Program for Assembling Info + (ML20249B551)
- ML20249B553 + (ML20249B553)
- ML20249B555 + (ML20249B555)
- ML20249B557 + (ML20249B557)
- ML20249B559 + (ML20249B559)
- ML20249B560 + (ML20249B560)
- ML20249B562 + (ML20249B562)
- ML20249B563 + (ML20249B563)
- ML20249B565 + (ML20249B565)
- ML20249B566 + (ML20249B566)
- ML20249B567 + (ML20249B567)
- ML20249B569 + (ML20249B569)
- ML20249B570 + (ML20249B570)
- ML20249B571 + (ML20249B571)
- ML20249B572 + (ML20249B572)
- ML20249B573 + (ML20249B573)
- ML20249B574 + (ML20249B574)