- IR 05000289/1988030 + (ML20247P374)
- 05000267/LER-1989-017, :on 890818,wide Range Nuclear Channels III & V Upscaled & Tripped in Response to Induced Electrical Noise. Attempt to Locate Section of Cable Into Which Noise Being Induced Unsuccessful + (ML20247P376)
- 05000423/LER-1998-016-01, Forwards LER 98-016-01,determined Reportable at Millstone Unit 3 on 980223,per 10CFR50.73(a)(2)(vii).Commitments Made within Ltr,Encl + (ML20247P377)
- ML20247P379 + (ML20247P379)
- 05000317/LER-1989-015, :on 890822,determined That Calculations Used to Determine That Dousing Sys for Containment Iodine Filters Not Required to Be Environmentally,In Error.Justification for Continued Operation Will Be Established + (ML20247P384)
- ML20247P385 + (ML20247P385)
- 05000395/LER-1989-015, :on 890825,pressurizer Safety Valve Body Inlet a Temp Increased to Greater than 450 F & Plant Shutdown Initiated.Licensee Continuing to Evaluate Cause.Manual Reactor Trip Initiated + (ML20247P387)
- 05000423/LER-1998-016, :on 980223,potential Air/Gas Intrusion in Chemical & Volume Control Sys Was Noted.Caused by Inadequate Initial Design.No Cause for Corrective Actions Because Both Flow Paths Were Operable + (ML20247P389)
- 05000029/LER-1989-003, :on 890209,chemistry Analysis of Steam Generator 2 Blowdown Effluent Indicated Abnormal Results. Caused by Personnel Error.Personnel Will Be Trained Re Regulatory Requirements & Procedures Revised + (ML20247P392)
- IR 05000413/1989009 + (ML20247P398)
- 05000413/LER-1989-019, :on 890628,unplanned Automatic Alignment of Nuclear Svc Water Sys to Standby Nuclear Svc Water Pond Occurred.Caused by Defective Procedure Due to Erroneous Circuit Isolation.Calibr Procedures Revised + (ML20247P399)
- 05000328/LER-1989-011-03, :on 890823,discovered That Tech Spec Surveillance Requirement to Source Check Radioactive Gaseous Effluent Monitors on Condenser Vacuum Pump Exhaust Not Fully Met.Root Cause Being Investigated + (ML20247P401)
- ML20247P402 + (ML20247P402)
- 05000423/LER-1998-002, Informs of Revised Completion Date to Complete Commitment Contained in LER 98-002-00, Verification of ECCS Piping Full of Water Per TS 4.5.2.b.1 Not Being Met. New Commitment Made by Util,Encl + (ML20247P404)
- ML20247P405 + (ML20247P405)
- NL-89-468, Submits Justification for Absence of Functional Testing Requirement in Proposed Tech Spec 4.14(f) Re Snubber Svc Life Monitoring,Per 890517 Request + (ML20247P406)
- NOC-AE-000179, Documents Change of Schedule for Written Portion of Licensed Operator Exams to Be Conducted at Stp.Operational Portion of Exam Will Still Be Taken During Wk of 980601 & Written Portion Will Be Given on 980630 + (ML20247P407)
- ML20247P410 + (ML20247P410)
- JPN-98-019, Informs of Revs to ISI Program Relief Requests for Second ten-year Interval Closeout & Summary Rept,Submitted 970715. Replacement Pages,Reflecting Changes,Encl + (ML20247P411)
- IR 05000369/1989030 + (ML20247P415)
- ML20247P417 + (ML20247P417)
- ML20247P418 + (ML20247P418)
- U-603004, Part 21 Rept Re 980107 Determination That Itt Barton Model 580A Series Differential Pressure Indicating Switches Operating Forces Too Low.Manufacturing Sys Allowed Switches to Be Mixed.Evaluation Concludes Issue Not Reportable + (ML20247P420)
- ML20247P423 + (ML20247P423)
- IR 05000397/1998002 + (ML20247P424)
- ML20247P426 + (ML20247P426)
- ML20247P428 + (ML20247P428)
- ML20247P429 + (ML20247P429)
- IR 05000254/1997023 + (ML20247P431)
- ML20247P433 + (ML20247P433)
- ML20247P440 + (ML20247P440)
- ML20247P441 + (ML20247P441)
- 05000301/LER-1989-004-01, :on 890820,reactor Tripped Following Turbine Trip Initiated by Generator Breaker Trip.Caused by Main Stepup Transformer Lockout & Loss of Electrical Load Due to Actuation of Relay.Transformer Returned to Svc + (ML20247P443)
- ML20247P445 + (ML20247P445)
- AECM-89-172, Monthly Operating Rept for Aug 1989 for Grand Gulf Nuclear Station Unit 1 + (ML20247P447)
- AECM-89-0172, Monthly Operating Rept for Aug 1989 for Grand Gulf Nuclear Station Unit 1 + (ML20247P447)
- ML20247P448 + (ML20247P448)
- ML20247P451 + (ML20247P451)
- ML20247P453 + (ML20247P453)
- ML20247P455 + (ML20247P455)
- ML20247P457 + (ML20247P457)
- ML20247P458 + (ML20247P458)
- W3P89-1575, Monthly Operating Rept for Aug 1989 for Waterford 3 + (ML20247P459)
- 05000267/LER-1989-012, :on 890628,determined That Unanalyzed Gas Waste Release Occurred from Gas Waste Surge Tank 1A.Caused by Personnel Error.Release Terminated.Tank Contents Sampled & Analyzed.Operators Disciplined + (ML20247P460)
- 05000324/LER-1989-011-02, :on 890703,RCIC Turbine Received Trip Signal & Inboard Steam Supply Isolation Valve E51-F007 Closed Due to False Primary Containment Div I Group 5 Isolation Signal. Caused by Personnel Error.Personnel Counseled + (ML20247P463)
- 05000346/LER-1989-009, :on 890629,determined That HPI Sys Line Isolation Valves in Both HPI Trains Would Not Fully Open within 30 S.Caused by Inadequate Design.Temporary Mods 89-0022 & 89-0025 Implemented + (ML20247P467)
- ML20247P468 + (ML20247P468)
- ML20247P469 + (ML20247P469)
- ML20247P474 + (ML20247P474)
- 05000354/LER-1989-013-02, :on 890629,failure to Perform Required Local Leak Rate Testing on Hpci/Rcic Turbine Exhaust Vacuum Relief Piping Identified.Caused by Valves Not Being Included in Scope of Inservice Test Program + (ML20247P475)
- GO2-89-131, Forwards Corrected Page I of Change 6 to Guard Training & Qualification Plan.Page Withheld + (ML20247P478)