Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20247L326 + (ML20247L326)
- ML20247L327 + (ML20247L327)
- ML20247L328 + (ML20247L328)
- IR 05000458/1989029 + (ML20247L330)
- ML20247L331 + (ML20247L331)
- ML20247L333 + (ML20247L333)
- ML20247L334 + (ML20247L334)
- 05000412/LER-1989-012, :on 890427,technicians Failed to Identify & Block Trip Signal to Train a 4-kV Emergency Bus Feeder Breaker,Causing Loss of Power to Train a Emergency Bus. Operators Counseled & Relay Testing Evaluated + (ML20247L335)
- 05000313/LER-1988-028, :on 880831,discovered That Piping Span Lengths Between Containment Bldg Penetrations & First Piping Supports Unacceptable.Caused by Inadequate Judgement of Original Designer.Piping Requalified + (ML20247L336)
- ML20247L338 + (ML20247L338)
- ML20247L339 + (ML20247L339)
- IR 05000508/1989001 + (ML20247L340)
- ML20247L341 + (ML20247L341)
- 05000346/LER-1989-008, :on 890622,fire Sys Monthly Valve Insp Missed. Caused by Administrative & Personnel Error.Test Revised to Provide More Flexibility in Determining Operable Flowpath. Meeting Held on 890717 Re Responsibilities + (ML20247L343)
- ML20247L344 + (ML20247L344)
- ML20247L345 + (ML20247L345)
- ML20247L348 + (ML20247L348)
- ML20247L349 + (ML20247L349)
- ML20247L351 + (ML20247L351)
- IR 05000482/1989016 + (ML20247L352)
- ML20247L357 + (ML20247L357)
- ML20247L358 + (ML20247L358)
- ML20247L361 + (ML20247L361)
- ML20247L363 + (ML20247L363)
- ML20247L365 + (ML20247L365)
- ML20247L366 + (ML20247L366)
- IR 05000483/1998007 + (ML20247L367)
- ML20247L369 + (ML20247L369)
- ML20247L370 + (ML20247L370)
- ML20247L372 + (ML20247L372)
- 05000259/LER-1989-015-02, :on 890627,both Doors of Airlock Opened Simultaneously for Approx 5 S.Caused by Failure of Two Welds Which Attach Bracket That Holds Lockset on Refuel Floor Side.Lockset Bracket Reattached & Signs Placed + (ML20247L373)
- ML20247L374 + (ML20247L374)
- ML20247L375 + (ML20247L375)
- IR 05000192/1989002 + (ML20247L376)
- ML20247L377 + (ML20247L377)
- ML20247L378 + (ML20247L378)
- ML20247L379 + (ML20247L379)
- ML20247L380 + (ML20247L380)
- ML20247L384 + (ML20247L384)
- ML20247L385 + (ML20247L385)
- ML20247L386 + (ML20247L386)
- ML20247L388 + (ML20247L388)
- 3F0589-09, Monthly Operating Rept for Apr 1989 for Crystal River Unit 3 + (ML20247L392)
- ML20247L393 + (ML20247L393)
- ML20247L395 + (ML20247L395)
- ML20247L396 + (ML20247L396)
- ML20247L398 + (ML20247L398)
- ML20247L400 + (ML20247L400)
- ML20247L401 + (ML20247L401)
- ML20247L402 + (ML20247L402)
- ML20247L405 + (ML20247L405)