Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20247E564 + (ML20247E564)
- ML20247E567 + (ML20247E567)
- ML20247E568 + (ML20247E568)
- ML20247E571 + (ML20247E571)
- ML20247E572 + (ML20247E572)
- ML20247E573 + (ML20247E573)
- ML20247E577 + (ML20247E577)
- IR 05000445/1989045 + (ML20247E580)
- ML20247E581 + (ML20247E581)
- ML20247E582 + (ML20247E582)
- PNO-IV-89-023, on 890327,loss of Shutdown Cooling Occurred for 12 Minutes While Tagging Out 120-volt Dc Breakers.On 890329,loss of Shutdown Cooling Occurred While Performing Work in Div I Transmitter Cabinet in Control Room + (ML20247E584)
- ML20247E585 + (ML20247E585)
- ML20247E587 + (ML20247E587)
- ML20247E590 + (ML20247E590)
- ML20247E591 + (ML20247E591)
- ML20247E592 + (ML20247E592)
- IR 05000445/1989019 + (ML20247E594)
- ML20247E595 + (ML20247E595)
- ML20247E597 + (ML20247E597)
- ML20247E598 + (ML20247E598)
- 05000304/LER-1998-002, Forwards LER 98-002-00 IAW 10CFR50.73(a)(2)(i)(B). Commitments Made within Ltr,Encl + (ML20247E599)
- ML20247E600 + (ML20247E600)
- ML20247E605 + (ML20247E605)
- ML20247E606 + (ML20247E606)
- ML20247E607 + (ML20247E607)
- ML20247E608 + (ML20247E608)
- ML20247E611 + (ML20247E611)
- ML20247E615 + (ML20247E615)
- ML20247E616 + (ML20247E616)
- 05000313/LER-1989-025, :on 890623-0702,control Room Emergency Ventilation Sys Unexpectedly Activated Four Times.Caused by Induced Electrical Noise from Operation of Relays in Alarm Circuitry.Temp Instrumentation Repaired + (ML20247E617)
- ML20247E618 + (ML20247E618)
- ML20247E619 + (ML20247E619)
- ML20247E620 + (ML20247E620)
- ML20247E621 + (ML20247E621)
- ML20247E622 + (ML20247E622)
- ML20247E626 + (ML20247E626)
- IR 05000062/1989002 + (ML20247E627)
- LR-N980184, Submits 1997 Summary of Revised Regulatory Commitments + (ML20247E628)
- ML20247E631 + (ML20247E631)
- ML20247E632 + (ML20247E632)
- ML20247E634 + (ML20247E634)
- ML20247E635 + (ML20247E635)
- PNO-IV-89-022, on 890328,reactor Power Increased Above 5% for First Time.License Issued Earlier Authorizing Full Power Operation.Power to Be Increased in Increments for Few Wks W/Performance of Equipment & Sys Tests at Various Levels + (ML20247E636)
- ML20247E639 + (ML20247E639)
- ML20247E640 + (ML20247E640)
- 05000304/LER-1998-002-05, :on 980408,failure to Maintain Sufficient Swps Operable Was Noted.Caused by Personnel Error.Disciplined Unit Supervisor for Failure to Meet Expectation to Ensure Proper Plant Configuration Prior to Proceeding W/Test + (ML20247E641)
- IR 05000321/1989001 + (ML20247E642)
- ML20247E644 + (ML20247E644)
- ML20247E645 + (ML20247E645)
- ML20247E646 + (ML20247E646)
- ML20247E647 + (ML20247E647)