MAR .16 1989
-
..
y
Docket Nos. 50-321. 50-so6-
l
License.Nos.-DPR-57s NPF-5-
r
,
,
-Georgia Power' Company,
,
l
-ATTN: 'Mr..W. G. Hairston; III
l'
Senior Vice President -
Nuclear Operations
.P. 0.. Box.1295
~
~ Birmingham,~ AL 35201
.
Gentlemen:
SUBJECT: NRC INSPECTION REPORT NOS. 50-321/89-01 AND 50-366/89-01
This refers to- the Nuclear Regulatory Commission (NRC) . inspection conducted by :
'
.J.E.:Menning on Janue*y 21-February 24, 1989.. The inspection included a review-
of activities- authorized for your Hatch facility.
At the conclusion of the-
inspection, the- findings were discessed with those members of your> staff.
' identified in the enclosed Inspection Report.
Areas examined during the: inspection are identified. in the report. - Within-
.these areas,-the inspection consisted of selective examinations of procedures
and representative records, interviews with . personnel, and observation of-
' activities in progress.
The-inspection findings indicate that certain activities appeared to violate
NRC requirements. 'However, because all of the criteria for categorization of
licensee-identified violations were met, three violations are not being cited.
Therefore, no response to this letter is required.
The details pertaining to-
these licensee-identified violations are described in the enclosed Inspection
Report.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosve-
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
T
8904030183 890316
ADOCK 05000321
G
PNU
A. R. Herdt, Chief
~
Reactor Projects Branch 3
r
Division of Reactor Projects
Enclosure:
NRC Inspection Repor.
cc w/ enc 1:
(See page 2)
TDI
_ _ _ _ _ .
-_
_
i
- _ - .
y
,4 -
.
.
.
.
W
-
.
,
v
.
' Georgia Power C'ompany
2
MAR 161989
cc w/ enc 1:
R. P. Mcdonald, Executive Vice President.
Nuclear Operations
J. T. Beckham, Vice President, Plant Hatch
.
H. C. Nix, General Manager, Plant Hatch
0. M. Fraser, Cite Quality Assuranc,e
Manager
L. T. Gucwa, Manager, Nuclear Engineering
and Licensing, Plant Hatch
S. B. Tipps, Manager of Nuclear
Safety and Compliance
State of Georgia
bec w/ encl:
L. P. Crocker, NRR
M. V. Sinkule, RII'
NRC Resident Inspector
DRS Technical Assistant
Document Control Desk
RII
RIl
C'd-
LTrocine:tm
gMSinkule
03//4 /89
03/q /89
__
i