Forwards Insp Repts 50-321/89-01 & 50-366/89-01 on 890121-0224.Violations Noted.Violations Will Not Be Cited, Based on Categorization of licensee-identified Violations
ML20247E619
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 03/16/1989
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20247E623 List:
References
NUDOCS 8904030183
Download: ML20247E619 (2)


See also: IR 05000321/1989001

Text

. - _____ _

14

'. ..

,

.

E ..

~

.

,

9,; -

<

i

.

o

g ..

.

.

b

MAR .16 1989

-

..

y

Docket Nos. 50-321. 50-so6-

l

License.Nos.-DPR-57s NPF-5-

r

,

,

-Georgia Power' Company,

,

l

-ATTN: 'Mr..W. G. Hairston; III

l'

Senior Vice President -

Nuclear Operations

.P. 0.. Box.1295

~

~ Birmingham,~ AL 35201

.

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-321/89-01 AND 50-366/89-01

This refers to- the Nuclear Regulatory Commission (NRC) . inspection conducted by :

'

.J.E.:Menning on Janue*y 21-February 24, 1989.. The inspection included a review-

of activities- authorized for your Hatch facility.

At the conclusion of the-

inspection, the- findings were discessed with those members of your> staff.

' identified in the enclosed Inspection Report.

Areas examined during the: inspection are identified. in the report. - Within-

.these areas,-the inspection consisted of selective examinations of procedures

and representative records, interviews with . personnel, and observation of-

' activities in progress.

The-inspection findings indicate that certain activities appeared to violate

NRC requirements. 'However, because all of the criteria for categorization of

licensee-identified violations were met, three violations are not being cited.

Therefore, no response to this letter is required.

The details pertaining to-

these licensee-identified violations are described in the enclosed Inspection

Report.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosve-

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

T

8904030183 890316

PDR

ADOCK 05000321

G

PNU

A. R. Herdt, Chief

~

Reactor Projects Branch 3

r

Division of Reactor Projects

Enclosure:

NRC Inspection Repor.

cc w/ enc 1:

(See page 2)

TDI

_ _ _ _ _ .

-_

_

i

- _ - .

y

,4 -

.

.

.

.

W

-

.

,

v

.

' Georgia Power C'ompany

2

MAR 161989

cc w/ enc 1:

R. P. Mcdonald, Executive Vice President.

Nuclear Operations

J. T. Beckham, Vice President, Plant Hatch

.

H. C. Nix, General Manager, Plant Hatch

0. M. Fraser, Cite Quality Assuranc,e

Manager

L. T. Gucwa, Manager, Nuclear Engineering

and Licensing, Plant Hatch

S. B. Tipps, Manager of Nuclear

Safety and Compliance

State of Georgia

bec w/ encl:

L. P. Crocker, NRR

M. V. Sinkule, RII'

NRC Resident Inspector

DRS Technical Assistant

Document Control Desk

RII

RIl

WT

C'd-

LTrocine:tm

gMSinkule

03//4 /89

03/q /89

__

i