ML20247E564

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-445/89-45 & 50-446/89-45 on 890607-0705.No Violations or Deviations Noted
ML20247E564
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/21/1989
From: Warnick R
Office of Nuclear Reactor Regulation
To: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20247E570 List:
References
NUDOCS 8907260222
Download: ML20247E564 (3)


See also: IR 05000445/1989045

Text

-

.

'

.

,

'JUL 2I l989

,

-

In Reply Refer To:

Docket:

50-445/89-45

50-446/89-45

Mr. W. J. Cahill, Jr.

Executive Vice President

TU Electric

400 North Olive Street, Lock Box 81

Dallas, Texas

75201

Dear Mr. Cahill:

This refers to the inspection conducted by Messrs.

S. P. Burris and

S. D. Bitter during the period June 7 through July 5, 1989, of

activities authorized by NRC Construction Permits CPPR-126 and

CPPR-127 for the Comanche Peak Steam Electric Station, Units 1

and 2, and to the discussion of our findings with you and other

members of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas

examined during the' inspection.

Within these areas, the inspection

consisted of selective examination of procedures and representative

records, interviews with personnel, and observation by the

inspectors.

'Within the scope of the inspection, no violations or deviations

were identified.

In accordance with 10 CFR 2.790 of the Commission's regulations, a

copy of this letter and the enclosed inapection report will be

placed in the NRC Public Document Room.

1

Should you have any questiens concerning this inspection, we will

be pleased to discuss them with you.

Sincerely,

Original signed by J. S. Wiebe

?

R. F. Warnick, Assistant Director

for Inspection Programs

n

40

Comanche Peak Project Division

58@

office of Nuclear Reactor Regulation

S8

an

Enclosure:

Inspection Report 50-445/89-45; 50-446/89-45

'NU

No

cc: w/ enclosure

$

See next page

pgo/

car

RI:IP:C PD:NRR

SRI:IP:CPPD:NRR

IP:CPPD:NRK

AD:IP:CPPD:NRR

7g

($Sc

SBitte

SBurris

JWiebe

RWarnick

7/.;y /89

7/#//89jf.

7$\\/89 -

7/pi/89

'

.

..

-_-- - - _ _ _ _ _

_

_

]

.

8

%,

.

3

,

UNITED STATES

y"

k

NUCLEAR REGULATORY COMMISSION

l

'

'

l

{

WASHINGTON, D, C. 20555

q

k

% , , , , , /,8

'

JUL 2 l 1989

In Reply Refer To:

Docket:

50-445/89-45

50-446/89-45

Mr. W. J. Cahill, Jr.

Executive Vice President

TU Electric

400 North Olive Street, Lock Box 81

Dallas, Texas

75201

Dear Mr. Cahill:

This refers to the inspection conducted by Messrs. S. P. Burris and

S. D. Bitter during the period June 7 through July 5, 1989, of

activities authorized by NRC Construction Permits CPPR-126 and

CPPR-127 for the Comanche Peak Steam Electric Station, Units 1

and 2, and to the discussion of our findings with you and other

members of your staff at the conclusion of the inspection.

The enclosed copy cf our inspection report identifies areas

examined during the inspection.

Within these areas, the inspection

consisted of selective examination of procedures and representative

records, interviews with personnel, and observation by the

inspectors.

Within the scope of the inspection,- no violations or deviations

were identified.

In accordance with 10 CFR 2.790 of the Commission's regulations, a

copy of this letter and the enclosed inspection report will be

placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will

be pleased to discuss them with you.

Sincerely,

)

. F. Warnick, Assistant Director

for Inspection Programs

comanche Peak Project Division

Office of Nuclear Reactor Regulation

Enclosure:

Inspection Report 50-445/89-45; 50-446/89-45

cc: w/ enclosure

,

see next page

,

_.~~m----,

--

_ - _ - _ _ - _ _ _ - - -__ -_ _ . _ __ __ __

..

3

,g..

.

W. d 'Cchill, Jr.

-

s

cc w/ enclosure:

Roger D. Walker

TU Electric

Manager, Nuclear Licensing

c/o Bethesda Licensing

TU Electric

3 Metro Center, Suite 610

Skyway Tower

Bethesda, Maryland

20814

400 North Olive Street, L.B.

81

Dallas, TX

75201

E. F. Ottney

P. O. Box 1777

Juanita Ellis-

Glen Rose, Texas

76043

President - CASE

1426 South Polk Street

Joseph F. Fulbright.

Dallas, TX

75224

Fulbright & Jaworski

1301 McKinney Street

Susan M. Theisen

Houston, Texas

77010

Assistant Attorney General

Environmental Protection Division

George A. Parker, Chairman

P.O. Box 12548, capitol Station

Public Utility Committee

Austin, TX

78711-1548

Senior Citizens Alliance of

Tarrant County, Inc.

GDS Associates, Inc.

6048 Wonder Drive

1850 Parkway Place, Suite 720

Fort Worth, Texas

76133

Marietta, GA

30067-8237

Jack R. Newman, Esq.

Lanny A. Sinkin

Newman & Hoitzinger, P.C.

Christic Institute

suite 1000

.

1324 N. Capitol Street

1615 L. Street N.W.

I

Washington, DC

20002

Washington, D.C. 20036

Ms. Billie Pirner Garde, Esq.

l-

Garde Law Office

,

'

104 East Wisconsin Avenue

Appleton, WI

54911

Regional Administrator, Region IV

U.S. Nuclear Regulatory Commission

611 Ryan Plaza Drive, Suite 1000

Arlington, Texas

76011

William A. Burchette, Esq.

Counsel for Tex-La Electric

Cooperative of Texas

Heron, Burchette, Ruckert & Rothwell

1025 Thomas' Jefferson St., NW

Washington, DC

20007

_ _ _

_ - - _

_ - _ _ -