Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20236P223 + (ML20236P223)
- ML20236P226 + (ML20236P226)
- IR 05000445/1987007 + (ML20236P227)
- ML20236P227 + (ML20236P227)
- ML20236P228 + (ML20236P228)
- ML20236P229 + (ML20236P229)
- ML20236P232 + (ML20236P232)
- ML20236P233 + (ML20236P233)
- ML20236P234 + (ML20236P234)
- ML20236P236 + (ML20236P236)
- ML20236P240 + (ML20236P240)
- ML20236P241 + (ML20236P241)
- ML20236P242 + (ML20236P242)
- ML20236P243 + (ML20236P243)
- ML20236P244 + (ML20236P244)
- IR 05000382/1998009 + (ML20236P247)
- 05000302/LER-1987-011, :on 870710,reactor Trip Occurred Due to Loss of Reactor Coolant Pump (RCP) Power Monitors.Caused by Failed Relay in RCP B Power Monitor Circuit Due to Open Power Fuse. Monitor Relay & Fuse Replaced + (ML20236P249)
- ML20236P251 + (ML20236P251)
- ML20236P252 + (ML20236P252)
- ML20236P253 + (ML20236P253)
- ML20236P256 + (ML20236P256)
- ML20236P258 + (ML20236P258)
- L-87-464, Forwards Response in Form of Corrected Page Changes,Rev 12, to Physical Security Plan,Per NRC .Response Withheld (Ref 10CFR73.21) + (ML20236P260)
- ML20236P262 + (ML20236P262)
- BECO-87-183, Requests Extension of Deadline to Respond to IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Plan for Completing Remaining Test & Providing Final Results Listed + (ML20236P264)
- ML20236P265 + (ML20236P265)
- ML20236P271 + (ML20236P271)
- ML20236P273 + (ML20236P273)
- ML20236P275 + (ML20236P275)
- ML20236P276 + (ML20236P276)
- ML20236P279 + (ML20236P279)
- ML20236P284 + (ML20236P284)
- ML20236P285 + (ML20236P285)
- ML20236P286 + (ML20236P286)
- ST-HL-AE-2411, Application for Amend to License NPF-71,revising Tech Spec 6.5.2.2 to Authorize Appointment of Addl Nuclear Safety Review Board Members by Group Vice President,Nuclear.Fee Paid + (ML20236P287)
- ML20236P290 + (ML20236P290)
- ML20236P291 + (ML20236P291)
- ML20236P294 + (ML20236P294)
- ML20236P296 + (ML20236P296)
- ML20236P297 + (ML20236P297)
- IR 05000298/1987012 + (ML20236P298)
- ML20236P299 + (ML20236P299)
- IA-87-701, Package Consisting of Purchase Orders to Sacal Corp,Baldwin & Assoc,Inc & Omega Group,Inc + (ML20236P300)
- ML20236P300 + (ML20236P300)
- ML20236P301 + (ML20236P301)
- ML20236P302 + (ML20236P302)
- 05000321/LER-1987-017-01, :on 871008,plant Operations Personnel Noticed Water Dripping from Standby Gas Treatment Sys (SGTS) Filter Train B Drain.Caused by Personnel Errors.Carbon Filter Medium Replaced & SGTS Returned to Operation + (ML20236P304)
- ML20236P305 + (ML20236P305)
- ML20236P309 + (ML20236P309)
- TXX-6941, Interim Deficiency Rept CP-87-112 Re Hot Shutdown Panel & Main Control Board Not Being Seismically Qualified.Initially Reported on 871012.Evaluation Continuing.Next Rept Will Be Submitted by 880127 + (ML20236P311)
- ML20236P313 + (ML20236P313)