ML20236P299

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs,Allowing Temporary Suspension of Requirement That Either Plant Manager or Superintendent of Operations Hold Senior Reactor Operator License.Supporting Documentation Encl
ML20236P299
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 08/10/1987
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20236P259 List:
References
NUDOCS 8708120290
Download: ML20236P299 (5)


Text

.

n ed5 s

k.

Q_

RB[ ")

< ]!

jf l

$gsa Sac e

p

-!"i en 1

s=R N

E

.c

e E

=

i nI t@.J gs E

E dE $5 aj eQ

- $8 5

!~

R B$$$$l $l ll hy "a b e

E B,

F,s r4

,g gLa i

ha e$5

li E f!!

! d E!!

i!

E!

18 8a me m

m O,

-.g pg 8

m

$u$!

.f-@ 5w su

[$

g E

EEC h

?

182 sg l

5 g

- i=

lu a

y 9

h gnag ggi y

c-e cr gie

- a g

,g

=

=

eigls E

H i

,s

glmasj 5

r a8=

g e

hi E

20!

l

Docket Mos. 50-277 50-278 Assistant-to-the-Manager Peach Bottom Atomic Power Station Date Appointed:

May 1987 EDUCATION AND TRAINING 1962-1963 Drury Co]'rge, Springfield, Mo.

1963-1967 U. S. Naval Academy, Annapolis, Md. BS Degree

' April 1968 Completed U.S. Navy Nuclear Power Training School, Bainbridge, Md.

Oct. 1968 Completed U. S. Navy Nuclear Power prototype training, NPTU Idaho Falls, Idaho.

Qualified as Engineering Office of the Watch on SIW prototype reactor.

April 1969 Completed U. S. Navy Officers Submarine School, New London, Connecticut.

March 1975 Completed 12 session course on the 1974 ASME Boiler and Pressure Vessel Code,Section III presented by ASME - Engineers Club, Philadelphia, Pa.

June 1976 Completed Drexel University Professional Engineering Registration Examination Review Course June 1976 Completed Philadelphia Electric Company Basic FORTRAN IV Programming Course Jan. 1979 Completed one-week course in Kepner-Tregue management techniques - Philadelphia Electric Company Aug. 1979 Completed three day course in Management Development - American Management Association June 1980 Completed one-week Radiological Emergency Response Coordinators Course presented by USNRC.

Sept. 1980 Completed two-week Research Reactor Training - Pennsylvania State University Aug. 1981 Completed 12 week BWR Simulator Senior Operator Certification - Limerick Training Center Nov. 1981 Completed two-day Management Development Program Course in Managing Performance

1 Page 2

' Dsc. ' 19 81.

Completed'five-day Process Instrumentation and Controls Fundamentals course presented L

by General Physics Corporation at the l

Limerick Training Center i.

Nov. 1982 Limerick Simulator Requalification Program l

- 1 week course conducted by General Physics Corporation Sept. 1983-Transient Response Implementation Procedures - 1 week course Dec.11983 Mitigation of Core Damage - 1 week course conducted by General Physics Corporation 1

Dec. 1983 Design Lecture Series - 6 week course-conducted by General Physics Corporation Mar-May 1984 License Review Course - 8 week course WORK EXPERIENCE 6/87.to present Assistant-to-the-Manager, Peach Bottom Atomic Power Station 3/86 to 6/87 Superintendent-Plant Services, Peach Bottom Atomic Power Station 1/82 to 3/86 Maintenance Engineer, Limerick Generating Station 6/78 to 1/82 Engine <i - Limerick Generating Station Reviewed various equipment specifications and Final Safety Analysis Report Sections for operational and maintenance considerations.

Prepared the Limerick Generating Station Emergency Plan and Final Safety Analysis Report Sections 13.1, 13.2 and 13.4.

Performed special projects, such as corporate AD Hoc Committee on Nuclear Emergency Communications, post-TMI review and revision of the Peach Bottom Atomic Power Station Emergency Plan, and review / analysis of'new and revise'd regulations.

Prepared environmental s

protection plans in response to Federal and

,t State regulations.

Responsible for the operation and maintenance of the auxiliary boiler and plant heating systems for winter heat during construction.

Responsible for organizational-planning and maintenance program development for the plant maintenance staff.

Page 3 7/72 to 6/78 Quality Assurance Engineer - Engineering and Research Department, Philadelphia Electric Company

)

1 Participated in the development of the Philadelphia Electric Company QA Plan for the Pre-Operational and Startup Phase of Peach Bottom Atomic Power Station.

For Limerick Generating Station, reviewed i

QA Manuals and performed audits of architect-engineer component vendor, and l

subcontractor QA programs.

Reviewed component specifications for QA and QC provisions.

Witnessed inspections and tests, such as hydrostatic tests and NDE, in vendor facilities.

For Fulton Generating Station, an HTGR project, was Project QA Engineer, responsible for establishing the NSSS, A/E, and Philadelphia Electric Company QA Plans until project cancellation.

Developed QA training program for the E&R Department.

Participated on a Departmental task force to develop E&R Department Procedures for engineering and construction efforts in support of Peach Bottom Atomic Power Station.

4/68 to 6/72 U.

S. Navy Held various positions in the Engineering Department of a nuclear submarine, including Reactor Controls Division Officer, Electrical Division Officer, Radiation Control Officer, and Main Propulsion Assistant (in charge of Machinery Division, water chemistry, and radiation control) during operational cycles and during an overhaul / reactor refueling period.

Was responsible for the operation and maintenance of equipment associated with the various divisions and qualified as Engineering Officer of the Watch.

During the overhaul period, participated in post-overhaul testing program, initial criticality of new reactor core, and system testing.

8/72 to U.

S. Navy Reserve Officer present

Page 4 Held various,'sitions in Naval Reserve Units.

From March, 1977 to September, 1981, was Executive Officer and Commanding Officer of a Reserve Unit of 50 members responsible for repair and preventive maintenance work on Reserve force ships.

From September, 1981 to October, 1983, assigned as QA Officer and Planning Officer in a 200-member Reserve Maintenance Facility.

From October, 1983 to October,.

1985 assigned as Officer-In-Charge of a 50-member Reserve Unit working in the Reserve Maintenance Facility.

LICENSES AND CERTIFICATES 6/84 to 5/86 NRC Senior Reactor Operator License - 1100 MWe Limerick Unit 1 BWR i

\\

l f

L-


_---_--a