PC. BOX NEB AMA 88221 Nebraska Public Power District mm="
_m NLS980105 July 8,1998 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Gentlemen:
Subject:
CNS Strategy for Achieving Engineering Excellence, Revision 2
Reference:
1)
Letter from J. H. Swailes (Nebraska Public Power District) to the U.S.
Nuclear Regulatory Commission dated June 25,1998, " Anticipated Revisions to CNS Strategy for Achieving Engineering Excellence" 2)
Letter from J. H. Swailes (Nebraska Public Power District) to the U.S.
Nuclear Regulatory Commission dated April 9,1998, " Strategy for Achieving Engineering Excellence, Revision 1" On June 25,1998, the Nebraska Public Power District (NPPD) submitted to the Nuclear c
Regulatory Commission (NRC) correspondence summarizing anticipated revisions to the subject Strategy for Achieving Engineering Excellence (Reference 1). Through this correspondence, NPPD is transmitting to the NRC Revision 2 of the subject Strategy as Attachment A.
Following issuance of Revision 1 of the Strategy on April 9,1998 (Reference 2), NPPD conducted a review and analysis ofdesign related discrepancies or conditions previously identified from a period of mid-1995 to present captured in the CNS Corrective Action Program (CAP).
This review confirmed the validity of performance issues and resultant actions contained in Revision 1, Strategy 3, the objective ofwhich is to improve the understanding, accessibility, and quality of design basis information. This review led, in part, to the development of Revision 2 to the strategy. A summary of the changes contained in Revision 2 is included as Attachment B.
3 Attachment C to this correspondence is a Summary of Critical Success Factors (CSFs) which have been introduced as the primary method of determining progress in attaining Engineering l
excellence. Each CSF is comprised of performance indicators and milestones which are demonstrative of high level, terminal objective performance, establishment ofinfrastructure
.Md necessary for sustained expellence, and overall effectiveness.
o,.. b Additional emphasis was placed on producing a workable plan, one in which Strategy efforts complement each other and other station priorities, including the upcoming fall refueling outage.
Attachment D depicts the Strategy, Revision 2, in Gantt chart format.
j 9807160236 980708 PDR ADOCK 05000298 P
PDR h
hhd5NON* s$NNNNEM k
g =mmm=
.m
=
m_
mm m== m mmm
- a NLS980105 July 8,1998 Page 2 I appreciate the frank and open dialog that has taken place between our staffs in the continuing maturation of the Strategy. Please contact Paul Caudill at 402-825-5052 if you have any questions.
Sincerely,
/1 Joh
. S ai s Vi ei side of Nuclear Energy
/r 1
)
Attachments: A Strategy for Achieving Engineering Excellence, Revision 2 B
Summary of Changes
{
C Summary of Critical Success Factors D
Primavera Project Planner Schedule for Revision 2 cc:
Regional Administrator w/ attachments USNRC - Region IV Senior Project Manager w/ attachments USNRC - NRR Project Directorate IV-1 Senior Resident Inspector w/ attachments USNRC NPG Distribution w/ attachments i
9 l
l ATTACKMENT 3 LIST OF NRC COMMITMENTS l
\\
Correspondence No:_HLS900105 The following table identifies those actions committed to by the District in this document. Any other actions discussed in the submittal represent intended or i
planned actions by the District. They are described to the NRC for the NRC's l information and are not regulatory commitments.
Please notify the NL&S Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.
g COMMITTED DATE COMMITMENT OR OUTAGE None 4
1 I
1 I
1 j
i i
l i
1 l
l PROCEDURE NUMBER 0.42 l
REVISION NUMBER 6 l
PAGE 9 OF 13 l