Confirms NRC Understandings Re Readiness Review Program (RRP) Plans & Status,Per Util 870909 Presentation & NRC .Schedule for Submittal of Each Increment of Modules 03A & 23,along W/Other Unit 2 Modules & Apps Encl
ML20236P276
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 11/10/1987
From: Rice P
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
GN-1412, NUDOCS 8711170224
Download: ML20236P276 (3)


Text

~

Georgia Power Cornpany.

Post office Box 282 -

t Waynesboro, Georgia 30830

blephone 404 554 9061. Extension 3413.

404 724 8114, Extension 3413 a j'd

/

u Georgia Power P. O. Rice j

Wce President '

Vogtie Project liv souvern ekttre system L

(

November 10, 1987 United States Nuclear Regulatory Commission E

ATTN:

Docume nt Control. Desk-File:. X7 BD10 2 Washingcon, D.

C.

20555 Log:

GN-1412

Reference:

.Vogtle ' Electric Generating Plant - Unit 2 Readiness Review Program On. September 9,1987, Georgia Power Company (GPC) made a-presentation ' to the. Nuclear Regulat ory Commission (NRC) staff at Region II -Headquart'ers on.the Unit 2 Readiness' Review Program; plans and status.

At that meeting, GPC briefed the NRC on its plans for incremental review and submittal of ' Module 03A, Initial Test Program - Preoperational Test Phase.

Inc rement al ' review of this module was responsive to an observation in the NRC assessment of the GPC Unit 1 Pilot Readiness Review that an i

. i nc remental review may improve module effectiveness and NRC i nt er a c tio n'.

Module 03A was chosen af ter discussions between NRC. staff and GPC.

During the September 9, 19 87 meeting, G PC informed the commission that Module 23, Plant Security, was being evaluated for submittal in increments like Module 03A.

In a letter dated October 7, 1987 the NRC, Region II issued a

. report on the September 9,

19 87 meeting and its review of the GPC proposed Unit 2 Readiness Review Program which was submitted by G PC to the NRC on May 8, 1987.

NRC stated its understanding that Module 03A, " Initial Test Program" would i

be submitted for inc remental NRC review, that GPC was considering Module 23, Plant Security, for inc rement al 'NRC review, and - that the last module would be submitted by

-December 1988.

NRC stated its int ent ion to fully participate in the Readiness Review Program by incorporating its review into the. regular inspection program.

The purpose of this letter is to confirm each of the NRC l

understandings discussed in the October 7, 1987 NRC letter as

summa rized above and to provide a Readiness Review Program i

. module schedule to the NRC for review and comment.

8711170224 871110

\\

i PDR ADOCK 05000424 F

PDR

=_

1, U

i Attached to this letter is a schedule for submittal of each 1

increment of Modules 03A and 23, along with the other Unit 2 modules and appendices.

If I can be of assistance in providing additional details or answering any questions, please contact me.

r '. d

=r ;

2 P. D. Rice RWM/PDR/bj d Attachment xc USNRC - Region II Suite 2900 101 Mari etta St reet, NW Atlanta, GA 30323 l

J H.

G.

Ba ker, Jr.

J.

F. D'Amico R.

E.

Conway G.

A. McCarley J.

P.

O ' Re il ly L.T. Gucwa R.

H.

Pin son C. W.

Hayes E.

D.

Gro ove r R. W.

McMa nu s C.

T.

Moore Sr. Resident (NRC)

D.

R.

Alt ma n D.

H.

Smi th, (O PC )

J.

A. Bailey J.

E.

Joiner, (TSLA)

G.

Bo ck ho ld, Jr.

NORMS G. R.

Frederick RR File 0815C/308-7 b

_J

I'k 3

L '.i :

At t achment GN-1412.

PL ANT VOGTLE UNIT 2 READINESS REVIEW PROG RAM MODULE ISSUE DATES

< Issue Module' Module Title Unit 2' Module Phase -I 01/18/88 03A I TP - Pt e op. Te st Phase

- Phase II 06/13/88

- Phase III 12/12/88 1

04.

Mechanical Equipment and Pipi ng 01/18/88 06 Electrical-Equipment.

01/04/88 11 Pipe St ress and Gupports 04/26/88 12 Cables and Terminations 08/03/88 13B Coatings 08/03/88 17/19 Electrical Raceways and Supports 03/14/88 18A H VAC 02/16/88 20 Inst rument ation and Cont rols 08/02/88 23 Plant Secu rity

- Pha se I 03/01/88

- Phase II 08/15/88

- Phase III 12/05/88 App. F Inspector Qualification 04/18/88 f

0 815C /3 08-7 1

_ - _ _ _ _ _ _