Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20236M537 + (ML20236M537)
- ML20236M538 + (ML20236M538)
- ML20236M540 + (ML20236M540)
- PNO-II-87-075, on 871021 & 25,voiding Noted in Vessel Head Regions.Caused by Mispositioned Manual Valve in Nitrogen Vent Line.Investigation Continuing + (ML20236M543)
- 05000220/LER-1998-013-01, :on 980604,valve Repositioning Caused non- Conformance W/App R Safe Shutdown Analysis. Caused by Failure to Include Valves 40-26 & 40-27 in UFSAR Description of App R.Circuit Breakers 40-30 & 40-31 Opened + (ML20236M544)
- ML20236M545 + (ML20236M545)
- ML20236M547 + (ML20236M547)
- ML20236M548 + (ML20236M548)
- ML20236M549 + (ML20236M549)
- ML20236M551 + (ML20236M551)
- ML20236M552 + (ML20236M552)
- TXX-6602, Provides Addl Info Re Generic Ltr 83-28,Section 2.2.1,per Ci Grimes 870325 Request + (ML20236M553)
- ML20236M554 + (ML20236M554)
- ML20236M556 + (ML20236M556)
- ML20236M559 + (ML20236M559)
- IR 05000166/1987004 + (ML20236M561)
- ML20236M563 + (ML20236M563)
- ML20236M564 + (ML20236M564)
- NOC-AE-000221, Informs That Survey Portion of Comprehensive Cultural Assessment Was Completed on 980625.Approx 30-40 Interviews Will Be Conducted on Site During Wk of 980713.Interview & Survey Results Will Assist in Developing Characterization + (ML20236M565)
- IR 05000327/1987055 + (ML20236M566)
- ML20236M571 + (ML20236M571)
- IR 05000184/1987003 + (ML20236M572)
- ML20236M574 + (ML20236M574)
- ML20236M575 + (ML20236M575)
- ML20236M576 + (ML20236M576)
- ML20236M577 + (ML20236M577)
- ML20236M578 + (ML20236M578)
- ML20236M579 + (ML20236M579)
- IR 05000247/1997013 + (ML20236M581)
- LR-N980316, Responds to NRC Re Violations Noted in Insp Rept 50-354/98-05.Corrective Actions:Interaction Between Nuclear Fuels,Sys Engineering & Outage Mgt Has Been Proceduralized & Decay Heat Removal Method Evaluated IAW 10CFR50.59 + (ML20236M586)
- ML20236M588 + (ML20236M588)
- ML20236M589 + (ML20236M589)
- 05000412/LER-1987-004, :on 870626,reactor Trip Breakers Reclosed & Control Rod Test Commenced Following Suspension of Test Due to Potential Tech Spec Violation.On 870627,breakers Reopened When Tech Spec 3.0.3 Violation Confirmed + (ML20236M590)
- ML20236M593 + (ML20236M593)
- ML20236M595 + (ML20236M595)
- ML20236M596 + (ML20236M596)
- ML20236M597 + (ML20236M597)
- ML20236M598 + (ML20236M598)
- ML20236M599 + (ML20236M599)
- ML20236M600 + (ML20236M600)
- ML20236M601 + (ML20236M601)
- ML20236M603 + (ML20236M603)
- ML20236M604 + (ML20236M604)
- ML20236M605 + (ML20236M605)
- JPN-98-029, Forwards Application for Amend to License DPR-59 to Relocate Portions of TS 3/4.6.C, RCS - Coolant Chemistry, from TS to UFSAR & Applicable Plant Procedures Controlled by 10CFR50.59 Process + (ML20236M606)
- ML20236M607 + (ML20236M607)
- ML20236M608 + (ML20236M608)
- ML20236M610 + (ML20236M610)
- ML20236M611 + (ML20236M611)
- ML20236M612 + (ML20236M612)
- ML20236M615 + (ML20236M615)