ML20236M605
| ML20236M605 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 10/28/1987 |
| From: | Dan Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Wilgus W FLORIDA POWER CORP. |
| References | |
| NUDOCS 8711130202 | |
| Download: ML20236M605 (1) | |
Text
- __ - _-
OCT 2 81987
]
F1orida Power. Corporation Mr. W. S. Wilgus Vice President Nuclear Operations ATTN: Manager, Nuclear Licensing
.P. O. Box 219 Crystal' River, FL 32629 Gentlemen:
SUBJECT:
CRYSTAL RIVER RADIOLOGICAL EMERGENCY l
RESPONSE PLAN REVIEW, DOCKET N0. 50-302 l
We have completed our review of Revision 6 of the Crystal River-3 Radiological Emergency Response Plan.
Our review disclosed that the changes to Emergency Plan appear to meet the-planning standards of 10 CFR 50.47(b)your and the requirements of Appendix E to 10 CFR 50.
Please be reminded that 10 CFR 50.54(q) requires NRC approval of any changes to I
your Plan which may decrease the effectiveness of the Plan.
However, if your safety review indicates no decrease in emergency preparedness, then changes can I
be made without.NRC approval.
In all cases, you should furnish copies of each proposed change to the NRC in accordance with 10 CFR 50.54(q).
Also, any changes to the Emergency Plan Implementing Procedures' should be made in accordance with the requirements of Section V (Implementing Procedures) of Appendix E to 10 CFR 50.
Should you have any questions regarding this letter, please contact Mr. Thomas R. Decker at (404) 331-2559.
Sincerely, 7,
'?t Douglas M. Collins, Chief Emergency Preparedness and Radiological Protection Branch Division of Radiation Safety and Safeguards cc:
P. F. McKee, Director, Nuclear Plant Operations E. C. Simpson, Director, Nuclear Site Support bec: NRC Resident Inspector Document Control Desk State of Florida RII
(
RII RII ATaba a TDec er son 10/ 0/8 10/,$ /87 10/g/87 9
8711130202 871028
)
hDR ADOCK 05000302 PDR rry