Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235Y742 + (ML20235Y742)
- ML20235Y746 + (ML20235Y746)
- ML20235Y748 + (ML20235Y748)
- ML20235Y751 + (ML20235Y751)
- ML20235Y753 + (ML20235Y753)
- ML20235Y756 + (ML20235Y756)
- ML20235Y758 + (ML20235Y758)
- ML20235Y759 + (ML20235Y759)
- 05000352/LER-1987-047, :on 870914,isolation of Main Control Room HVAC Occurred.Caused by Elevated Chlorine Levels in Control Encl HVAC Intake Plenum.Electronic Indications Checked & Verified to Be Operating Properly + (ML20235Y761)
- ML20235Y762 + (ML20235Y762)
- ML20235Y767 + (ML20235Y767)
- ML20235Y769 + (ML20235Y769)
- U-601059, Monthly Operating Rept for Sept 1987 + (ML20235Y770)
- ML20235Y771 + (ML20235Y771)
- ML20235Y773 + (ML20235Y773)
- IR 05000498/1989005 + (ML20235Y775)
- ML20235Y777 + (ML20235Y777)
- ML20235Y781 + (ML20235Y781)
- ML20235Y782 + (ML20235Y782)
- 05000277/LER-1989-003-01, :on 890207,group 2C Primary Containment Isolation Sys Valve Isolation Occurred Resulting in motor- Operated Feedwater Flush Valves Receiving Signals to Close. Caused by Stated Inadvertent Signals + (ML20235Y784)
- ML20235Y785 + (ML20235Y785)
- ML20235Y786 + (ML20235Y786)
- BSEP-89-0236, Monthly Operating Repts for Feb 1989 for Brunswick Steam Electric Plants Units 1 & 2.W/undated Ltr + (ML20235Y787)
- ML20235Y789 + (ML20235Y789)
- DCL-87-249, Forwards Page Changes for Rev 16 to Physical Security Plan, Per Util 870826 Commitment in Response to NRC Reaffirming Validity of Violation Opposed in Util + (ML20235Y790)
- ML20235Y792 + (ML20235Y792)
- ML20235Y795 + (ML20235Y795)
- ML20235Y796 + (ML20235Y796)
- ML20235Y797 + (ML20235Y797)
- ML20235Y798 + (ML20235Y798)
- 05000312/LER-1987-015, :on 870207,numerous Cardox Zones Observed Deactivated When No Safety Concern for Personnel Noted. Caused by Personnel Not Reactivating Zone After Concern Resolved.Hourly Verification Initiated & Procedure Revised + (ML20235Y799)
- ML20235Y800 + (ML20235Y800)
- 05000206/LER-1989-006-02, :on 890208,snubbers Not Classified as Safety Related & Omitted from Tech Specs Surveillance During Fuel Cycle.Caused by Not Providing Adequate Guidance to Architect When Snubber Developed.Snubber Classification Reviewed + (ML20235Y801)
- ML20235Y804 + (ML20235Y804)
- ML20235Y805 + (ML20235Y805)
- ML20235Y806 + (ML20235Y806)
- ML20235Y808 + (ML20235Y808)
- ML20235Y811 + (ML20235Y811)
- ML20235Y812 + (ML20235Y812)
- PLA-2924, Monthly Operating Repts for Sept 1987 + (ML20235Y815)
- ML20235Y817 + (ML20235Y817)
- ML20235Y818 + (ML20235Y818)
- ML20235Y819 + (ML20235Y819)
- ML20235Y820 + (ML20235Y820)
- B13139, Forwards Haddam Neck Plant Semiannual Radioactive Effluents Release Rept Jul-Dec 1988. Annual Radioactive Effluents Dose Rept to Be Submitted in Mar 1989 to Include Assessment of Radiation Doses Due to Stated Effluents During CY88 + (ML20235Y821)
- ML20235Y822 + (ML20235Y822)
- ML20235Y824 + (ML20235Y824)
- 05000499/LER-1989-003-01, :on 890203,partial Loss of Offsite Power Occurred on 4.16 Kv ESF Train C Bus.Caused by Misoperation of Brown Boveri Model ITE87T Transformer & Mfg Defect.Relay Replaced & Train C Bus Restored + (ML20235Y825)
- 05000341/LER-1987-047, :on 870918,discovered That Div I of Control Ctr HVAC Chiller Pump & Valve Operability Surveillance Had Not Been Completed by Critical Completion Date.Caused by Inadequate Training of Operators + (ML20235Y826)
- ML20235Y827 + (ML20235Y827)
- 05000341/LER-1989-005, :on 890208,potential Concerns W/Secondary Containment Integrity Due to Use of non-Q Air Supply Noted, Following Test Failure.Caused by Wind Conditions Impacting Test Results.Foam Seal Installed within 4 H + (ML20235Y828)