Supplemental Deficiency Rept CP-88-29 Re Feedwater split-flow Bypass Valves Design Mod Not Incorporated Into FSAR Chapter 15 Analysis.Initially Reported on 880422. Qualification Dates for Valves for Both Units Stated
ML20235Y767
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/03/1989
From: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CP-88-29, TXX-89108, NUDOCS 8903140557
Download: ML20235Y767 (1)


Text

- _ _ _.. _ _ _____

. ;lb MM E ]'

Log # TXX-89108 Fi1e # 10110 910.4 7UELECTRIC Ref. #.10CFR50.55(e) 1 1

. March 3, 1989

' W. J. Cahill Executive Vice President U. S. Nuclear Regulatory Commission i

1 Attn:' Document Control Desk Washington, D. C.

20555.

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 FEEDWATER SPLIT-FLOW BYPASS VALVES SDAR: CP-88-29 (SUPPLEMENTAL REPORT)

Gentlemen:

On April 22, 1988, TV Electric notified the NRC by letter logged TXX-88384 of a reportable deficiency involving a feedwater design modification which was not incorporated into the FSAR Chapter 15 accident analysis.

The last report submitted on this issue was logged TXX-88812, dated November 30, 1988.

The.

. purpose of this supplemental report is to revise the corrective action implementation schedule.

Qualification of the Unit 1 feedwater split-flow bypass. valve is continuing and will be complete by April 15, 1989.

The Unit 2 valves will be qualified prior to Unit 2 fuel load.

Sincerely, 3A William J.

hill, Jr.

JDS/grr c.- Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3)

{

t s

S 400 North Olive Street LB81 Dallas, Texa.t 75201 Lm-____ _ _ __

..__s_

_ _ _ _..