Text
- -
-
.!jj * /.
g
ti
'
l
MAR 021989
-
-
.
!
Docket No. 50-29
l
Yankee Atomic Electric Company
"
L
ATTN:
Mr. Bruce L. Drawbridge
q
l
Vice President and
Manager of Operations
"
580 Main Street
Bolton, Massachusetts 01740-1398
t
Gentlemen:
Subject:
Inspection No. 50-29/88-22
J
This refers to the routine resident safety inspection conducted by Messrs
H. Eichenholz
and
M. Markley
of
this
office
on
November 15, 1988 -
January 17,1989, at the Yankee Nuclear Power Station, Rowe, Massachusetts.
The inspection consisted of observations of activities, interviews with per-
sonnel, independent measurements and document reviews.
The results of the
inspection are described in the NRC Region I Inspection Report enclosed with
this letter and were discussed with Mr. N. St. Laurent of your staff.
Based on the results of this inspection, it appears that two of your activities
were not conducted in full compliance with NRC requirements, as set forth in
the Notice of Violation, enclosed herewith as Appendix A.
The violations con-
cern the failure to meet 10 CFR Part 20.203 (c)(1) requirements to conspicu-
ously post a high radiation area, and the failure to meet 10 CFR Part 50,
Appendix B,
Criteria XVI requirements for establishing measures that would
ensure the proper documentation and reporting to appropriate levels of manage-
ment
of
significant
conditions
adverse
to
quality
involving
design
deficiencies.
These violations have been categorized by severity level in accordance with the
" General Statement of Policy and Procedure for Enforcement Actions", 10 CFR Part 2, Appendix C.
You are required to respond to this letter and, in so
doing, should follow the instructions in Appendix A.
However, we note that no
response to Violation A of Appendix A is required because immediate corrective
actions and actions to preclude recurrence were both timely and adequate.
Your cooperation with us is appreciated.
Sincerely,
0.:~ X
y L.y
'
JnE3 ;. o : < .
<
'
James T. Wiggins, Chief
Reactor Projects Branch No. 3
"
\\ \\
Division of Reactor Projects
OFFICIAL RECORD COPY
IR YR 88-22 - 0001.0.0
8903140592 890302
03/01/89
[
.-
ADOCK 05000029
g-
Q
(
.___
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
__
- _ _ _ - _ _ _ - - -
,;
e
-o
MAk 02 f$$$
Yankee Atomic Electric Company:
2
.
,
Enclosures:
1.
Appendix A, Notice of Violation
'2.
.NRC Region I Inspection Report Number 50-29/88-22
cc w/encls:
A.Kadak,P' resident l&Chie'f.OperatingOfficer
N. St. Laurent, Plant Superintendent.
_
G. Papanic, Jr., Senior Project Engineer - Licensing
.
P.'Agnes, Assistant Secretary of Public Safety, Commonwealth of Massachusetts
C. Sterzinger, Commissioner, Vermont Department of Public Service
Public Document Room'(PDR)
' Local- Public Document Room (LPDR)-
-Nuclear Safety Information Center (NSIC)
'
NRC Resident Inspector.
Commonwealth of Massachusetts-(2)._
'bec w/encls:
Region I Docket Room (Qith. concurrences)
M.' Perkins, DPMA (w/o e.nc1)
J. Wiggins,-DRP
D. Haverkamp~, DRP
H. Eichenholz,. SRI - Yardee-(with concurrences)
G. Grant, SRI
' Vermont Yankee
.D. Ruscitto, SRI - Seabrook
N. Blumberg, DRS (See Section 11)
P. Eapen, DRS (See Sections 11 and 19)
M. Shanbaky, DRSS (See Sections 6 and 12)
R. Bores, DRSS
- M. Fairtile, NRR
,
!
RI
R
P-
RI:DRP
l
HEichenholz/mjd
D
kamp
JWiggins
3/v/89
3/ F/89
3/]I9
s
OFFICIAL RECORD COPY
IR YR 88-22 - 0002.0.0
03/01/89
.
____im____.__
m- _ _ _