Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20217M412 + (ML20217M412)
- ML20217M414 + (ML20217M414)
- ML20217M415 + (ML20217M415)
- ML20217M417 + (ML20217M417)
- ML20217M418 + (ML20217M418)
- ML20217M421 + (ML20217M421)
- ML20217M422 + (ML20217M422)
- ML20217M423 + (ML20217M423)
- 05000317/LER-1999-006, :on 990922,manual Reactor Trip Was Noted.Caused by Inadequate Electrical Current Determination.Evaluated Trip Risk Assessment Process for Enhancements.With + (ML20217M424)
- ML20217M425 + (ML20217M425)
- ML20217M427 + (ML20217M427)
- ML20217M428 + (ML20217M428)
- ML20217M429 + (ML20217M429)
- ML20217M430 + (ML20217M430)
- ML20217M432 + (ML20217M432)
- ML20217M433 + (ML20217M433)
- 05000412/LER-1997-003, :on 970521,entry of TS 3.0.3 Occurred Due to Inoperability of Both Trains of Suppl Leak Collection & Release Sys.Caused by Failure to Recognize That Operating in Condition Is Prohibited by Ts.Reviewed Rept 971141 + (ML20217M434)
- ML20217M436 + (ML20217M436)
- ML20217M438 + (ML20217M438)
- ML20217M443 + (ML20217M443)
- ML20217M445 + (ML20217M445)
- ML20217M446 + (ML20217M446)
- ML20217M449 + (ML20217M449)
- ML20217M452 + (ML20217M452)
- ML20217M454 + (ML20217M454)
- ML20217M455 + (ML20217M455)
- ML20217M456 + (ML20217M456)
- ML20217M457 + (ML20217M457)
- ML20217M458 + (ML20217M458)
- 05000254/LER-1998-013, :on 980131,discovered Insufficient Clearance Between Core Spray Test Return Valve & Pressure Suppression Chamber.Caused by Inattention to Detail in Original Design. Removed Pad to Restore Adequate Clearance + (ML20217M460)
- ML20217M461 + (ML20217M461)
- SVP-99-181, Forwards Biennial Update to Quad Cities Ufsar,Iaw 10CFR50.71(e).Update Includes Changes to Facility & Procedures & Are Current Through 990630 + (ML20217M462)
- ML20217M463 + (ML20217M463)
- ML20217M464 + (ML20217M464)
- ML20217M466 + (ML20217M466)
- ML20217M471 + (ML20217M471)
- ML20217M472 + (ML20217M472)
- ML20217M473 + (ML20217M473)
- IR 05000341/1997011 + (ML20217M475)
- ML20217M476 + (ML20217M476)
- 05000271/LER-1998-004, :on 980226,seven Day DG LCO Was Exceeded Due to Inadequate Guidance in Work Planning Procedure When Planning Work That Affects Block Walls.Grout Was Replaced & Completed on 980301 + (ML20217M477)
- ML20217M478 + (ML20217M478)
- 1CAN049806, Application for Amend to License DPR-51,changing Order of Channel Rotation During Outage for Scheduling Flexibility, While Still Requiring Rotation Schedule to Be Established for Operating Cycle + (ML20217M479)
- ML20217M480 + (ML20217M480)
- ML20217M483 + (ML20217M483)
- ML20217M485 + (ML20217M485)
- ML20217M487 + (ML20217M487)
- ML20217M489 + (ML20217M489)
- ML20217M492 + (ML20217M492)
- ML20217M493 + (ML20217M493)
- ML20217M497 + (ML20217M497)