ML20217M412

From kanterella
Jump to navigation Jump to search

Forwards Suppl SE Re Conformance to RG 1.97,rev 2.Review Completed of NNECO Requests & Determined That NNECO Has Provided Adequate Justification for Addl Deviations from RG 1.97,rev 2
ML20217M412
Person / Time
Site: Millstone 
Issue date: 04/30/1998
From: Mcdonald D
NRC (Affiliation Not Assigned)
To: Bowling M, Loftus P
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20217M416 List:
References
RTR-REGGD-01.097, RTR-REGGD-1.097 TAC-MA1066, TAC-MA1137, NUDOCS 9805050001
Download: ML20217M412 (2)


Text

'

April 30, -1998 -

l Mr. Martin L. Bowling Recov:ry Officer.- Millstone Unit 2 North cst Nucirr Energy C:mptny clo Ms. Patricia A. Loftus Director-Regulatory Affairs -

P.O. Box 128 -

Waterford, CT.06385

SUBJECT:

CONFORMANCE TO REGULATORY GUIDE 1.97, REVISION 2 (RG 1.97, REV. 2),

"lNSTRUMENTATION FOR LIGHT-WATER-COOLED NUCLEAR POWER PLANTS TO ASSESS PLANT ENVIRONS CONDITIONS DURING AND -

FOLLOWING AN ACCIDENT," MILLSTONE NUCLEAR POWER STATION, UNIT NO. 2 (TAC NOS. MA1066 and MA1137)

Dear Mr. Bowling:

By letters dated January 29,1998, and March 4,1998, Northeast Nuclear Energy Company

(NNECO) requested additional deviations from the RG 1.97, Rev. 2, recommendations for the
instrumentation that monitors the reactor coolant system.(RCS) pressure and heat removal by the containment heat removal system at the Millstone Nuclear Power Station, Unit No. 2.
The NRC staff has completed its review of NNECO'S requests and determined that NNECO has provided adequate justification for the additional deviations from RG 1.97, Rev. 2. The enclosed -

Supplemental Safety Evaluation provides the details of the NRC staff's review.'

LThis completes.all NRC staff actions related to the referenced TAC Numbers. If you have any

. questions, please contact me at (301) 415-1408.

Sincerely, Original signed by:

Dariel G. Mcdonald Jr., Senior Project Manager Special Projects Office - Licensing Office of Nuclear Reactor Regulation Docket No. 50-336

Enclosure:

- As stated cc w/ encl: See next page DISTRIBUTION:

M f-THarris (e'-mail only'TLH3)

- PUBLIC OGC SPO-L Reading ACRS SPO Reading -

JJDurr, Rl

)

WTravers '

g

}

PMcKee g.

LBorry -

l 3

q0-DMcDonald -

3 DOCUMENT NAME: G:\\ MCDONALD \\MA1137.SER <

T* enceive a cost r of this docuenent, huecate b the boa: "C* = Copy without ettschmentlerglosure

  • E" = Copy with attachment / enclosure

'N' = No copy OFFICE SPO-L:PM A

-,n SPO-L:LA\\ \\,9> SPl%4 Db l

l NAME DMeponaldMW LBerry

.D PN :Kee DATE 04 @ 98 N-04/4/98 3

04db8 04/ /08 04/ /98 W

OFFICIAL RECORD COPY Q '7

.pT8088Ed 74

[

M0N.[ @@@

A P

pn y

@ CEty UNITED STATES.

g g

NUCLEAR REGULATORY COMMISSION o

WASHINGTON, D.C. enana anni April 30, 1998 g

Mr. Martin L Bowling

' Recovery Officer-Millstone Unit 2 Northeast Nuclear Energy Company c/o Ms Patricia A. Loftus Drector-Regulatory Affairs P.O. Box 128

. Waterford, CT 06385

SUBJECT:

CONFORMANCE TO REGULATORY GUIDE 1.97, REVISION 2 (RG 1.97, REV. 2),

" INSTRUMENTATION FOR LIGHT-WATER-COOLED NUCLEAR POWER i

l PLANTS TO ASSESS PLANT ENVIRONS CONDITIONS DURING AND -

FOLLOWING AN ACCIDENT " MILLSTONE NUCLEAR POWER STATION,

' UNIT NO. 2 (TAC NOS. MA1066 and MA1137)

Dear Mr. Bowling:

l By letters dated January 29,1998, and March 4,1998, Northeast Nuclear Energy Company (NNECO) requested additional deviations from the RG 1.97, Rev. 2, recommendations for the instrumentation that monitors the reactor coolant system (RCS) pressure and heat removal by the containment heat removal system at the Millstone Nuclear Power Station, Unit No. 2.

i i

The NRC staff has completed its review of NNECO'S requests and determined that NNECO has provided adequate justification for the additional deviations from RG 1.97, Rev. 2. The enclosed Supplemental Safety Evaluation provides the details of the NRC staff's review.

~ This completes all NRC staff actions related to the referenced TAC Numbers; if you have any questions, please contact me at (301) 415-1406.

I Sincerely, b

Daniel Gi Mcdonald Jr., Senior Project Manager Special Projects Office - Licensing Office of Nuclear Reactor Regulation Docket No. 50 356

Enclosure:

As stated cc w/ encl:. See next page i