. t  !

...

April 30, 1998 Mr. D. Senior Vice President Nuclear Generation

_The Detroit Edison Company l 6400 North Dixie Highway l Newport, MI 48166 i

SUBJECT: RESPONSE TIME TESTING ISSUES EXIT l

Dear Mr. Gipson:

l l On September 22,1997, the NRC completed an Engineering and Technical Support inspection l at your Enrico Fermi, Unit 2, facility. During that inspection, elimination of response time testing (RTT) under the provisions of 10 CFR 50.59 for trip functional units in the reactor protection I system and for trip units in the isolation and core cooling systems was also reviewed. At the l end of the inspection, elimination of RTT under 10 CFR 50.59 appeared to involve violations of I NRC requirements; however, no violations were issued due to the need to consider potential generic concerns revealed through similar concems at several other BWRs. The issue was subsequently documented in inspection Report 50-341/97011(DRS) as an unresolved item -

pending NRC resolution of the generic concems.

i An in-office review of the involved documentation was completed April 6,1998. No on-site l inspection was necessary to resolve these issues, inspection Report 50-341/98005(DRS),

issued April 10,1998, which documented the results of that review, stated in error that l a telephonic exit interview was conducted at the conclusion of our in-office review. That exit interview was not conducted. Consequently, we plan to meet with you on May 6,1998, at 1:00 p.m. (EDT) to discuss the RTT issues.

'

No response to Inspection Report 50-341/98005(DRS) is necessary at this time. We will discuss plans for response to that report during our May 6,1998, meeting.

Sincerely,

/s/ J. A. Grobe John A. Grobe, Director l Division of Reactor Safety Docket No. 50-341 License No. NPF-43 l

See Attached Distribution:

DOCUMENT NAME: G:DRS\ FERMI.LTR (See Previous Concurrence)

To receive a copy of this document, indicate in the box 'C's Co w without attachment / enclosure 'E" = Copy with attachmenUenclosure *N" = No copy OFFICE . Rill:DRS Rill:DRS Rill:DRP Rlil:DRS NAME RWestberg:Ic/sdY JJacobson BBurgess 8 JGro [

DATE 04/ /98 04/ /98 04/ 198 OM /98 OFFICIAL RECORD COPY I

9905050015 990430 PDR ADOCK 05000341 4 i' e PDR o )

. i

.

.

Mr. D. Senior Vice President

'

Nuclear Generation The Detroit Edison Company 6400 North Dixie Highway Newport, MI 48166 SUBJECT: RESPONSE TIME TESTING ISSUES EXIT

Dear Mr. Gipson:

)

On September 22,1997, the NRC completed an Engineering and Technical Support inspection at your Enrico Fermi, Unit 2, facility During that inspection, elimination of response time testing (RTT) under the provisions of 10 CFR 50.59 for trip functional units in the reactor protection system and for trip units in the isolation and core cooling systems was also reviewed. At the end of the inspection, elimination of RTT under 10 CFR 50.59 appeared to involve violations of NRC requirements; however, no violations were issued due to similar concerns at several other BWRs. The issue was subsequently documented in Inspection Report 50-341/97011(DRS) as an unresolved item pending NRC resolution of the generic concems.

An in-office review of the involved documentation was completed between March 20 and April 6,1998; however, no additional on-site inspection time was expended on these issues.

Inspection report 50-341/98005(DRS), issued April 10,1998, which documented the results of .

that review, contained inaccurate information. No response to that report is required at this  !

time. We plan to meet with you on May 6,1998, at 1:00 p.m. (EDT) to discuss the RTT issues.

Sincerely,

!

John A. Grobe, Director

! Division of Reactor Safety Docket No. 50-341 License No. NPF-43 See Attached Distribution:

l DOCUMENT NAME: G:DRS\ FERMI.LTR To receive a copy of this document, indicate in the box "C" = Co>y without attachment /enclosuie "E" o Copy wim attachment / enclosure "N" = No copy OFFICE Riil:DRS C Rlll:DRS C Rlli:[pgP Rlll:DRS NAME RWeMic/sd Dcod hss JGrobe [

DATE 04S98 04W98 04h8 04/ /98 /98 OFFICIAL RECORD COPY

,

.

- cc: N. Peterson, Director Nuclear Licensing

' P. A. Marquardt, Corporate

. Legal Department Richard Whale, Michigan Public Service Commission Michigan Department of Environmental Quality.

Monroe County, Emergency Management Division Emergency Management Division, Ml Department of State Police (

( ..

l

1

_ _ _ _ _ - _ _ _ _

. Distribution:

CAC (E-Mail)

Proiect Mgr., NRR w/enci A. Beach w/enci J. Caldwell w/enci B. Clayton w/ encl SRI Fermi w/enci DRP w/enci TSS w/enci DRS (2) w/ encl Rlli PRR w/ encl PUBLIC IE-01 w/ enc!

Docket File w/enci GREENS LEO (E-Mail)

DOCDESK (E-Mail)

l

,

'

]

. I

'

a40029 I

/

____