Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20217K333 + (ML20217K333)
- ML20217K334 + (ML20217K334)
- ML20217K335 + (ML20217K335)
- ML20217K336 + (ML20217K336)
- ML20217K339 + (ML20217K339)
- ML20217K341 + (ML20217K341)
- ML20217K342 + (ML20217K342)
- ML20217K343 + (ML20217K343)
- ML20217K344 + (ML20217K344)
- ML20217K345 + (ML20217K345)
- ML20217K346 + (ML20217K346)
- ML20217K347 + (ML20217K347)
- ML20217K348 + (ML20217K348)
- 05000317/LER-1998-004, :on 980303,battery Charger Circuit Breakers Were Noted Missing from Seismic Positioner.Caused by Quality Issue Related to Vendor.All safety-related 480-volt Circuit Breakers Have Been Inspected + (ML20217K349)
- ML20217K351 + (ML20217K351)
- ML20217K352 + (ML20217K352)
- ML20217K353 + (ML20217K353)
- ML20217K356 + (ML20217K356)
- ML20217K357 + (ML20217K357)
- ML20217K358 + (ML20217K358)
- ML20217K361 + (ML20217K361)
- PY-CEI-NRR-2194, Forwards Response to NRC Re Violations Noted in Insp Rept 50-440/97-201 on 970217-0327.Corrective Actions: Calculation P11-12 Was Revised on 970305 + (ML20217K364)
- ML20217K365 + (ML20217K365)
- NRC-97-0076, Ro:On 970703,seismic Monitoring Instrumentation Sys Was Declared Inoperable.Seismic Instrumentation Was Not Located in RHR Complex Pump Room as Described in Ts.De Intends to Restore Instruments to Operable Status + (ML20217K369)
- 05000245/LER-1996-066, :on 960326,discovered LPCI Heat Exchangers Were Inoperable.Caused by Failure to Develop Adequate Heat Exchanger Performance Testing,Monitoring & Insp Program. Program Based on GL 89-13 Developed Prior to Restart + (ML20217K373)
- ML20217K375 + (ML20217K375)
- 05000278/LER-1999-005-03, :on 990920,uplanned Esfas During Planned Mod Activitives in Main CR Were Noted.Caused by Inattention to Detail by Individuals Performing Work.All CR Mods Were Ceased to Allow Review of Mod Work Packages.With + (ML20217K376)
- ML20217K378 + (ML20217K378)
- L-97-007, Forwards Annual Rept of Facility Changes,Tests & Expirements for Period of 951101-961031.Rept Provides Brief Description of Each Facility & Procedure Change & Summary of Safety Evaluations + (ML20217K379)
- ML20217K380 + (ML20217K380)
- ML20217K382 + (ML20217K382)
- ML20217K386 + (ML20217K386)
- ML20217K388 + (ML20217K388)
- ML20217K392 + (ML20217K392)
- ML20217K394 + (ML20217K394)
- ML20217K396 + (ML20217K396)
- BECO-LTR-97-106, Forwards Rept of Changes,Tests & Experiments for Period 960101-970421.Second Ltr to Be Submitted by 971107, Containing Changes Not Readily Summarized for Appropriate Inclusion in Rept Due to Administrative Oversight + (ML20217K397)
- ML20217K398 + (ML20217K398)
- VPN-068-97, NPDES Noncompliance Notification:On 970906,pH Lower Limit of 6.0 at Discharge & Dilution Structure Was Exceeded.Caused by Workers Rinsing Sodium Bisulfite Barrels Into Outfall.Wrote Procedure to Require Barrel Rinsing Into Floor Drain Sys + (ML20217K399)
- ML20217K401 + (ML20217K401)
- ML20217K402 + (ML20217K402)
- ML20217K404 + (ML20217K404)
- ML20217K405 + (ML20217K405)
- ML20217K406 + (ML20217K406)
- ML20217K407 + (ML20217K407)
- ML20217K408 + (ML20217K408)
- IR 05000498/1997099 + (ML20217K410)
- ML20217K411 + (ML20217K411)
- ML20217K414 + (ML20217K414)
- ML20217K415 + (ML20217K415)
- ML20217K416 + (ML20217K416)