Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20217K283 + (ML20217K283)
- IR 05000413/1999302 + (ML20217K286)
- ML20217K287 + (ML20217K287)
- IR 05000482/1998009 + (ML20217K288)
- ML20217K290 + (ML20217K290)
- ML20217K294 + (ML20217K294)
- ML20217K297 + (ML20217K297)
- B17178, Forwards Response to Violations Noted in Insp Rept 50-423/98-82.Corrective Actions:Database Software Tool Smartbook Used to Store Data & Develop MOV Target Thrust/ Torque Calculations Used to Establish Design Requirements + (ML20217K299)
- ML20217K300 + (ML20217K300)
- ML20217K301 + (ML20217K301)
- ML20217K304 + (ML20217K304)
- ML20217K305 + (ML20217K305)
- ML20217K307 + (ML20217K307)
- ML20217K310 + (ML20217K310)
- NOC-AE-000111, Submits Listed Info in Support of Request for Relief from IWA 5250 of Section XI of ASME Boiler & Pressure Code in Order to Defer Permanent Repair of Flaw Identified in STP Unit 2 Ecw Sys Piping + (ML20217K311)
- 05000440/LER-1999-004, :on 990916,loss of Safety Function Resulted in TS 3.0.3 Entry.Caused by Design Deficiency in Control Complex Architectural Walls.Revised Storm Contingencies Instructions.With + (ML20217K312)
- ML20217K313 + (ML20217K313)
- U-602989, Annual Radioactive Effluent Release Rept for Clinton Power Station,Jan-Dec 1997 + (ML20217K314)
- ML20217K316 + (ML20217K316)
- ML20217K317 + (ML20217K317)
- ML20217K318 + (ML20217K318)
- ML20217K320 + (ML20217K320)
- ML20217K322 + (ML20217K322)
- ML20217K325 + (ML20217K325)
- ML20217K326 + (ML20217K326)
- ML20217K327 + (ML20217K327)
- ML20217K328 + (ML20217K328)
- ML20217K329 + (ML20217K329)
- ML20217K330 + (ML20217K330)
- ML20217K333 + (ML20217K333)
- ML20217K334 + (ML20217K334)
- ML20217K335 + (ML20217K335)
- ML20217K336 + (ML20217K336)
- ML20217K339 + (ML20217K339)
- ML20217K341 + (ML20217K341)
- ML20217K342 + (ML20217K342)
- ML20217K343 + (ML20217K343)
- ML20217K344 + (ML20217K344)
- ML20217K345 + (ML20217K345)
- ML20217K346 + (ML20217K346)
- ML20217K347 + (ML20217K347)
- ML20217K348 + (ML20217K348)
- 05000317/LER-1998-004, :on 980303,battery Charger Circuit Breakers Were Noted Missing from Seismic Positioner.Caused by Quality Issue Related to Vendor.All safety-related 480-volt Circuit Breakers Have Been Inspected + (ML20217K349)
- ML20217K351 + (ML20217K351)
- ML20217K352 + (ML20217K352)
- ML20217K353 + (ML20217K353)
- ML20217K356 + (ML20217K356)
- ML20217K357 + (ML20217K357)
- ML20217K358 + (ML20217K358)
- ML20217K361 + (ML20217K361)
- PY-CEI-NRR-2194, Forwards Response to NRC Re Violations Noted in Insp Rept 50-440/97-201 on 970217-0327.Corrective Actions: Calculation P11-12 Was Revised on 970305 + (ML20217K364)