Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20216G670 + (ML20216G670)
- 05000461/LER-1998-010, :on 971217,Divs 1 & 2 H & Oxygen Analyzers Were Declared Inoperable Due to Inadequate Commercial Grade Dedication of safety-related Replacement Parts by Supplier. Evaluated Installed Parts for Acceptability + (ML20216G672)
- ML20216G674 + (ML20216G674)
- IR 05000238/1998201 + (ML20216G682)
- ML20216G683 + (ML20216G683)
- ML20216G686 + (ML20216G686)
- ML20216G691 + (ML20216G691)
- ML20216G694 + (ML20216G694)
- ML20216G698 + (ML20216G698)
- ML20216G701 + (ML20216G701)
- JAFP-98-0128, Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant + (ML20216G706)
- VPN-022-98, Transmits Diskette Containing semi-annual SNM Status Rept for Period 971001 to 980331 & Printed Listing of Each Data File.W/O Diskette + (ML20216G710)
- ML20216G711 + (ML20216G711)
- ML20216G715 + (ML20216G715)
- ML20216G716 + (ML20216G716)
- ML20216G720 + (ML20216G720)
- 05000293/LER-1997-004-01, Forwards LER 97-004-01, Loss of Preferred Off-Site Power & Oil Spill Due to Main Transformer Fault While Shut Down. Commitment Made by Util,Listed + (ML20216G723)
- IR 05000353/1997009 + (ML20216G732)
- ML20216G733 + (ML20216G733)
- ML20216G736 + (ML20216G736)
- ML20216G741 + (ML20216G741)
- ML20216G742 + (ML20216G742)
- PY-CEI-NRR-2274, Forwards Rept of Facility Changes,Tests & Experiments for Perry Nuclear Power Plant.Changes,Tests & Experiments Reported for Period 960410-971023.Attachment 1 Defines Acronyms & Format Description + (ML20216G745)
- ML20216G749 + (ML20216G749)
- ML20216G761 + (ML20216G761)
- ML20216G763 + (ML20216G763)
- ML20216G764 + (ML20216G764)
- ML20216G766 + (ML20216G766)
- ML20216G767 + (ML20216G767)
- B17119, Provides Final Response to RAI Raised at Public Meeting on 980219,w/NRC & NNECO Pertaining to Recirculation Spray Sys at Millstone Nuclear Power Station,Unit 3.NNECO Provided Response to NRC Questions 1,2, & 4.Question no.3 Attached + (ML20216G770)
- ML20216G773 + (ML20216G773)
- ML20216G774 + (ML20216G774)
- ML20216G777 + (ML20216G777)
- BSEP-98-0037, Application for Amends to Licenses DPR-62 & DPR-72,revising Basis for Removing Suppression Chamber Temp Water Temp Monitoring Instrumentation Requirements + (ML20216G784)
- 05000334/LER-1997-025, :on 970807,ground in Feedwater Flow Controller Resulted in High SG Level & Subsequent Turbine Trip/Reactor Trip.Caused by Mfg Defect on Circuit Card.Formed Event Response Team + (ML20216G785)
- IR 05000271/1997007 + (ML20216G790)
- ML20216G792 + (ML20216G792)
- ML20216G793 + (ML20216G793)
- ML20216G796 + (ML20216G796)
- ML20216G800 + (ML20216G800)
- ML20216G804 + (ML20216G804)
- ML20216G806 + (ML20216G806)
- ML20216G809 + (ML20216G809)
- ML20216G815 + (ML20216G815)
- BSEP-98-0060, Informs That OAP-025, Bnp Integrated Scheduling, Will Be Revised to Clearly Establish Restrictions on Removing DG from Svc Concurrent W/Other High Safety Significant Sys as Listed + (ML20216G816)
- ML20216G818 + (ML20216G818)
- ML20216G820 + (ML20216G820)
- IR 05000288/1997202 + (ML20216G823)
- 3F0498-15, Forwards Response to Violations Noted in Insp Rept 50-302/98-02.Corrective Actions:Listing of Plant Equipment Utilized for in-plant Actions,By Tag Number Equipment Noun Name & Plant Location,Compiled from Review of Each EOP + (ML20216G824)
- SVP-98-130, Responds to NRC Re Violations Noted in Insp Repts 50-254/97-28 & 50-265/97-28.Corrective Actions:Qcop 6600-01 Was Revised to Require Performance of Qcos 5750-09 to Ensure Adequate Flow When Affected Valve Has Been Manipulated + (ML20216G829)
- ML20216G830 + (ML20216G830)