Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215K589 + (ML20215K589)
- 05000352/LER-1986-045-01, :on 860910,NSSS Shutoff Sys Isolated Due to Use of Loose Fitting Test Lead During Performance of Surveillance Test.Caused by Personnel Error.Personnel Counseled.Related Correspondence + (ML20215K590)
- ML20215K591 + (ML20215K591)
- ML20215K592 + (ML20215K592)
- ML20215K593 + (ML20215K593)
- ML20215K594 + (ML20215K594)
- TXX-6538, Final Deficiency Rept Re Base Metal Damage on Embedded Channels.Initially Reported on 870316.Rework Activities for 6.9 Kv Switchgear Will Be Completed by 870717 for Unit 1 & 871127 for Unit 2 + (ML20215K596)
- ML20215K597 + (ML20215K597)
- ML20215K598 + (ML20215K598)
- ML20215K600 + (ML20215K600)
- ML20215K601 + (ML20215K601)
- ML20215K602 + (ML20215K602)
- ML20215K603 + (ML20215K603)
- ML20215K604 + (ML20215K604)
- BECO-87-070, Forwards Status Rept Re Progress Toward Resolution of Items Identified in NRC ,Per Request.Status Shown as of 870415.Progress & Effectiveness of Actions Monitored,W/ Verification & Validation of Completion Documentation + (ML20215K606)
- ML20215K607 + (ML20215K607)
- ML20215K610 + (ML20215K610)
- ML20215K611 + (ML20215K611)
- 05000250/LER-1986-034, :on 860921,during Performance of Secondary Plant Periodic Tests,Reactor Trip & Auxiliary Feedwater Actuation Occurred.Caused by Personnel error.Pre-amp for Source Range Neutron Flux Detector Replaced + (ML20215K613)
- ML20215K615 + (ML20215K615)
- ML20215K616 + (ML20215K616)
- ML20215K617 + (ML20215K617)
- ML20215K618 + (ML20215K618)
- ML20215K620 + (ML20215K620)
- 05000267/LER-1986-027, :on 860921,w/reactor Sump Release in Progress, Health Physics Personnel Discovered That Continuous Sampler Pump Not in Svc.Caused by Personnel Error.Loose Ground Wire in Pump Breaker Cubicle Terminated + (ML20215K621)
- ML20215K622 + (ML20215K622)
- ML20215K625 + (ML20215K625)
- ML20215K628 + (ML20215K628)
- ML20215K629 + (ML20215K629)
- ML20215K630 + (ML20215K630)
- ML20215K632 + (ML20215K632)
- ML20215K633 + (ML20215K633)
- ML20215K634 + (ML20215K634)
- U-600823, Forwards Addl Info Re Remedial Corrective Action Taken Concerning 870106 Response to Violation Noted in Insp Rept 50-461/86-65,including Closed Condition Repts from Recent Fuel Handling Events + (ML20215K636)
- ML20215K637 + (ML20215K637)
- ML20215K638 + (ML20215K638)
- B12270, Forwards Reviews of Listed Isap Topics Re Generic Ltr 83-28, Including Topic 1.32, Item 2.1,Equipment Classification & Vendor Interface... & Topic 1.41, Item 4.5.1,Reactor Trip Sys Functional Testing, Per Util 850517 Commitment + (ML20215K639)
- ST-HL-AE-2169, Forwards Nonproprietary WCAP-11488 & Rev 1 to Proprietary WCAP-11273, Westinghouse Setpoint Methodology for Protection Sys,South Texas Project. Westinghouse Also Encl.Proprietary Rept Withheld (Ref 10CFR2.790) + (ML20215K640)
- ML20215K642 + (ML20215K642)
- IR 05000250/1986032 + (ML20215K643)
- ML20215K644 + (ML20215K644)
- ML20215K646 + (ML20215K646)
- ML20215K647 + (ML20215K647)
- ML20215K649 + (ML20215K649)
- IR 05000353/1987002 + (ML20215K651)
- 05000348/LER-1986-018, :on 860808,09 & 0923,hourly Firewatch Patrol Not Performed Per Tech Spec 3.7.12.Caused by Cognitive Personnel Errors.Personnel Counseled + (ML20215K653)
- ML20215K654 + (ML20215K654)
- ML20215K655 + (ML20215K655)
- ML20215K656 + (ML20215K656)
- ML20215K657 + (ML20215K657)
- A06492, Discusses Understanding Re Status of App R Mods.Required Implementation Schedule Met & No Interim Compensatory Measures Advocated by Util or Approved by NRC + (ML20215K658)