Forwards Annual Nonradiological Environ Repts for Facility for CY86.Summary of Sections & Analysis of Results Encl
ML20215K611
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 04/30/1987
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20215K614 List:
References
NUDOCS 8705110269
Download: ML20215K611 (3)


Text

~. .. . . . . _ - . , ~ . _ . _ . + . , - . .

l DUKE POWER COMPANY P.O. BOX 33189 CHARLOTTE, N.O. 28242

. HAL H. TUCKER nam -

- we r ., pq mg ..

saxamaa roosterson e

2 April 30, 1987 5

U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D..C. 20555

Subject:

Catawba Nuclear Station Docket Nos. 50-413 and 50-414 Annual Environmental Operating Report Dear Sire Enclosed please find a copy of the Annual Non-Radiological Environmental Report for the Catawba Nuclear Station Units 1 and 2 covering the 1986 calendar year. The report is being submitted in 'accordance with the Catawba Nuclear Station

! Environmental Protection Plan, Appendix B to Operating Licenses NPF-35 and NPF-52.

Very truly yours, 1 7

~

t Hal B. Tucker l

, JGT/31/sbn Attachment p xc: Dr. J. Nelson Grace, Regional Administrator l U. S. Nuclear Regulatory Commission

. Region II 101 Marietta Street, NW, Suite 2900 'T Atlanta, Georgia 30323

$f i Mr. P. K. Van Doorn

! NRC Resident Inspector j Catawba Nuclear Station i

i

R DR DO K O 00 {

i L. . _ , - _ , . . _ _ ,_,..__ _ __ _ ,,__ ,_..._._. _, _ - . , . . . - _ , _ _ . _

E o

Summaries and- Analyses of Results of Activities required by the EPP Section 4.2.1 - Aerial Remote Sensing Pre-Operational infrared photographs were obtained in 1983 and 1984. Operational data was obtained again in 1985 and 1986. The photographs and report are in Attachment 1, Aerial Remote Sensing.

To date, no damage to vegetation in the vicinity of the cooling tower has been observed with infrared photographs. However, some " scorching" or browning of loblolly pines have been observed in stands nearest the cooling towers. The factor (s) which have caused the browning have not been identified.

Section 4.2.2 - Sound Level Survey Operational Sound Level surveys were conducted in 1986 and compared to preoperational data. Noise attributed to cooling tower operation has not exceeded H.U.D. noise level criteria. The Unit 1 operational winter data are within the ranges measured during the preoperational period. The 2 Unit operational data will be collected during the summer and winter of 1987. The Sound Level Report is found in Attachment 2.

The following complaints were received in reference to noise. Note that complaints were not related to cooling tower fans. Two complaints / questions by the public were documented in 1986 (Attachment 3) related to noise at the station. Both of the contacts by the public were related to steam release events.

4.2.3 - Fog Monitoring The status of the fog monitoring is reviewed in Attachment 4. A report will be submitted at the conclusion of the monitoring period in the Annual Environmental Operating Report.

5. 4.1 (1) - EPP Non-Compliance and Corrective Actions
1. Failure to submit copy of proposed NPDES changes to the NRC at the same time it is submitted to the permitting agency.

CORRECTIVE ACTION:

Notification of EPP requirements to individuals responsible- for NPDES permit changes.- Revised page 7 of NPDES permit included as Attachment 5.

2. Failure to submit copies of NPDES permit violations to NRC.

CORRECTIVE ACTION:

Notification of EPP requirements to individuals responsible for NPDES permit changes. Copy of report is included as attachment 6.

5. 4.1 ( 2 ) - Changes in Station Design or Operation, Tests, and Experiments which Involve a- Potentially Significant Unreviewed Question There were no changes identified which involved a potentially significant Unreviewed Question.
5. 4.1 ( 3) - Nonroutine reports submitted in accordance with Subsection 5.4.2 of EPP.

There were no nonroutine events identified.

5. 4 .1 ( 4 ) - NPDES Reports Related to Matters Identified in Section 2.1 of the EPP Discharge Monitoring Reports:

Date Submitted Period Covered Submittals on: January 23, 1986 Oct - Dec 1984 April 22, 1986 Ja n - Ma r 1985 July 28, 1986 Apr -June 1985 October 27, 1986 July - Sept 85 NPDES Noncompliance September 3, 1986 NPDES noncompliance notification of approximately 100 gallons of 2000 ppm boron solution overflowed into a yard drain on August 30, 1986.