Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000293/LER-1987-005, :on 870331,loss of Preferred Offsite Power Occurred During Storm.Caused by Loss of Transmission Line 342 & Alternate Transmission Line 355 Becoming Isolated from Startup Transformer.Offsite Power Restored + (ML20215J726)
- ML20215J729 + (ML20215J729)
- ML20215J731 + (ML20215J731)
- PNO-I-86-086A, on 861022,NRC Inspectors Confirmed That Mo-99/ Tc-99m Generator Inadvertently Incinerated.Caused by Use of Nonfunctioning Survey Equipment & Poor Technique.Incinerator Shut Down Until Background Levels Achieved + (ML20215J733)
- ML20215J735 + (ML20215J735)
- PNO-IV-86-032, on 861023,boric Acid Corrosion on HPI Nozzle for Penetration Into Reactor Coolant Pump a Discharge Pipe discovered.Body-to-bonnet Leak on Manual Isolation Valve in HPI Apparent Source.B&W to Assist in Evaluation of Problem + (ML20215J736)
- ML20215J741 + (ML20215J741)
- ML20215J744 + (ML20215J744)
- ML20215J745 + (ML20215J745)
- ML20215J746 + (ML20215J746)
- ML20215J747 + (ML20215J747)
- ML20215J750 + (ML20215J750)
- ML20215J751 + (ML20215J751)
- TXX-6524, Interim Deficiency Rept CP-85-53 Re Seismic Category I Platforms.Initially Reported on 851220.Platform Previously Misidentified as Category II Now Classified Category I. Rework Will Be Performed.Next Rept Anticipated by 871220 + (ML20215J753)
- ML20215J755 + (ML20215J755)
- ML20215J756 + (ML20215J756)
- ML20215J757 + (ML20215J757)
- ML20215J758 + (ML20215J758)
- ML20215J759 + (ML20215J759)
- ML20215J761 + (ML20215J761)
- 05000266/LER-1987-001-01, :on 870404,unit Manually Tripped After 22 Control Rods Dropped.Reactor Engineer Incorrectly Connected Leads Shorting Out Test Instrument.Mods to Test Equipment to Prevent Hookup Errors Evaluated + (ML20215J762)
- ML20215J763 + (ML20215J763)
- IR 05000219/1987008 + (ML20215J764)
- A05947, Contends That Unit 1 Fully Complies W/Requirements of 10CFR50.44 W/O Need to Install Hydrogen Recombiners or Purge/Nitrogen Repressurization Sys,Per NRC 860812 Request + (ML20215J765)
- ML20215J766 + (ML20215J766)
- IR 05000341/1987001 + (ML20215J769)
- ML20215J772 + (ML20215J772)
- ML20215J773 + (ML20215J773)
- ML20215J774 + (ML20215J774)
- ML20215J776 + (ML20215J776)
- ML20215J779 + (ML20215J779)
- IR 05000454/1987001 + (ML20215J780)
- ML20215J781 + (ML20215J781)
- ML20215J782 + (ML20215J782)
- ML20215J783 + (ML20215J783)
- ML20215J784 + (ML20215J784)
- ML20215J786 + (ML20215J786)
- ML20215J788 + (ML20215J788)
- ML20215J789 + (ML20215J789)
- ML20215J790 + (ML20215J790)
- ML20215J791 + (ML20215J791)
- ML20215J793 + (ML20215J793)
- ML20215J796 + (ML20215J796)
- ML20215J798 + (ML20215J798)
- ML20215J799 + (ML20215J799)
- ML20215J801 + (ML20215J801)
- ML20215J803 + (ML20215J803)
- ML20215J805 + (ML20215J805)
- ML20215J806 + (ML20215J806)
- ML20215J808 + (ML20215J808)
- ML20215J809 + (ML20215J809)