ML20215J773

From kanterella
Jump to navigation Jump to search
Forwards App to SALP 6 Board Repts 50-454/87-01 & 50-455/87-01.Portions of SALP Rept Modified Based on 870128 Discussions & Util 870227 Comments.Issuance of App Serves as Final Step in SALP Assessment Process
ML20215J773
Person / Time
Site: Byron  Constellation icon.png
Issue date: 05/01/1987
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20215J775 List:
References
NUDOCS 8705080240
Download: ML20215J773 (2)


See also: IR 05000454/1987001

Text

.

- -

.

-

---

- - - .

--.

.- -

. - - .

-.

po

,

-

-

c

i

l

MAY

'1 1987

'

!

l

]

i

Docket No. 50-454

I

Docket No. 50-455

,

l

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

J

>

Chicago, IL 60690

4

i

Gentlemen:

,

!

This refers to the NRC's Systematic Assessment of Licensee Performance (SALP)

i

'

6 Board Report for the Byron Plant, and our meeting of January 28, 1987,

I

which discussed the contents of the report, and your written comments dated

i

February 27, 1987, relative to the report.

!

We have thoroughly reviewed and evaluated the context of your comments and

have reached the conclusions presented in the Appendix to this letter.

-

I

Based on our in-depth discussions during the meeting on January 28, 1987, and

1

i

further reiterated in your letter of response, certain portions of the SALP

Board Report have been modified as described in the attached Errata Sheet.

Corrected page(s) are included herein to update your copy of the SALP Board

,

{

Report.

Issuance of the Appendix serves as the final step in our SALP

assessment process.

>

j

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

t

'

Title 10, Code of Federal Regulations, a copy of this letter.with the

'

referenced attachments, will be placed in the NRC's Public Document Room.

I

j

No reply to thi:, letter is required; however, should you have questions on the

basis of conclusions reached by NRC, or if you need clarification on the changes

.

made to the SALP Report, please let us know and we will be pleased to discuss

j

them with you.

!

l

l

Sincerely,

j

8705080240 870501

e.

, ,

,

, n ,,

1

a

PDR

ADOCK 05000454

w g? ' ", ~ + m

<

1

,

G

PDR

As h e? C

l'

[

,

A. Bert Davis

.

'

Regional Administrator

l

1

Attachments:

1

i

1.

Appendix to SALP 6 Board

Reports No. 50-454/87001;

50-455/87001

4

l

2.

Errata Sheet

j

3.

Corrected Page(s) to SALP Rpt

4.

Licensee response ltr dtd 2/27/87

7 i

ee Attached Distribution

g9

'

W

III

R

RIII

RIII

RIII

4 7ZC

f

jp

hnpck

JMCo

k-Barger

ps

D

s

-

-

i

.

.

Coninonwealth Edison Company

2

Distribution

cc w/attahcments:

D. L. Farrar, Director

of Nuclear Licensing

V. I. Schlosser, Project Manager

Gunner Sorensen, Site Project

Superintendent

R. E. Querio, Plant Manager

DCS/RSB(RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII Byron

Resident Inspector, RIII

Braidwood

D. W. Cassel, Jr. , Esq.

Richard Hubbard

J. W. McCaffrey, Chief, Public

Utilities Division

Diane Chavez, DAARE/ SAFE

Steve Lewis, OGC

L. 01shan, NRR Licensing Project Manager

H. S. Taylor, Quality Assurance

Division

J. M. Taylor, Deputy Executive

Director for Regional Operations

T. E. Murley, Director, NRR

Regional Administrators

RI, RII, RIV, RV

L. W. Zech, Chairman

J. K. Asselstine, Commissioner

F. M. Bernthal, Commissioner

T. M. Roberts, Commissioner

K. M. Carr, Ccmmissioner

F. Maraglia, NRR Division Director

J. Lieberman, Office of Enforcement

M. R. Johnson, SALP Coordinator

RIII PRR

RIII SGA

State Liaison Officer, State

of Illinois

INP0

_ _ _

- _ _ _ _ - _ - _ _ - _ - _ _ _ _ _ _ - - _ _ _ _ _ - - _ _ - - _ _ _