ML20215J773
| ML20215J773 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 05/01/1987 |
| From: | Davis A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20215J775 | List: |
| References | |
| NUDOCS 8705080240 | |
| Download: ML20215J773 (2) | |
See also: IR 05000454/1987001
Text
.
- -
.
-
---
- - - .
--.
.- -
. - - .
-.
po
,
-
-
c
i
l
MAY
'1 1987
'
!
l
]
i
Docket No. 50-454
I
Docket No. 50-455
,
l
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Vice President
Post Office Box 767
J
>
Chicago, IL 60690
4
i
Gentlemen:
,
!
This refers to the NRC's Systematic Assessment of Licensee Performance (SALP)
i
'
6 Board Report for the Byron Plant, and our meeting of January 28, 1987,
I
which discussed the contents of the report, and your written comments dated
i
February 27, 1987, relative to the report.
!
We have thoroughly reviewed and evaluated the context of your comments and
have reached the conclusions presented in the Appendix to this letter.
-
I
Based on our in-depth discussions during the meeting on January 28, 1987, and
1
i
further reiterated in your letter of response, certain portions of the SALP
Board Report have been modified as described in the attached Errata Sheet.
Corrected page(s) are included herein to update your copy of the SALP Board
,
{
Report.
Issuance of the Appendix serves as the final step in our SALP
assessment process.
>
j
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
t
'
Title 10, Code of Federal Regulations, a copy of this letter.with the
'
referenced attachments, will be placed in the NRC's Public Document Room.
I
j
No reply to thi:, letter is required; however, should you have questions on the
basis of conclusions reached by NRC, or if you need clarification on the changes
.
made to the SALP Report, please let us know and we will be pleased to discuss
j
them with you.
!
l
l
Sincerely,
j
8705080240 870501
e.
, ,
,
, n ,,
1
a
ADOCK 05000454
w g? ' ", ~ + m
<
1
,
G
As h e? C
l'
[
,
A. Bert Davis
.
'
Regional Administrator
l
1
Attachments:
1
i
1.
Appendix to SALP 6 Board
Reports No. 50-454/87001;
50-455/87001
4
l
2.
Errata Sheet
j
3.
Corrected Page(s) to SALP Rpt
4.
Licensee response ltr dtd 2/27/87
7 i
ee Attached Distribution
g9
'
W
III
R
RIII
RIII
RIII
4 7ZC
f
jp
hnpck
JMCo
k-Barger
ps
D
s
-
-
i
.
.
Coninonwealth Edison Company
2
Distribution
cc w/attahcments:
D. L. Farrar, Director
of Nuclear Licensing
V. I. Schlosser, Project Manager
Gunner Sorensen, Site Project
Superintendent
R. E. Querio, Plant Manager
DCS/RSB(RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII Byron
Resident Inspector, RIII
Braidwood
D. W. Cassel, Jr. , Esq.
Richard Hubbard
J. W. McCaffrey, Chief, Public
Utilities Division
Diane Chavez, DAARE/ SAFE
Steve Lewis, OGC
L. 01shan, NRR Licensing Project Manager
H. S. Taylor, Quality Assurance
Division
J. M. Taylor, Deputy Executive
Director for Regional Operations
T. E. Murley, Director, NRR
Regional Administrators
RI, RII, RIV, RV
L. W. Zech, Chairman
J. K. Asselstine, Commissioner
F. M. Bernthal, Commissioner
T. M. Roberts, Commissioner
K. M. Carr, Ccmmissioner
F. Maraglia, NRR Division Director
J. Lieberman, Office of Enforcement
M. R. Johnson, SALP Coordinator
RIII PRR
RIII SGA
State Liaison Officer, State
of Illinois
INP0
_ _ _
- _ _ _ _ - _ - _ _ - _ - _ _ _ _ _ _ - - _ _ _ _ _ - - _ _ - - _ _ _