Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215J676 + (ML20215J676)
- ML20215J677 + (ML20215J677)
- ML20215J678 + (ML20215J678)
- ML20215J679 + (ML20215J679)
- ML20215J681 + (ML20215J681)
- ML20215J682 + (ML20215J682)
- ML20215J683 + (ML20215J683)
- ML20215J684 + (ML20215J684)
- ML20215J685 + (ML20215J685)
- 05000285/LER-1987-009, :on 870404,during Refueling Shutdown Condition, All Offsite Ac Power Was Lost.Caused by Worker Inadvertently Pulling Wrong Potential Transformer (PT) Fuses.Pt Fuses Associated W/Transformer Reinstalled + (ML20215J687)
- A05457, Forwards Results of RCS Seismic Reevaluations & Final Plans for Mods Identified in NRC Safety Evaluation of SEP Topic III-6.All Outstanding Issues Re Generic Ltr 84-04 & SEP Topic III-6 Resolved + (ML20215J689)
- 05000454/LER-1986-026-01, :on 860921,actuation of Control Room Ventilation Occurred.Caused by Lightning Strike on Offsite 138 Kv Transmission Line.Mods Installed in 1985 to Reduce Undervoltage Trip Setpoint + (ML20215J690)
- 3F0886-08, Responds to SALP Rept 50-302/86-13.Quality Audit Program Considered Essential Element of Nuclear Program.Recognition of Strong Maint Program Appreciated.Actions Taken to Resolve Security Deficiencies Noted + (ML20215J693)
- ML20215J694 + (ML20215J694)
- ML20215J696 + (ML20215J696)
- ML20215J698 + (ML20215J698)
- ML20215J699 + (ML20215J699)
- ML20215J701 + (ML20215J701)
- ML20215J702 + (ML20215J702)
- TXX-6431, Discusses Failure to Disposition Nonconformance Repts Re Resolution of Inspector Errors & Weld Separation Measurement Methodology Committed to in 870112 Response to Insp Rept 50-446/86-02.New Disposition & Compliance Dates Listed + (ML20215J704)
- 05000323/LER-1986-023, :on 860918,automatic Reactor Trip & Subsequent Turbine Trip Occurred.Caused by Main Feedwater Pump 2-2 Reducing to Min Speed While Plant Technicians Made Adjustments to Lovejoy Controller + (ML20215J705)
- ML20215J706 + (ML20215J706)
- BSEP-86-1431, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-324/86-18 & 50-325/86-17.Corrective Actions:Controlling Procedure WP-18 Revised & Individual Responsible for Rigging Scaffolding to Snubber Appropriately Disciplined + (ML20215J707)
- ML20215J710 + (ML20215J710)
- ML20215J711 + (ML20215J711)
- ML20215J712 + (ML20215J712)
- ML20215J713 + (ML20215J713)
- ML20215J715 + (ML20215J715)
- ML20215J717 + (ML20215J717)
- 05000213/LER-1987-004, :on 870406,fire Barrier Separating Cable Spreading Area & Turbine Bldg Declared Inoperable.Caused by Inadequate Engineering Involvement During Initial Installation of Seal.Fire Watch Established + (ML20215J718)
- ML20215J720 + (ML20215J720)
- ML20215J721 + (ML20215J721)
- ML20215J722 + (ML20215J722)
- IR 05000309/1986013 + (ML20215J724)
- ML20215J725 + (ML20215J725)
- 05000293/LER-1987-005, :on 870331,loss of Preferred Offsite Power Occurred During Storm.Caused by Loss of Transmission Line 342 & Alternate Transmission Line 355 Becoming Isolated from Startup Transformer.Offsite Power Restored + (ML20215J726)
- ML20215J729 + (ML20215J729)
- ML20215J731 + (ML20215J731)
- PNO-I-86-086A, on 861022,NRC Inspectors Confirmed That Mo-99/ Tc-99m Generator Inadvertently Incinerated.Caused by Use of Nonfunctioning Survey Equipment & Poor Technique.Incinerator Shut Down Until Background Levels Achieved + (ML20215J733)
- ML20215J735 + (ML20215J735)
- PNO-IV-86-032, on 861023,boric Acid Corrosion on HPI Nozzle for Penetration Into Reactor Coolant Pump a Discharge Pipe discovered.Body-to-bonnet Leak on Manual Isolation Valve in HPI Apparent Source.B&W to Assist in Evaluation of Problem + (ML20215J736)
- ML20215J741 + (ML20215J741)
- ML20215J744 + (ML20215J744)
- ML20215J745 + (ML20215J745)
- ML20215J746 + (ML20215J746)
- ML20215J747 + (ML20215J747)
- ML20215J750 + (ML20215J750)
- ML20215J751 + (ML20215J751)
- TXX-6524, Interim Deficiency Rept CP-85-53 Re Seismic Category I Platforms.Initially Reported on 851220.Platform Previously Misidentified as Category II Now Classified Category I. Rework Will Be Performed.Next Rept Anticipated by 871220 + (ML20215J753)
- ML20215J755 + (ML20215J755)
- ML20215J756 + (ML20215J756)