ML20215J720

From kanterella
Jump to navigation Jump to search
Summarizes Enforcement Conference W/Util on 870520 Re Recent Violations Noted in Insp Repts 50-424/87-30,50-424/87-27 & 50-424/87-12 Re Proper Sys Alignment & Attention to Detail. Attendees List Encl
ML20215J720
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 06/09/1987
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: James O'Reilly
GEORGIA POWER CO.
References
NUDOCS 8706250087
Download: ML20215J720 (3)


See also: IR 05000424/1987030

Text

'c lN

.

,

-

JUN 0 01987

1

Docket No. 50-424

!

License No. N' F-68

(

, Georgia Power Company

!

V ATTN: Mr. James P. O'Reilly

Senior Vice President-

Nuclear Operations

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: MEF71NG SUMMARY ENFORCEMENT CONFERENCE - V0GTLE FACILITY, UNIT 1,

DOCKET N0. 424

This refers to the Enforcement Conference conducted in the NRC Region II Office

on May 20,1987.

This meeting was held to discuss the recent violations

identified in NRC Inspection Reports 50-424/87-30, 50-424/87-27, and

50-424/87-12 involving Proper System 4lignment and Attention to Detail.

It is our opinion that this meeting';was beneficial and has provided additional

information on the Vogtle Unit 1 co'nponent alignment program.

This in-depth

presentation will better enable the NRC to further evaluate the issues involved

in the violations.

In accordance with Section 2.790 of NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, we will be pleased to

discuss them.

Sincerely,

5&J

u/jy

.

!

J. Nelson Grace

Regional Administrator

.

Enclosures:

1.

Attendance Lfst

2.

Georgia Power Company - Plant

Vogtle Unit 1 NRC Enforcement

Conference " Component Alignment",

May 20, 1987

cc w/encis:

(See page 2)

8706250087 e70609

PDR

ADOCK 0500

4

G

\\

f,Lb

i

i

. _ - - _ _ _ _ -

.

g

' Georgia Power Company

2

M 0 S 1987 -

. 'cy w/encls:

~

4

M.: D. Rice, Vice President, Project -

Engineering

c A . W. Hayes, Vogtle Quality

d,AssuranceManager

i

..

Bockhold, Jr., General Manager,

)

!

!

Nuclear Operations

. d Gucwa, Manager,~ Nuclear Safety

d.andLicensing

- .

.A. Bailey, Project Licensing

'

Manager

B. W. Churchill, Esq.,.Shaw,

d.Pittman, Potts and Trowbridge

.

E. Joiner, Troutman, Sanders,

d.LockermanandAshmore

.

(

Kirkland, III, Counsel,

Office of'the Consumer's Utility

.

Council

-lA Feig, Georgians Against

uclear Energy

.

. B. Margulies, Esq., Chairman,

Atomic Safety and Licensing Board

.

/ Panel

, VDr. O. H.. Paris, Administrative Judge

\\

Atomic Safety and Licensing Board

4

'

/ anel

P

VG. A. Linenberger, Jr., Administrative Judge

Atomic Safety and Licensing Board

Panel

j

l

Accw/ enc 1:

,

V F,. Reis, OGC

l

L41. Miller, NRR

!

M. Sinkule, RII

!

!

@DocumentControlD6skC Resident Inspector

!

L

State of Georgia

,

l

1

l

RII

1

-

Nff

RII

RII

RII

'

stnot:jw

MSinkule V84 mfg enkins

JS o r

LR es

6f)/87

6/3 /87 #/y87 6/4/87

6/

87

6/7/87

6/T/87

E-

F

a

ENCLOSURE 1

LIST OF ATTENDEES

U.S. - NRC- Region II

M. L. Ernst, Deputy, Regional Administrator

J. P. Stohr, Director, Division of Radiation Safety and Safeguards (DRSS)

L. A. Reyes, Director, Division of Reactor Projects (DRP)

G. R. Jenkins,.' Director, Enforcement and Investigation Coordination Staff

(EICS)'

V. L. Brownlee, Acting Deputy Director, DRP

R. J. Goddard, Regional Counsel

C. A. Julian, Chief, Operations Branch, Division of Reactor Safety

M. V. Sinkule, Chief, Section 2C, DRP

T. R. Decker, Chief. Emergency Preparedness Section, DRSS'

B. Uryc..Enfcccement Coordinator, EICS

J. F. Rogge, Senior Resident Inspector - Operations, Section 2C, DRP

'R. J. Schepens, Resident Inspector - Operations, Section 2C, DRP

B. K. Revsin, Radiation Specialist, Facilities Radiation Protection (FRP).

Section, DRSS

F. N. Wright, Radiation Specialist, FRP, DRSS

E. F. Christnot, Project Engineer, Section 2C, DRP

U.S. - NRC Reactor Regulations

M. S. Miller, Project Manager Vogtle, Project Directorate 11-3

Georgia Power Company.

i

J. P. O'Reilly, Senior Vice President - Nuclear Operations

T..Greene, Plant Manager, Vogtle

J.. F. D' Amico, Manager, Nuclear Safety and Compliance

W. E.- Burns, Manager, Nuclear Licensing

D. G. Smith, Manager, Nuclear. Performance and Analysis

C. C..Eckert, Manager, Nuclear Safety and Engineering

J. E. Swartzwelder, Deputy Manager - Operations Vogtle

4

J. Hopkins, Shift Supervisor, Vogtle

]

H. Schurman, Plant Equipment Operator, Vogtle

l

i