Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215F803 + (ML20215F803)
- ST-HL-AE-1847, Provides Results of Small Break LOCA Reanalysis to Resolve NUREG-0737,Item II.K.3.31,per SER (NUREG-0781) Confirmatory Item 34.Marked-up Pages to FSAR Section 15.6.5,providing Present Analysis Results & Associated Tables & Figures,Encl + (ML20215F805)
- ML20215F806 + (ML20215F806)
- 05000316/LER-1950-316, Advises That Event Described in LER 50-316/86-25 Determined Not Reportable,Per Vendor Info & Engineering Evaluation. Raychron Replacement Timers Seismically Qualified for Use in Exide Battery Chargers.Ler Number Will Not Be Rei + (ML20215F807)
- ML20215F808 + (ML20215F808)
- ML20215F809 + (ML20215F809)
- ML20215F812 + (ML20215F812)
- ML20215F815 + (ML20215F815)
- ML20215F816 + (ML20215F816)
- IR 05000456/1986046 + (ML20215F817)
- IA-87-296, Responds to FOIA Request for Records for Specified Vendors Re Failures or Deficiencies Affecting Plant Safety.Records Re Request Available in PDR + (ML20215F818)
- ML20215F818 + (ML20215F818)
- ML20215F821 + (ML20215F821)
- ML20215F823 + (ML20215F823)
- ML20215F825 + (ML20215F825)
- ML20215F826 + (ML20215F826)
- ML20215F828 + (ML20215F828)
- ML20215F830 + (ML20215F830)
- ML20215F831 + (ML20215F831)
- ML20215F833 + (ML20215F833)
- ML20215F836 + (ML20215F836)
- ML20215F838 + (ML20215F838)
- ML20215F841 + (ML20215F841)
- 05000354/LER-1986-086, :on 861114,reactor Bldg Ventilation Sys Isolated & Filtration,Recirculation & Ventilation Sys Automatically Actuated from Valid High Radiation Signal. Caused by Steam Leak in RWCU Sys.Leak Repaired + (ML20215F842)
- ML20215F843 + (ML20215F843)
- ML20215F844 + (ML20215F844)
- ML20215F845 + (ML20215F845)
- ML20215F853 + (ML20215F853)
- ML20215F855 + (ML20215F855)
- ML20215F856 + (ML20215F856)
- DD-86-17, Advises That Time for Commission to Review Directors Decision DD-86-17 Expired.Commission Declined Review. Decision Became Final Agency Action on 861215.Served on 861222 + (ML20215F857)
- ML20215F858 + (ML20215F858)
- ML20215F860 + (ML20215F860)
- ML20215F862 + (ML20215F862)
- ML20215F866 + (ML20215F866)
- ML20215F867 + (ML20215F867)
- 05000328/LER-1987-006-02, :on 870518,discovered Error in Core Cycle Exposure & Height Dependent Power Factor.Caused by Personnel Error in Utilization of Vendor Supplied Data.Qa Qualification of Incore Will Validate Program + (ML20215F869)
- ML20215F870 + (ML20215F870)
- ML20215F871 + (ML20215F871)
- ML20215F872 + (ML20215F872)
- IR 05000344/1986045 + (ML20215F875)
- ML20215F880 + (ML20215F880)
- ML20215F882 + (ML20215F882)
- W3P86-2556, Notifies of Vacancy in Plant Radiation Protection Group Due to Transfer of Radiation Protection Superintendent.Steps Taken to Minimize Impact Upon Health Physics Activities, Pending Selection of Permanent Replacement by 861115 + (ML20215F883)
- ML20215F884 + (ML20215F884)
- ML20215F891 + (ML20215F891)
- ML20215F893 + (ML20215F893)
- ML20215F894 + (ML20215F894)
- ML20215F896 + (ML20215F896)
- 05000354/LER-1986-087, :on 861117,Channel a Nuclear Steam Supply Shutoff Sys Isolation Logic Inadvertently Actuated.Caused by Personnel Error Resulting in Momentary Loss of Power. Technicians Will Be Counseled + (ML20215F897)
- ML20215F898 + (ML20215F898)