Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215E103 + (ML20215E103)
- ML20215E106 + (ML20215E106)
- ML20215E107 + (ML20215E107)
- IR 05000155/1986014 + (ML20215E110)
- ML20215E111 + (ML20215E111)
- ML20215E113 + (ML20215E113)
- ML20215E114 + (ML20215E114)
- ML20215E115 + (ML20215E115)
- AECM-86-0309, Provides Proposed long-term Corrective Actions for Inadequate Flow to ESF Switchgear Room Coolers,Per Util .Mod & Hydrolazing Completed on Div 1 Piping.Div 2 Piping Will Also Be Cleaned During First Refueling Outage + (ML20215E117)
- ML20215E119 + (ML20215E119)
- ML20215E120 + (ML20215E120)
- ML20215E123 + (ML20215E123)
- ML20215E125 + (ML20215E125)
- ML20215E126 + (ML20215E126)
- ML20215E127 + (ML20215E127)
- ML20215E128 + (ML20215E128)
- ML20215E129 + (ML20215E129)
- NLS8700278, Forwards Safeguards Plan,Rev 19.Encl Change Does Not Decrease Safeguards Effectiveness of Plan.W/O Encl + (ML20215E132)
- ML20215E136 + (ML20215E136)
- ML20215E142 + (ML20215E142)
- ML20215E148 + (ML20215E148)
- ML20215E149 + (ML20215E149)
- ML20215E150 + (ML20215E150)
- ML20215E153 + (ML20215E153)
- ML20215E154 + (ML20215E154)
- ML20215E158 + (ML20215E158)
- ML20215E159 + (ML20215E159)
- ML20215E160 + (ML20215E160)
- ML20215E161 + (ML20215E161)
- ML20215E163 + (ML20215E163)
- ML20215E164 + (ML20215E164)
- ML20215E165 + (ML20215E165)
- ML20215E167 + (ML20215E167)
- ML20215E168 + (ML20215E168)
- ML20215E170 + (ML20215E170)
- IA-87-286, Responds to FOIA Request Re Reactor Vessel Surveillance Capsules of Plant.Forwards Documents Listed in App B.Apps a & B Documents Also Available in PDR + (ML20215E171)
- ML20215E171 + (ML20215E171)
- ML20215E173 + (ML20215E173)
- ML20215E176 + (ML20215E176)
- 05000247/LER-1986-037, :on 861106,reactor Trip Breaker B Opened During Performance of Monthly Surveillance Testing of Analog Bistables.Caused by Failure in One or More of Three Westinghouse BF66 Relays.Relays Replaced + (ML20215E177)
- L-76-363, Forwards Reactor Vessel Matl Surveillance & Fracture Mechanics Evaluations for Turkey Point Units 3 & 4 Nuclear Power Plants, Per 10CFR50,App H & Reg Guide 10.1.Rept Includes Capsule T Analysis & Accident Analysis + (ML20215E178)
- ML20215E179 + (ML20215E179)
- ML20215E180 + (ML20215E180)
- ML20215E181 + (ML20215E181)
- ML20215E182 + (ML20215E182)
- ML20215E183 + (ML20215E183)
- RBG-24889, Addendum to Semiannual Radioactive Effluent Release Rept Jan-June 1986 + (ML20215E184)
- ML20215E186 + (ML20215E186)
- IA-86-787, Transcript of 850904 Meeting in Bethesda,Md Re Util Planned Action on 850609 Event.Pp 1-235.Supporting Documentation Encl,Incuding NRC 850828 Meeting Agenda & Viewgraphs of Util 850917 Presentation to NRC + (ML20215E187)
- ML20215E187 + (ML20215E187)
- ML20215E188 + (ML20215E188)