ML20215E125
| ML20215E125 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 10/06/1986 |
| From: | Travers W Office of Nuclear Reactor Regulation |
| To: | Harold Denton, Miraglia F Office of Nuclear Reactor Regulation |
| References | |
| CON-NRC-TMI-86-099, CON-NRC-TMI-86-99 NUDOCS 8610150062 | |
| Download: ML20215E125 (3) | |
Text
I, l
\\
x October 6, 1986
'N'
~
NRC/T?lI-86-099 2d Q -$
tiEtiORANDut1 FOR:
Harold R. Denton, Director Office of I?uclear Reactor Regulation Frank J. I11raglia, Director Division of PWR Licensing-B FROII:
William D. Travers, Director THI-2 Cleanup Project Directorate SU3 JECT:
HRC 1111-2 CLEANUP PROJECT DIRECTORATE llEEKLY STATUS REPORT FOR SEPTEMBER 29 - OCTOBER 5 1986 1.
D_EFUELING Removal of end fittings from the debris bed continued throughout the week and was completed during the weekend. Twenty-tuo end fittings were renoved using a three point gripper. Three were placed in fuel Cdnisters, the remaining 19 were stored in five end fitting storage druas. Recoval of the end fittings has cleared the bed for additional core boring.
Pick and place defueling is now in progress and will continue until the licensee begins installation of the core bore equipment in about one week.
Water clarity has improved significantly as a result of Defueling liater Cleanup System (DWCS) operations. Long-tena water clarity continues to be a problem and is compounded by the short operational lifetime of DWCS filters.
Efforts continue to solve the clarity and filter plugging problems.
2.
ENVIR0fa! ENTAL liONITORING US Environmental Protection Agency (EPA) sample analysis results show that TitI site liquid effluents are in accordance with regulatory limits, NRC requirements, and The City of Lancaster Agreement.
The Lancaster water sample taken at the water works river intake and analyzed by EPA consisted of a seven day composite sample taken September 14 - 20, 1986. A gamna scan detected no reactor related activity.
Tril water samples taken by EPA at the plant discharge (includes Units 1 and.2) to the river consisted of seven daily composite 8610150062 861006
[DR ADOCK 05000320 PDR sun. aosa >
ECTE D wac rosu u s no-so> nacu o24o OFFICIAL RECORD COPY
ddrold R. Denton.
2 October 6, 1986 Frank J._ Hiraglia HRC/TMI-86-099 c'
samples taken from September 13 - 20, 1936. A gauaa :;can detected no reactor related activity except.
The EPA analyses of the t'RC cutdoor air sample for the period Septc:.her 25 - Octcber 2,1986 shcued that concentrctions of Cs-137 cnd I-131 were belcu the lower licit of quantitative detection (LLD) for the system. The LLD varies arcund a value of IE-13 uCi/cc.
3.
AUXILIARY AfiD FUEL HAfiDLIGG BUILDIHG ACTIVITIES Start-up testing of the sludge transfer system continues.
4.
NRC EVALUATI0fiS IN PROGRESS Technical Specification Chenge Request nuabars 49, 51, 52, er.d 54.
Recovery Operations Plan Change nurbers 31 end 33.
Solid Maste Facility Technical Evaluation Report.
lleevy Load Safety Evaluation Report, Revision 3.
Disposal of Processed Water Report.
Sediment Transfer and Processing System SER.
End Fitting Storege SEP. was approved on Septeaber 25, 1986.
SER for Use of Plasaa Arc Cutting Torch.
Core ficre Operations (as a defueling methed).
5.
PUBLIC MEETItiG, The next ueeting of the Advisory Panel for the Decentamination of Three Mile Island Unit 2 will be held on October 8,1986 at the Ifoliday Inn, Center City, liarrisburg, PA from 7:00 PM to 10:00 Pli.
At this meeting the licensee vill brief the Panel on the progress of defueling and on the status of fuading for the renaindar of the cleanup.
The EPA will present the results of its recent revicw of the Till offsite radiation monitoring prograu. Members of the public will be given the opportunity to address the panel.
Persons desiring to speak before the Advisory Panel are requested to contact Mr. Thomas Soithgall at 717-291-1042, or write hir; at 2133 liarietta Avenue, Lancaster, PA 17603.
omoe4AL 880tED 8Y8 wmiam D. Davon Williau D. Travers Director THI-2 Cleanup Project Directorate
- C'>
Qa"^* >
^">
nac ronu ais noso) uncu o24 OFFICIAL RECORD COPY
]
'je -
' ~
-Harold R. Denton 3
October 6,1936 Frank J. litraglia ~
HRC/Ti!I-86-099 IllTERNAL DISTRIBUTION
~lilTRAL FILE C
NRC POR LOCAL PDR EDO OGC EPA DOE RI Regional Administrator RI Division Directors Public Affairs, RI State Liaison, RI THI HQ r/f TMI SITE r/f Till-2 Project Section File THI-1 Resident Office (5)
TMI Cleanup Project Directorate (14)
A OF FICE ).T.M.
..T.M.I.C..
.TMIC.P.D
,,T,flI,P g
,a.
7.,
su-+.J.T....as.:.J.e.s.
..CC.o.w.a. y....
7
..W
.a................
osasp 10/ (, /.86
..../.6../.86
.,///,86 10
- 10../../.86 10 NRC FORM 318 (10 80) NRCM O240 OFFICIR RECORD COPY