Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20213D860 + (ML20213D860)
- ML20213D863 + (ML20213D863)
- ML20213D865 + (ML20213D865)
- IR 05000302/1986032 + (ML20213D866)
- ML20213D867 + (ML20213D867)
- ML20213D870 + (ML20213D870)
- 05000482/LER-1986-056, :on 861010,discovered That Improper Method Used for Verifying Boron Dilution Alarm Setpoint of Source Range Nuclear Instrumentation.Caused by Error in Vendor Manual. Proper Voltage Settings Incorporated in Manual + (ML20213D872)
- ML20213D873 + (ML20213D873)
- 05000341/LER-1986-035, :on 861005,manual Reactor Trip Occurred Due to Malfunctioning Gland Sealing Steam Pressure Regulator. Pressure Regulator Controls Recalib & Torque Switches Reset + (ML20213D874)
- ML20213D877 + (ML20213D877)
- 05000301/LER-1986-006, :on 861002,04 & 08,reactor Trip Signals Generated.Caused by Blown Fuse,Erroneous Voltage on Signal Cable & Voltage Fluctuation on Instrument Bus,Respectively. Procedures for Instrument Tests Revised + (ML20213D879)
- ML20213D881 + (ML20213D881)
- ML20213D882 + (ML20213D882)
- ML20213D884 + (ML20213D884)
- ML20213D886 + (ML20213D886)
- ML20213D889 + (ML20213D889)
- IR 05000458/1986036 + (ML20213D891)
- ML20213D892 + (ML20213D892)
- ML20213D893 + (ML20213D893)
- ML20213D895 + (ML20213D895)
- ML20213D897 + (ML20213D897)
- ML20213D899 + (ML20213D899)
- ML20213D900 + (ML20213D900)
- ML20213D903 + (ML20213D903)
- 05000324/LER-1986-023-01, :on 861009,primary Containment Group 4 Isolation of HPCI Sys Occurred.Caused by Loss of Electrical Continuity at Terminal Connections of Thermocouple Leads. Thermocouple Lead Terminations Improved + (ML20213D905)
- ML20213D906 + (ML20213D906)
- SNRC-1294, Discusses IE Compliance Bulletin 86-003, Potential Failure of Multiple ECCS Pumps Due to Single Failure of Air-Operated Valve in Min Flow Recirculation Line. Design Deficiency Does Not Exist at Plant + (ML20213D907)
- ML20213D909 + (ML20213D909)
- ML20213D910 + (ML20213D910)
- ML20213D911 + (ML20213D911)
- IR 05000259/1986031 + (ML20213D912)
- ML20213D913 + (ML20213D913)
- ML20213D914 + (ML20213D914)
- NLS8600261, Forwards Emergency Preparedness Exercise Info,Including Description of Sequence of Events & Controller Packages,For NRC & FEMA Review.Comments Requested by 860822 + (ML20213D916)
- ML20213D917 + (ML20213D917)
- ML20213D918 + (ML20213D918)
- ML20213D920 + (ML20213D920)
- PNO-III-86-120A, on 861030,review of Decontamination Plan & Insp of Equipment & Facilities Indicated No Spread of Am-241 in Excess of NRC Release Limits.Monitoring Decontamination Activities Will Continue Through Completion of Work + (ML20213D921)
- ML20213D923 + (ML20213D923)
- ML20213D925 + (ML20213D925)
- ML20213D927 + (ML20213D927)
- ML20213D928 + (ML20213D928)
- ML20213D929 + (ML20213D929)
- 2CAN108610, Forwards Unit 2 SAR Figure 1.2-3,omitted from Amend Package + (ML20213D931)
- ML20213D932 + (ML20213D932)
- ML20213D936 + (ML20213D936)
- ML20213D938 + (ML20213D938)
- ML20213D940 + (ML20213D940)
- 05000336/LER-1986-010-02, :on 861006,inconsistency Identified Between Safety Analysis for Control Element Assembly (CEA) & Tech Specs for Modes 3,4 & 5.Caused by Assumption That Hot Zero Power Results for CEA Withdrawn + (ML20213D941)
- ML20213D944 + (ML20213D944)
- ML20213D947 + (ML20213D947)