ML20213D918
| ML20213D918 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 11/16/1981 |
| From: | Giardina R Office of Nuclear Reactor Regulation |
| To: | Rajender Auluck Office of Nuclear Reactor Regulation |
| References | |
| CON-WNP-0428, CON-WNP-428 NUDOCS 8112020224 | |
| Download: ML20213D918 (2) | |
Text
.
s s
NOV 161981 mN Q,Q,8' d.b/ /
i.&
h(
~
~
q 1.
MEMORANDUf! FOR: Rajender Auluck, Project Manager
%@,,pgu i 3 ;g g,w Licensing Branch 2. DL
,,,y,..,
,, m 3
coa w,
e THRU:
Al Ungaro, Section Leader W
.D/
$g
-y Power Systems Branch, DSI j
N. o,4 t t v FR0:1:
Robert J. Giardina, Reactor Engineer Power Systems Branch, DSI
SUBJECT:
OPEN ISSUES WPPSS UtlIT 2 Plant Name: WPPSS Unit 2 Applicant: Washington Public Power Supply System Docket Number: 50-397 Licensing Stage: CL Responsible Branch: LD 2 and Project Manager:
R. Auluck Systems Integration Branch Involved: Power Systems FS Reviewers:
R. Giardina/S. Rhow Description of Review: Review of Questions Review Status: Awaiting Information The enclosure lists those Power Systems Branch requests for additional information that had been trensmitted to the applicant, but whose response has been deemed inadequate and/or unacceptable. We request that a meeting with the applicant Le arranged during the week of December 7,1981 to discuss thche oren issues and resclve them.
f Robert J. Giardina, Reactor Engineer Power Systems Branch, DSI
Enclosure:
As stated cc:
F.. Tedesco DISTRIBUTION:
1.. Rubenstein ' _ __ _._. ~
M Q~
~~
A.Schseng%
g
' N PSB RF r
S. Rhoc h
12jDDJK~osooo397 20224 e11116
/
M. Srir.ivasa
__/
A. Ungaro P. Giardina cn a p
.. Con tact t..
. -.PSB., g.
PSB suaec)
..R....G14rdin.a., pt29384.,,
RGie rdi,na :bl AUngaro
.1.11.n/al..
.1.11.18L,
om>
tenc roav vi : : n e.n t m OFFICIAL RECORD COPY t u au _ n...
ENCLOSURE-l WPPSS UNIT 2 LIST OF INADEQUATE AND/OR UNACCEPTABLE RESPONSES TO PSB REQUESTS FOR ADDITIONAL INFORMATION 040.12 (9.5.4) - No provisions for precluding stirring of sediment in fuel tanks 040.15 (9.5.4) - No provisions for protection of fill and vent lines from natural phenomena 040.17 (9.5.4) - No overflow from day tank to storage tank 040.18 (9.5.5) - Need more data on cooling system design 040.19 (9.5.5) - Need expansion tank locations 040.2.2 (9.5.6) - No air dryer provided 040.23 (9.5.7) - Insufficient description' of lube oil system 040.26 (9.5.8) - D/G intake and exhaust protection from natural phenomena 040.32 (10.2) - TG inservice inspection inadequate 040.45 (9.5.2) - Communication system description inadequate 040.46 (9.5.3) - Lighting system description inadequate 040.47 (9.5.4) - Confonnance with R.G.1.137 Position C.2 needed 040.50(9.5.4)- Internal tank corrosion protection needed 040.52 (9.5.4) - Same as 040.15 i
040.54 (9.5.5) - Same as 040.19 040.56(9.5.5)- Same as 040.19 040.58 (9.5.8).- Same as 040.26 040.59 (9.5.8) - Same as 040.26 040.61 (10.2) - Same as 040.32 s
j 040.80(8.3)- Installation of D/G turbocharger 040.81 (8.3) - Training program description - no response 040.82(8.3)- Clarification of D/G no load operation i
040.83 (8.3) - Instrumentation vibration - no response 040.84 (3.2) - Quality group classification D/G systems inadequate I
040.85(9.5.5)- D/G cooling water description inadequate 4
040.86 (9.5.6) - Same as 040.22 l
040.87 (9.5.7) - Lube oil system - prelubrication no response 040.88 (9.5.7) - Lube oil system - prelubrication no response 040.89(9.5.6)- Dust and dirt in D/G equipment - no response i
l
---....-,,,.n,
,a..
-.--_,,--n-
., -