Forwards List of Power Sys Branch Requests for Addl Info to Which Util Responses Deemed Inadequate &/Or Unacceptable. Meeting W/Applicant During Wk of 811207 Requested
ML20213D918
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/16/1981
From: Giardina R
Office of Nuclear Reactor Regulation
To: Rajender Auluck
Office of Nuclear Reactor Regulation
References
CON-WNP-0428, CON-WNP-428 NUDOCS 8112020224
Download: ML20213D918 (2)


Text

.

s s

NOV 161981 mN Q,Q,8' d.b/ /

i.&

h(

~

~

q 1.

MEMORANDUf! FOR: Rajender Auluck, Project Manager

%@,,pgu i 3 ;g g,w Licensing Branch 2. DL

,,,y,..,

,, m 3

coa w,

e THRU:

Al Ungaro, Section Leader W

.D/

$g

-y Power Systems Branch, DSI j

N. o,4 t t v FR0:1:

Robert J. Giardina, Reactor Engineer Power Systems Branch, DSI

SUBJECT:

OPEN ISSUES WPPSS UtlIT 2 Plant Name: WPPSS Unit 2 Applicant: Washington Public Power Supply System Docket Number: 50-397 Licensing Stage: CL Responsible Branch: LD 2 and Project Manager:

R. Auluck Systems Integration Branch Involved: Power Systems FS Reviewers:

R. Giardina/S. Rhow Description of Review: Review of Questions Review Status: Awaiting Information The enclosure lists those Power Systems Branch requests for additional information that had been trensmitted to the applicant, but whose response has been deemed inadequate and/or unacceptable. We request that a meeting with the applicant Le arranged during the week of December 7,1981 to discuss thche oren issues and resclve them.

f Robert J. Giardina, Reactor Engineer Power Systems Branch, DSI

Enclosure:

As stated cc:

F.. Tedesco DISTRIBUTION:

1.. Rubenstein ' _ __ _._. ~

M Q~

~~

A.Schseng%

g

' N PSB RF r

S. Rhoc h

12jDDJK~osooo397 20224 e11116

/

M. Srir.ivasa

__/

A. Ungaro P. Giardina cn a p

.. Con tact t..

. -.PSB., g.

PSB suaec)

..R....G14rdin.a., pt29384.,,

RGie rdi,na :bl AUngaro

.1.11.n/al..

.1.11.18L,

om>

tenc roav vi : : n e.n t m OFFICIAL RECORD COPY t u au _ n...

ENCLOSURE-l WPPSS UNIT 2 LIST OF INADEQUATE AND/OR UNACCEPTABLE RESPONSES TO PSB REQUESTS FOR ADDITIONAL INFORMATION 040.12 (9.5.4) - No provisions for precluding stirring of sediment in fuel tanks 040.15 (9.5.4) - No provisions for protection of fill and vent lines from natural phenomena 040.17 (9.5.4) - No overflow from day tank to storage tank 040.18 (9.5.5) - Need more data on cooling system design 040.19 (9.5.5) - Need expansion tank locations 040.2.2 (9.5.6) - No air dryer provided 040.23 (9.5.7) - Insufficient description' of lube oil system 040.26 (9.5.8) - D/G intake and exhaust protection from natural phenomena 040.32 (10.2) - TG inservice inspection inadequate 040.45 (9.5.2) - Communication system description inadequate 040.46 (9.5.3) - Lighting system description inadequate 040.47 (9.5.4) - Confonnance with R.G.1.137 Position C.2 needed 040.50(9.5.4)- Internal tank corrosion protection needed 040.52 (9.5.4) - Same as 040.15 i

040.54 (9.5.5) - Same as 040.19 040.56(9.5.5)- Same as 040.19 040.58 (9.5.8).- Same as 040.26 040.59 (9.5.8) - Same as 040.26 040.61 (10.2) - Same as 040.32 s

j 040.80(8.3)- Installation of D/G turbocharger 040.81 (8.3) - Training program description - no response 040.82(8.3)- Clarification of D/G no load operation i

040.83 (8.3) - Instrumentation vibration - no response 040.84 (3.2) - Quality group classification D/G systems inadequate I

040.85(9.5.5)- D/G cooling water description inadequate 4

040.86 (9.5.6) - Same as 040.22 l

040.87 (9.5.7) - Lube oil system - prelubrication no response 040.88 (9.5.7) - Lube oil system - prelubrication no response 040.89(9.5.6)- Dust and dirt in D/G equipment - no response i