Text
(.7i
'
,
-'i*
OCT 3 01986 ~
?
'
,
,
'
-In Reply Refer To:
-
.
4
.
Docket: 50-458/86-36
-
,
,
,
-
u
1
.
-
'
'
Gulf States Utilities
~
'
'
-
ATTN: . William-J. Cahill, Jr.
~
'
. ." .
,
,
Senior Vice President
i
~
~
River Bend Nuclear Group.
-
-
7
'~
.
',
P. 0. Box 220
'
<
'
-
,
St. Francisville, Louisiana 70775
Q
,
,
,
,
,
Gentlemen:
,
.
w
This refers to the inspection conducted by Mr. D. D. Chamberlain of this office
during the period October 16-23, 1986, of activities authorized by NRC
Operating License NPF-47 for River Bend Station, and to the discussion of _our
findings with you and other members of your staff at the conclusion of the
inspection.
This inspection was a special inspection conducted to review the potential
unreviewed safety question identified by your staff resulting from a temporary
modification of the control building ventilation system and to review the
planned corrective actions.
,
.Within this area, the inspection consisted of selective examination of
" procedures and representative records, interviews with personnel, and
f
.
observations by the inspector. The inspection findings are documented in the
[
enclosed inspection report.
During this inspection, it was found that certain of your activities may be ir.
violation of NRC requirements. Paragraph 2 of the enclosed inspection report
provides details of the potential' violation.. As discussed in a telephone
conversation on October 30, 1986, with your Mr. Plunkett, we have scheduled an
enforcement conference in our office on November 10, 1986, to discuss the
potential violation, the reasons for occurrence, and your corrective actions.
We shall also discuss any potential enforcement options available to the NRC,
if appropriate.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
8611120323 861030
Original S!gned By
gDR
ADOCK 050
8
J. E. Gagilardo
J. E. Gagliardo, Chief
Reactor Projects Branch
.\\
Encdjure:
(see next
Q
,
(R
dPB/A
A
E0
C:RPB M
'
i
t
erlain/ddc
J uyon
DPowers
JGaglia
/86-
p )/86
go /30/86
a /3d
f
(
'
__
_ - - - - - - - - - - _ - - _ _
m
.
-
~ . ,
.
. Gulf States Utilities Company
-2-
,
Enclosure:
Appendix - NRC Inspection Report
50-458/86-36
cc w/ enclosure:
Gulf States Utilities
ATTN:
J. E. Booker, Manager-
Engineering, Nuclear
Fuels & Licensing
P. O. Box 2951
Beaumont, Texas 77704
Louisiana State University,
Government Documents Department
Louisiana Radiation Control' Program Director
bcc to DMB (IE01)
bec distrib. by RIV:
- RPB
'
DRSP.
- Resident Inspector
R. D. Martin, RA
- Section Chief (RPB/A)
- D. Weiss, LFMB (AR-2015)
- MIS System
'*RSB
- RSTS Operator
D. A. Powers, E0
- R&SPB
- RIV File
~*w/766