Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212H240 + (ML20212H240)
- ML20212H242 + (ML20212H242)
- ML20212H245 + (ML20212H245)
- IR 05000261/1998004 + (ML20212H246)
- ML20212H249 + (ML20212H249)
- ML20212H250 + (ML20212H250)
- ML20212H252 + (ML20212H252)
- ML20212H255 + (ML20212H255)
- 05000321/LER-1984-018-01, :on 840824,contract Engineering Personnel Noted That Numerous Fire Barrier Penetration Seals Not Functional. Caused by Deficient Penetration Seals.Installation & Repair of Fire Seals Implemented + (ML20212H256)
- B17876, Informs That Util Will Adopt Last Approved Northeast Util QA Program (Nuqap) Tr,Rev 21,dtd 990630,as Unit 1 Nuqap,Per Decision to Permanently Cease Operations at Subject Plant + (ML20212H257)
- NSD-NRC-98-5635, Transmits Results of Evaluation Performed by W to Quantify & Compare Volumetric Froude Numbers for Limiting Declg LOCA & Smaller Break Locas,Per Request + (ML20212H258)
- ML20212H260 + (ML20212H260)
- ML20212H261 + (ML20212H261)
- ML20212H262 + (ML20212H262)
- ML20212H263 + (ML20212H263)
- ML20212H265 + (ML20212H265)
- ML20212H266 + (ML20212H266)
- ML20212H267 + (ML20212H267)
- ML20212H270 + (ML20212H270)
- ML20212H271 + (ML20212H271)
- ML20212H272 + (ML20212H272)
- NRC-99-0082, Application for Amend to License NPF-43,revising TS 3/4.6.1.8 to Allow Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired + (ML20212H274)
- ML20212H275 + (ML20212H275)
- U-600678, Submits Quarterly Update Re Const Schedule,Per NRC 810529 Request.Current Estimate for Fuel Load Is Late Aug 1986 + (ML20212H277)
- ML20212H279 + (ML20212H279)
- ML20212H280 + (ML20212H280)
- ML20212H281 + (ML20212H281)
- ML20212H283 + (ML20212H283)
- B12385, Forwards Comments on NRC Final Draft Review of Northeast Utils Svc Co Probabilistic Safety Study,Submitted on 860331, as Part of Plant Isap Effort + (ML20212H285)
- ML20212H286 + (ML20212H286)
- ML20212H287 + (ML20212H287)
- ML20212H290 + (ML20212H290)
- ML20212H291 + (ML20212H291)
- ML20212H293 + (ML20212H293)
- ML20212H294 + (ML20212H294)
- ML20212H295 + (ML20212H295)
- ML20212H298 + (ML20212H298)
- ML20212H299 + (ML20212H299)
- ML20212H300 + (ML20212H300)
- TXX-6223, Forwards Revs 1 to Comanche Peak Response Team Results Repts Isap I.a.1,ISAP I.b.4,ISAP Ii.C,Isap V.D & Isap VII.a.3 + (ML20212H301)
- ML20212H302 + (ML20212H302)
- NPL-98-0209, Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable + (ML20212H305)
- ML20212H307 + (ML20212H307)
- ML20212H310 + (ML20212H310)
- ML20212H311 + (ML20212H311)
- ML20212H317 + (ML20212H317)
- ML20212H319 + (ML20212H319)
- ML20212H323 + (ML20212H323)
- ML20212H324 + (ML20212H324)
- ML20212H325 + (ML20212H325)
- ML20212H328 + (ML20212H328)