Documents 870225 Meeting W/Util in Region III Ofc Re Results of Exams Administered by Licensee During Wk of 870126 to Operators in Requalification Program.Meeting Beneficial in Achieving Understanding of Exam Results.Attendees List Encl
ML20212H290
Person / Time
Site: Byron  Constellation icon.png
Issue date: 03/03/1987
From: Chrissotimos N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
References
NUDOCS 8703060066
Download: ML20212H290 (3)


Text

__

e m

NAR 0 31987 Docket No. 50-454 Docket No. 50-455 Cosmonwealth Edison Company ATTN: Mr. Cordell Reed Vice President-Post' Office Box 767 Chicago, IL 60690 Gentlemen:

This is tc document the February 25, 1987, meeting between representatives of' the Corrmonwcalth Edison Corrpany and the NRC in the Region III office. The

urpose of this meeting was to discuss the results of examinations administered ay the lict.nsee during the week of January 26, 1987, to operators in the Byron requalification program. Attachment 1 is a list of meeting attendees.

Although five of the nine operators failed the simulator examination, detailed analysis did not identify generic weaknesses indicative of programatic concerns rec,uiring significant changes to the rec,ualification program.

It is our understanding that corrective actions for the identified weaknesses in the simulator training and examination processes are being implernented.

It is also our understanding that the individuals who failed the simulator examination have been or will be retrained and re-evaluated in accordance with the existing program requirements.

We believe this meeting was beneficial in achieving a n.utual understanding cf the examination results.

If ycu have any questions, please contact Mr. C. W.

Hehl of my staff.

Sincerely, htyt?s/ aqua k; N. J. Chrissotimos Acting Director Division of Reactor Safety

Attachment:

As stated See Att,a,ched Dis _tribution

'[0.S.

pII tt RI Rl!!

(

f N4

-6 rdick/jlk F

lie Chrisjotimos I !

p%B8eaMaasha

p Comonwealth Edison Company 2

Distribu_ticn.

c cc w/ enclosure:

D. L. Farrar, Director of Nucicar Licensing V. I. Schlosser Project Manager Gunner Sorensen, Site Project Superintendent R. E. Querio, Plant Manager DCS/RSB(RIDS)

Licensing Fee Management Branch Resident Inspector, RIII Byron Resident Inspector, RIII Braidwood Phyllis Dunton, Attorney General's Office, Environinental Control Division D. W. Cassel, Jr., Esq.

Diane Chavez, DAARE/ SAFE Steve Lewis, OGC L. 01shan, NRR LPM H. S. Taylor, Quality Assurance Division n

i

i O +

  • t ATTACHMENT-CEC 0/NRC/ BYRON REQUAL FEBRUARY 25, 1987 T. Burdick-NRC Chief,-Operator Licensing Section D. Farrar CECO -

Nuclear Licensing R. C. Ward CECO Byron-Services Superintendent A. Snow Ceco Byron-Training Department R. F. Warnick NRC Chief, Reactor Projects Branch 1 K. D. Gerling Ceco PIC-PWROPS Training Supervisor R. H. Holyock CECO Production Training Manager T. K. Higgins Ceco Training Supervisor-Byron K. L. Graesser Ceco Division Vice President-NSD C. W. Hehl NRC Chief, Operations Branch T. Reidinger NRC Examiner, Region III

,