Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212D480 + (ML20212D480)
- ML20212D482 + (ML20212D482)
- ML20212D486 + (ML20212D486)
- ML20212D487 + (ML20212D487)
- ML20212D488 + (ML20212D488)
- ML20212D490 + (ML20212D490)
- ML20212D491 + (ML20212D491)
- ML20212D492 + (ML20212D492)
- ML20212D493 + (ML20212D493)
- ML20212D494 + (ML20212D494)
- ML20212D495 + (ML20212D495)
- ML20212D496 + (ML20212D496)
- BVY-99-115, Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld + (ML20212D497)
- ML20212D499 + (ML20212D499)
- ML20212D504 + (ML20212D504)
- 05000317/LER-1998-011, :on 980428,prematurely Released Fire Watch Was Noted.Caused by Inadequate Cure Time Communications.Revised Configuration Control Documents.With + (ML20212D506)
- ML20212D508 + (ML20212D508)
- ML20212D512 + (ML20212D512)
- ML20212D517 + (ML20212D517)
- ML20212D519 + (ML20212D519)
- ML20212D520 + (ML20212D520)
- ML20212D522 + (ML20212D522)
- ML20212D523 + (ML20212D523)
- GO2-87-005, Notifies That Addl Sealed Neutron Sources Will Be Transferred from Units 1 & 3/5 to Unit 2 for Storage. Applicable Portions of 10CFR70 Will Be Applied in Transfer + (ML20212D527)
- ML20212D529 + (ML20212D529)
- ML20212D530 + (ML20212D530)
- ML20212D532 + (ML20212D532)
- ML20212D533 + (ML20212D533)
- ML20212D535 + (ML20212D535)
- ML20212D536 + (ML20212D536)
- ML20212D540 + (ML20212D540)
- ML20212D543 + (ML20212D543)
- A04048, Rev 1 to Fuel Handling Accident During Reconstitution + (ML20212D544)
- ML20212D548 + (ML20212D548)
- ML20212D550 + (ML20212D550)
- ML20212D552 + (ML20212D552)
- ML20212D554 + (ML20212D554)
- ML20212D557 + (ML20212D557)
- ML20212D558 + (ML20212D558)
- ML20212D560 + (ML20212D560)
- ML20212D561 + (ML20212D561)
- B12386, Forwards Pictures of Inadequate Core Cooling (ICC) Instrumentation Sys Displays That Will Appear on Plant Computer,Spds Displays That Include ICC Info & Keyboard by Which Both SPDS & ICC Displays Accessed,Per 861215 Telcon + (ML20212D565)
- ML20212D566 + (ML20212D566)
- ML20212D569 + (ML20212D569)
- ML20212D571 + (ML20212D571)
- ML20212D575 + (ML20212D575)
- B12373, Application to Amend License DPR-61,revising Tech Spec Section 3.6, Core Cooling Sys, to Reposition & Block Flow Control Valve RH-FCV-796 in Throttled Position During Remainder of Cycle 14 Operation.Fee Paid + (ML20212D576)
- ML20212D577 + (ML20212D577)
- ML20212D583 + (ML20212D583)
- ML20212D589 + (ML20212D589)
- ML20212D591 + (ML20212D591)