ML20212D517

From kanterella
Jump to navigation Jump to search
Advises That Util Will Place Organizational Info to Support Restart in Bethesda Ofc,Per 861027 Item G.1 Request
ML20212D517
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 02/26/1987
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To: Youngblood B
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
NUDOCS 8703040136
Download: ML20212D517 (3)


Text

c.

~(-

^*

[

~

TENNESSEE VAL. LEY' A THORITY

~ - CHATTANOOGA.' TENNESSEE 37401 SN11578 Lookout Place FEB 26198T U.S. Nucleai Regulatory Commission

. Attention: Document. Control Desk Office of Nuclear' Reactor Regulation

'Hashington, D.C.

20555

' Attention: LMr. B. J. Youngblood In the Matter of

)

. Docket Nos. 50-327' Tennessee Valley Authority;

)

50-328 7SEQUOYAH NUCLEAR PLANT (SQN) ORGANIZATIONAL INFORMATION NEEDED TO SUPPORT SQN

. RESTART

~

By your letters dated December 20, 1985.(Item 3) to H. G. Parris, May 1,L1986

=(Item 1) to S. A. White, and 0ctober 27, 1986'.(Item G.1) to S.-A. White, you t

requested addltional' organizational information to support SQN restart.

Appendix 7 of Volume 1.of the. Corporate Nuclear Performance Plan (CNPP) contain's the response.to Item 1 of the May 1, 198611etter.

This letter will ensure the'information needed to complete our answers to Item G.1 of the October 27, 1986 letter and: Item 3 of the-December 20, 1985. letter is provided for.NRC's review.

To ensure we understood the full, scope of NRC's organizational-information

' request and in particular the latest October 27, 1986' Item-G.-l request, we discussed'this issue with the NRC staff in Bethesda on December 3, 1986 and January 16,'1987. As a result of those discussions,- this letter will result in the following informatwn being placed in the TVA Bethesda office for your review:

l.

Office of Nuclear Power (ONP) organization charts with names of incumbents

-down to the branch.(third-tier) level.

The organization charts include-the present (as_of February'13, 1987) technical personnel staffing levels generally summarized at the branch levels.

2.

The employee history records (EHRs) or resumes-for the branch (third-tier) level and above managers.

For Engineering Assurance, all technical personnel EHRs or resumes are being provided.

-3.

NSyB advisor biographical information.

~

' 4.

Adopyofcur' December 31, 1986 Policy and Organization Manual (P&OM).

.The P&OM provides approved ONP policies, organizational descriptions, and position descriptions (PDs) down to the branch level.

It reflects the

~

organization in place as of December 24, 1986.

The current organization charts include some revisions to the organization as.shown in the December 31, 1986 P&OM, Revision 9 of the QA Topical and Revision 3 of Volume 1 (CNPP).

8703040136 870226 0

h0 3 PDR ADOCK 05000327 i

P pm '

k 0 An Equal opportunity Employer

oj * :U.S. Nuclear Regulatory Commission FEB 261987 The information necessary for NRC to independently judge the adequacy of:

~

(1) the ONP. organization structure, (2) the qualifications of key ONP management, and (3) ONP's process for ensuring ONP maintains an effective ogranization is now being provided-to our Bethesda office..This information and Appendix 7 of Volume 1 (CNPP) gives NRC the facts necessary.to address NRC's December 20, 1935. May 1, 1986, and October 27, 1986 organizational questions.

Please telephone R. E. Alsup at 615/751-2725 as soon as possible if there are any questions regarding the above information especially as it relates to the completion of the Volume I safety evaluation report.

Very~truly yours, TENNESSEE VA EY AUTHORITY A

R.

ridley, D rector Nuclear Safet and Licensing

Subscribe ang.. sworn tg b ore me 1sgWday ofg 1987 on-Notary Public My Commission Expires 7

8 cc: See page 3 I

--., -.. ~ -

m L-;

'p '

, U.S. Nuclear. Regulatory Commission FEB 261987:

cc:

U.S. Nuclear Regulatory Commiston Region II Attention: -Dr. J. Nelson G 9 ce, Regional Administrator 101 Marietta Street, NH, Suite 2900

. Atlanta, Georgia 30323 Mr. J. J. Holonich Sequoyah Project Manager

.U.S. Nuclear.-Regulatory Commtssion

.7920 Norfolk Avenue

'Bethesda, Maryland 20814 Mr. G. G. Zech, Director TVA Projects U.S. Nuclear Regulatory Commission

-Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road.

Soddy Daisy, Tennessee 37319 l-i I

1 I

i l

l l

l L

_ _ - _