Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211E462 + (ML20211E462)
- 05000382/LER-1999-009-01, :on 990727,discovered App R Noncompliance Condition Involving Inadequate Separation of Safe Shutdown Cables.Caused Design Analysis Deficiency.Compensatory Measures Were Established + (ML20211E463)
- ML20211E465 + (ML20211E465)
- ML20211E466 + (ML20211E466)
- ML20211E467 + (ML20211E467)
- ML20211E468 + (ML20211E468)
- ML20211E469 + (ML20211E469)
- IR 05000369/1997010 + (ML20211E470)
- ML20211E471 + (ML20211E471)
- SNRC-1253, Forwards Radiological Environ Monitoring Program,1985, Per Tech Spec 6.9.1.6,requiring First Rept to Be Submitted Prior to May 1 of Yr Following Initial Criticality + (ML20211E473)
- ML20211E477 + (ML20211E477)
- ML20211E478 + (ML20211E478)
- ML20211E479 + (ML20211E479)
- ML20211E482 + (ML20211E482)
- ML20211E484 + (ML20211E484)
- ML20211E486 + (ML20211E486)
- ML20211E487 + (ML20211E487)
- ML20211E488 + (ML20211E488)
- ML20211E489 + (ML20211E489)
- 05000298/LER-1986-021, :on 860922,emergency Diesel Generator Start ESF Challanged Due to Loss of 69 Kv Power Supply to Transformer. Caused by Inadvertent Removal from Svc During Offsite Switching Activities.Power Restored + (ML20211E491)
- ML20211E492 + (ML20211E492)
- ML20211E493 + (ML20211E493)
- ML20211E494 + (ML20211E494)
- ML20211E496 + (ML20211E496)
- ML20211E497 + (ML20211E497)
- ML20211E499 + (ML20211E499)
- ML20211E500 + (ML20211E500)
- IR 05000255/1986016 + (ML20211E501)
- ML20211E502 + (ML20211E502)
- ML20211E503 + (ML20211E503)
- ML20211E508 + (ML20211E508)
- ML20211E510 + (ML20211E510)
- ML20211E511 + (ML20211E511)
- ML20211E512 + (ML20211E512)
- ML20211E513 + (ML20211E513)
- ML20211E515 + (ML20211E515)
- ML20211E516 + (ML20211E516)
- 05000382/LER-1999-010, Forwards LER 99-010-00,providing Details of Inadequate Pumping Capacity in Dry Cooling Tower Area.All Commitments Contained in Submittal Are Identified on Attached Commitment Identification Voluntary Enhancement Form + (ML20211E517)
- ML20211E518 + (ML20211E518)
- ML20211E519 + (ML20211E519)
- 05000259/LER-1986-029-01, :on 860911,B&B Promatec Co Contract Personnel Erroneously Opened Bus Potential Transformer Cabinet on 4 Kv Shutdown Board,Pulling Fuses & Deenergizing Circuit. Personnel Disciplined + (ML20211E521)
- IR 05000298/1987003 + (ML20211E524)
- ML20211E525 + (ML20211E525)
- ML20211E526 + (ML20211E526)
- RBG-23-796, Ack Receipt of NRC Transmitting SALP Board Rept for Jan 1985 - Jan 1986 + (ML20211E527)
- ML20211E528 + (ML20211E528)
- ML20211E529 + (ML20211E529)
- ML20211E530 + (ML20211E530)
- ML20211E533 + (ML20211E533)
- IR 05000443/1986026 + (ML20211E534)
- ML20211E535 + (ML20211E535)