.. o-
In Reply Refer To:
' Docket: ~50-298/87-03
FEB 131337
Nebraska Public Power District.
ATTN: George A. Trevors
Division Manager.- Nuclear Support
P. O. Box 499
Columbus, NE
68601
Gentlemen:
This refers to the inspection conducted by Messrs. D. DuBois and E. Plettner of
this office during the period January 1-31, 1987, of activities authorized by
NRC Operating License DPR-46 for Cooper Nuclear Station and to the discussion
of our findings with Mr. G. Horn and other members of your staff at the
conclusion of the inspection.
Areas examined during the inspection included IE Bulletins, reactor coolant
system hydrostatic test, plant startup from refueling and startup testing,
shutdown margin, core thermal power evaluation, core power distribution,
nuclear instrumentation calibration, plant trips-safety system challenges,
operational safety verification, post modification testing, and monthly
surveillance and maintenance observations. Within these areas, the inspection
consisted of selective examination of procedures and representative records,
interviews with personnel, and observations by the NRC inspectors. The-
inspection findings are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
these violations, in writing, in accordance with the provisions of
Section 2.201 of the NRC's'" Rules of Practice," Part 2, Title-10, Code of
Federal Regulations. Your response should be based on the specifics-contained
in the Notice of Violation enclosed with this letter,
'
i-
Unresolved items are identified in paragraph 9 of the enclosed inspection
.
report. One of these unresolved involved activities which would normally be
l
considered to be a violation of training requirements.
It has not been cited
'
as a violation because of the Commission Policy Statement on Training of
Nuclear Power Plant Personnel (50 FR 11147).
l
The responses directed by this letter and the accompanying Notice are not
l
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511,
3
RIV. I
RI : RT
.R
/A
C:RP
EAPlettner/sn
DL u ons
PJaudon
JEGag'
rdo
@(/87
i/87
9 II/87
t/qq8
22gggg{738$
e
-
-
~_
..
.
.
.
._
.
.
i
Nebraska Public Power District
-2-
Should you have any-questions concerning this inspection, we will be pleased to
discuss them with you.
~
Sincerely,
Odc!.u: s:wJ . ,
.
Iy.E. G:darci
'
J. E. Gagliardo, Chief
Reactor Projects Branch
,
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-298/87-03
cc w/ enclosures:
Guy R. Horn, Division Manager
of Nuclear Operations
Cooper Nuclear Station
P. O. Box 98
Brownville, Nebraska
68321
~
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
i
becDMB(IE01)
bcc distrib. by RIV:
- RPB
DRSP
'
- RRI
R. D. Martin, RA
- Section Chief (RPB/A)
- D. Weiss, RM/ALF
- R&SPB
- RSB
- MIS System
- Project Inspector
- RIV File
- R. Hall
- RSTS Operator
,
- w/766