Advises That 860825 Rev 10 to Physical Security Plan & Rev 2 to Security Training & Qualification Plan Consistent W/ Provisions of 10CFR50.54(p) & Acceptable,Except for Items Identified in Encl
ML20211E518
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/16/1986
From: Axelson W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Agosti F
DETROIT EDISON CO.
References
NUDOCS 8610220468
Download: ML20211E518 (3)


Text

. .

@Nd

$$$ 0$'v26I

'OCT i 61986 Docket No. 50-341 Mr. Frank E. Agosti Vice President Nuclear Operations The Detroit Edison Company 6400 North Dixie Highway Newport, Michigan 48166

Dear Mr. Agosti:

This is to acknowledge receipt of your letter dated August 25, 1986, wiiich transmitted changes, identified as Revision 10, to the " Fermi 2 Physical Security Plan," and Revision 2 to the " Fermi 2 Security Training and Qualification Plan," under the provisions of 10 CFR 50.54(p).

We have reviewed the submitted changes and have determined that, except for the items identified in the enclosure to this letter, they are consistent with the provisions of 10 CFR 50.54(p) and are therefore acceptable.

For those items identified as being unacceptable under the. provisions of 10 CFR 50.54(p) or in need of additional clarification, the previously approved plan revisions must be followed. Should you want to pursue changing the plan under the provisions of 10 CFR 50.54(p),.you must resubmit the changes modified to address our concerns. In those instances where you desire to pursue the changes without modification, they must be resubmitted under the provisions of 10 CFR 50.90.

The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required ~

under P.L.95-511.

The enclosures to your letter contain Safeguards Information of a type specified in 10 CFR 73.21 and are being withheld from public disclosure.

0I T (:r i 0 k

Encicsure Contains SAFEGUARDS INFORMATION 02gg $$hg1 Upon Seppration This F Page is Decontrolled enrr W q q n n r n- n i' j m u w wu u./ElG t Univ, n EU l

SMWH&tNf0ftMA"im Mr. Frank E. Agosti 2 OCT i 6 i986 The enclosure to this letter contain Safeguards Information and should be protected against unauthorized disclosure.

Sincerely,.

n W.h'Axeson, L. Chief Nuclear Materials Safety and Safeguards Branch

Enclosure:

Comments on Fermi 2 Physical Security Plan (UNCLASSIFIED SAFEGUARDS INFORMATION) cc w/o enclosure: See Attached List bcc w/ enclosure:

NMSS/SGRT NRR/SSPB SG Case File: 0500034106WA 0500034107WC 0500034108WG SG Inspector File: Madeda SG Reviewer File NRR Docket File Enclosure Contains SAFEGUARDS INF0il,ftATION

' Upon separation This Page is Decontrolled RIII RIII RII RIII Kers ed , ht A on 10 /t,/86 (c(fp t

6#Ehyggg;g

FERMI Docket No. 50-341 Mr. Frank E. Agosti Vice President, Nuclear Operations The Detroit Edison Company 6400 North Dixie Highway Newport, Michigan 48166 cc: Mr. Harry H. Voigt, Esq. Ronald C. Callen LeBoeuf, Lamb, Leiby & MacRae Adv. Planning Review Section 1333 New Hampshire Avenue, N. W. Michigan Public Service Commission Washington, D. C. 20036 6545 Mercantile Way P. O. Box 30221

' John Flynn, Esq. Lansing, Michigan 48909 Senior Attorney The Detroit Edison Company Regional Administrator, Region III 2000 Second Avenue U. S. Nuclear Regulatory Commission Detroit, Michigan 48226 799 Roosevelt Road Glen Ellyn, Illinois 60137 Mr. Dennis R. Hahn, Chief Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health P. O. Box 30035 Lansing, Michigan 48909 Mr. O. Keener Earle Supervisor-Licensing The Detroit Edison Company Fermi Unit 2 6400 No. Dixie Highway Newport, Michigan 48166

, Mr. Paul Byron U. S. Nuclear Regulatory Commission Resident Inspector's Office 6450 W. Dixie Highway Newport, Michigan 48166 Monroe County Office of Civil Preparedness 963 South Raisinville Monroe, Michigan 48161 I

.- _ .. _ _ - - _ _ , , . _ . - - . . - - - - . -. , . . -- . , . . - _ .