Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000287/LER-1986-003-01, :on 861028,radiation Indication Alarm Turbine Bldg Sump Monitor 3RIA-54 Discovered in Bypass Position. Caused by Defective Procedure Not Requiring Return to Normal Position After Placement in Bypass + (ML20211C377)
- AECM-86-0314, Forwards Addl Info Supporting 860902 Proposed Amends to License NPF-29 & CPPR-119,changing Licensee Responsible for Operating Unit 1 & Constructing Unit 2 to Sys Energy Resources,Inc,Per 861002 Request + (ML20211C378)
- ML20211C381 + (ML20211C381)
- ML20211C382 + (ML20211C382)
- ML20211C383 + (ML20211C383)
- ML20211C385 + (ML20211C385)
- 05000413/LER-1987-002, :on 870111,unit Shutdown Commenced When Unidentified Reactor Coolant Leakage Greater than 1 Gpm Determined.Caused by Leak in Loop C RTD Manifold Tubing. Leak Repaired & Unit Returned to Power + (ML20211C386)
- ML20211C388 + (ML20211C388)
- ML20211C389 + (ML20211C389)
- ML20211C390 + (ML20211C390)
- ML20211C392 + (ML20211C392)
- ML20211C393 + (ML20211C393)
- ML20211C394 + (ML20211C394)
- IR 05000400/1987001 + (ML20211C397)
- ML20211C398 + (ML20211C398)
- IR 05000266/1986017 + (ML20211C399)
- ML20211C400 + (ML20211C400)
- ML20211C401 + (ML20211C401)
- ML20211C402 + (ML20211C402)
- 2CAN089905, Application for Amend to License NPF-6,revising TS to Remove Requirements for Tube Repair (Sleeving) & Clarify Requirements for Preservice & ISI of Tubes to Facilitate Replacement of Original SGs + (ML20211C403)
- ML20211C404 + (ML20211C404)
- ML20211C405 + (ML20211C405)
- ML20211C407 + (ML20211C407)
- ML20211C409 + (ML20211C409)
- ML20211C410 + (ML20211C410)
- IR 05000424/1986082 + (ML20211C412)
- ML20211C415 + (ML20211C415)
- ML20211C416 + (ML20211C416)
- ML20211C417 + (ML20211C417)
- ML20211C418 + (ML20211C418)
- ML20211C419 + (ML20211C419)
- ML20211C421 + (ML20211C421)
- ML20211C424 + (ML20211C424)
- ML20211C425 + (ML20211C425)
- ML20211C426 + (ML20211C426)
- ML20211C427 + (ML20211C427)
- ML20211C429 + (ML20211C429)
- ML20211C430 + (ML20211C430)
- ML20211C433 + (ML20211C433)
- ML20211C435 + (ML20211C435)
- ML20211C438 + (ML20211C438)
- RBG-24571, NPDES Noncompliance Notification:On 861007,failure of Sludge Return Pump Threatened to Flood Pump Well.Sludge Pumped from Well to Ground.Approx 3,000 Gallons Reached Storm Drain Leading to Outfall 006 + (ML20211C441)
- ML20211C442 + (ML20211C442)
- LIC-99-0078, Forwards Rev 16C to FCS Site Security Plan,Per Provisions of 10CFR50.54(p).Rev Has Been Determined Not to Degrade Effectiveness of Current Security Plans.List of Changes, Provided.Encl Withheld + (ML20211C444)
- ML20211C445 + (ML20211C445)
- ML20211C446 + (ML20211C446)
- ML20211C449 + (ML20211C449)
- L-97-032, Notifies NRC That Re Price & Jm Crum Have Completed on-shift Invididual License re-activation Program Described in Nuclear Power Division Training Administrative Manual.Ro & SRO Licenses Were Restored to Active Status + (ML20211C450)
- 05000312/LER-1987-008, :on 870115,discovered Inadequate Sequencing of Diesel Generator High Pressure Pumps During Automatic Loading.Caused by Design Error.Design Control Procedures Implemented + (ML20211C451)
- ML20211C452 + (ML20211C452)
- ML20211C453 + (ML20211C453)