ML20211C400

From kanterella
Jump to navigation Jump to search
Notification of Revised Licensee Meeting W/Util on 970930 in Arlington,Tx Re Predecisional Enforcement Conference
ML20211C400
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 09/22/1997
From: Howell A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC
References
EA-97-414, NUDOCS 9709260177
Download: ML20211C400 (5)


Text

_ _ _ _ _ _ _ _ _ _ _.

m *t c49 uNif(D $ TOTE S f

?*;

NUCLEAR REGULATORY COMMISSION 3

}

RioloN IV i

[

611 HYAN PL AZA oRIVE, sVITE 400 ARLINoToN. T E XAE 760118064 September 22, 1997 REVISED NOTICE OF LICENSEE MEETING Name of Licensee:

Southern California Edison Co.

Name of Facility:

San Onofre Nuclear Generating Station Docket:

50 361; 50 362 EA No.:-

97 414 Date and Time September 30,1997, at 1:00 p.m. (CDT) of Meeting:

Location of Meeting:

Region IV,' Arlington, Texas 4th floor Training Conference Room Purpose of Meeting:

Predecisional Enforcement Conference I

{

i NRC Attendees:

E. Merschoff, Regional Administrator i

A. Howell, Director, Division of Reactor Safety D. Chamberlain, Depaty Director, Division of Reactor Safety

1. Barnes, Technical Assistaat, Division of Reactor Safety M. Fields, Office of Nuclear Reactor Regulation K. Brockman, Deputy Director, Division of Reactor Projects R. Hermann, Office of Nuclear Reactor Regulation D. Powers, Chief, Maintenance Branch G. Sanborn, Enforcement Officer W. Jones, Senior Reactor Analyst J. Whittemore, Maintenance Branch Licensee Attendees:

H. Ray, Executive Vice President D. Nunn, Vice President Engineering and TJchnical Services M. Short, Manager, Site Technical Services G. Gibson, Manager, Compliance K. Slagle, Manager, Nuclear Oversight i

A. Sistos, Nuclear Oversight I

NOTE:

\\

'Q (1)

This meeting is open to attendance by members of the general public, k

(2)

NRC personnel, not listed above, that desire to attend this meeting should notify Ian Barnes at (817) 860 8176 by COB on September 23,1997, 1

\\

Approved By*

Arthur T. H ell 111, Director Division of eactor Safety ONb1 llfl$flll,llll,lllI,$llll 0-PDR

.a

J Notice of Licensee Meeting 2-Southern California Edison Co.

DISTRIBUTION:

See next page cc:

Harold B. Ray, Executive Vice President Southern California Edison Co.

San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, California 92674-0128 Chairman, Board of Supervisors County of San Diego 1600 Pacific Highway, Room 335 San Diego, California 92101 Alan R. Watts, Esq.

Woodruff, Spradlin & Smart 701 S. Parker St. Suite 7000 Orange, California 92868 4720 Sherwin Harris, Resource Project Manager Public Utilities Department City of Riverside 3900 Main Street Riverside, California 92'.i22 R. W. Krieger, Vice President Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, California 92674 0128 Dr. Harvey Collins, Chief Division of Drinking Water and Environmental Management California Department of Health Services P.O. Box 942732 Sacramento, California 94234 7320 Terry Winter, Manager Power Operations San Diego Gas & Electric Company P.O. Box 1831 San Diego, California 92112

O Notice of Licensee MeetinD 3-Southern California Edison Co.

Mr. Steve Hsu Radiological Health Branch State Department of Health Services P.O. Box 042732 Sacramento, California 94234 Mayor City of San Clemente 100 Avenida Presidio San Clemente, California 92072 Mr. Truman Burns \\Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Rm 4102 San Francisco, California 94102 9

I, o

Notice of Licensee Meeting 4-Southern California Edison Co.

E Mall 'i o:

EQB (JED, DDC, IXB, DAP, KEB, MBF1, GMV) NRC Attendees PMNS Mig Announcement Coordinator JKR E. L. Jordan, DEDO s

PAB H. L. Thompson, DEDR FJM F. J. Miraglia, A/D/NRR I

ACT A. C. Thadani, ADT/NRR RPZ R. P. Zimmerman, ADP/NRR MBF1 Project Manager, NRR OEMAIL J. Lieberman, D/OE

- LJC L. J. Chandler, OGC JAS J. Sloan, Senior Resident inspector CAH C.- A. Hackney, RSLO DMK1 D. M. Kunihiro, WCFO GFS G. F. Sanborn, EO BWH D. Henderson, PAO MFH2 M. Hammond, PAO KEP Ken Perkins, Director, WCFO JAC1, CMS, CJG RA Secretaries LAT, DLF, CAM 3 DRP Division CLG, LMB,DXY DRS Division CLS1, NLH, WSW DNMS Division LSO Linda Ousley cc:

DMB (IE 45)

OEDO RIV Coordinator (17G21)

Receptionist ORA File DOCUMENT NAME: R:\\SO23\\_ SOMN 24.lXB-To receive copy of document. Indicate in box: "C," = Copy without enclosures "E" = Copy wth enclosures "N" = Nycopy TA:DRS D:DRP M

RSLO

%q PAO (bP D:DRh/)(

IBarnes:cgp/5 TPGwynn (f] CAHackney i

BHenderson ATHowM 09#f/97 09/fy97

'I 09hS7 09/Jh97 09ffp7 OFFICIAL RECORD COPY

Notice of Licenseo Meeting 4-Southern California Edison Co.

EMail Tg; EQB (JED, DDC, IXB, DAP, KEB, MBF1, GMV) NRC Attendees PMNS Mt0 Announcement Coordinator JKR E. L. Jordan, DEDO PAB H. L. Thompson, DEDR FJM F. J. Mira0 a, A/D/NRR li ACT A. C. Thadani, ADT/NRR RPZ R. P. Zimmerman, ADP/NRR MBF1 Project Manager, NRR OEMAll J. Lieberman, D/OE LJC L. J. Chandler, OGC JAS J. Sloan, Senior Resident inspector CAH C. A. Hackney, RSLO DMK1 D. M. Kunihiro, WCFO GFS G. F. Sanborn, EO BWH B. Henderson, PAO MFH2 M. Hammond, PAO KEP Ken Perkins, Director, WCFO JAC1, CMS, CJG RA Secrotaries LAT, DLF, CAM 3 DRP Division CLG, LMB,DXY DRS Division CLS1, NLH, WSW DNMS Division LSO Linda Ousley cc:

DMB (IE 45)

OEDO RIV Coordinator (17G21)

Receptionist ORA File DOCUMENT NAME: R:\\ SOT.3\\_ SOMN 24.lXB To receive copy or document, indicate in box: c = copy without enciosuras lig copy witn crienosures *N = N7 copy TA:DRS L,

D:DRP

/J RSLO lbj PA0

/bF D:DRh/)(

IBarnes:cgg-g T PGwynn (~f'f CAHackney BHenderson ATHowM 09kfl97 09/h97 "V

09A;i97 09/JI(9"['

09/')3JJ7 OFFICIAL RECORD COPY

~~

[

d