ML20211C446

From kanterella
Jump to navigation Jump to search
Partial Response to FOIA Request for Documents Re Use of Western Stiff Pipe Clamps at Perry Nuclear Power Plant.App a Documents Identified by Accession Number & Available in Pdr.App B Documents Forwarded & Being Made Available in PDR
ML20211C446
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 10/09/1986
From: Grimsley D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Schlemmer D
GOVERNMENT ACCOUNTABILITY PROJECT
Shared Package
ML20209C752 List:
References
FOIA-86-689 NUDOCS 8610210373
Download: ML20211C446 (3)


Text

-- - - _ - _ - _ - - _ _ _ _ - _ _ _ - _ _ _ _ - _ - - - . _ _ _ - _ _ _ _ . _ _ _ _ _ - _ - _ _ _ _ _ - - _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ - -

TbR-Olb-O p agig UNITED STATES Do NUCLEAR REGULATORY COMMISSION E 'g W ASHINGTON. D. C. 20555 i 'I OCT 9 1986 I-Mr. Donald L. Schlemmer Government Accountability Project 1515 Connecticut Ave., N.W., Suite 202 Uashington, DC 20036 IN RESPONSE REFER TO FOIA-86-689

Dear:

Mr. Schlemmer:

This is in regard to your request, pursuant to the Freedom of Information Act, to which the NRC assigned the above number.

_X__ This is a partial response to your request. We will notify you upon cumpletion of search for and review of any additional records subject to your request.

The staff has completed the search for and review of .

records subject to your request, and this is.the final response to your request.

The NRC has no records subject to your request.

a.

_Z__

Records subject to your request are available for public _

inspection and copying ~at the NRC Public Document Room (PDR), 1717 H Street, NW, Washington, DC 20555, as noted on the enclosure (s). The PDR accession number is identified beside each record description.

_X.__

Records subject to your request are being made available for public inspection and copying atthe NRC Public Document Room (PDR),

20555, 1717 H Street, NW, Washington, DC your name.in the PDR file folder under the above number and These records are listed on the enclosure (s).

We are enclosing a notice that provides information about charges and procedures for obtaining records from the PDR.

Sincerely,

, M

  • Donnie H. Grimsley, Director Division of Rules and Records Office of Administration Enclosure (s): As stated 8610210373 e61009 ,

SEhLE 86-689 PDR i

F01A/86-689 (First Partial)

APPENDIX A Records Already in PDR 1

l'

1. 04/15/83 Letter to H. Lorenz from Uldis Potapovs Re: Facility at Reading, Pennsylvania w/ enclosures Appendix A - Inspection Report No. 99900525/83-01 and Appendix B - Inspection Data Sheets Acc. No. 8305050219 (17 pages)
2. .08/23/83 Letter to B. Youngblood from Murray Edelman Re: Perry Nuclear Plant w/ attachment lateral Stability of LPCI Piping System Supports Subjected to Pool Swell Loads Acc. No. 8308300532 (105 pages)
3. 03/19/84 Letter to Murray Edelman from B. Youngblood Re: Request for Additional Information Pertaining to the Use of " Stiff" Piping Clamps at the Perry Nuclear Power Plant w/ enclosure Addressee List Acc. No. 8404060088 (3 pages)
4. 04/30/84 Letter to Edward Jordan from Dan Teissler Re: Western Stiff Pipe Clamps Acc. No. 8409260586 (2 pages)
5. 08/15/84 Letter to Edward Jordan from Dan Teissler Re: Weste.rn Stiff Pipe Clamps Acc. No. 8409260578(1page)
6. 10/01/84 Letter to B. Youngblood from Murray Edelman Re
Request for Additional Information Pertaining to the Use of " Stiff" Piping Clamps w/ attachments Pipe Clam Acc. No. 8410090219 841001 (17 pages)p Applications
7. 02/19/85 Letter to Murray Edelman from B. Youngblood Re: Request for Additional Information Re Use of Staff Pipe Clamps in the 3 Perry Nuclear Power Plant Acc. No. 8502260573 w/ enclosure List of Addressees (2 pages)
8. 03/18/85 Letter to B. Youngblood _from Murray Edelman Re: Additional Information on Stiff Pipe Clamps w/ attachment Clamp Installation Acc. No. 8503210003 (2 pages)
9. 06/14/85 Letter to B. Youngblood from Murray Edelman Re: Request for Additional Technical Information on use of Stiff Pipe Clamps w/ attachments Stiff Pipe Clamps Acc. No. 8506210245 850614 (6 pages) -

F0IA-86-689 (First Partial) f APPENDIX B Records Being Placed in PDR i 1. 03/02/84 Memo to B. Youngblood from R. Bosnak, Re: Request for Additional Information - Perry Nuclear Power Plant w/ attachment l re Stiff Pipe Clamps - (3 pages).

2. 04/18/85 Memo to B. Youngblood from F. Cherny, Re: Request for Additional Information - Perry Nuclear Power Plant w/ attachment Stif f Pipe Clamps - (2. pages).
3. 09/03/86 Letter to K. Friedmar from R. Heishman, Re: Facility in San Francisco w/ enclosures - Appendix A - Inspection Report and 1

Appendix B - Inspection Data Sheets - (8 pages) t i

i i

I