MONTHYEAR1CAN099904, Application for Amend to License DPR-51,changing TS 4.18.5.a.9 & Associated Bases for One Cycle of Operation Through End of Cycle 16,for Suppl Use of OTSG Repair Roll Technology1999-09-19019 September 1999 Application for Amend to License DPR-51,changing TS 4.18.5.a.9 & Associated Bases for One Cycle of Operation Through End of Cycle 16,for Suppl Use of OTSG Repair Roll Technology 0CAN099903, Application for Amends to Licenses DPR-51 & NPF-6,changing Heavy Load Handling Requirements & Transportation Provisions to Permit Movement of Original & Replacement SGs Through Containment Opening During SG Replacement Outage1999-09-17017 September 1999 Application for Amends to Licenses DPR-51 & NPF-6,changing Heavy Load Handling Requirements & Transportation Provisions to Permit Movement of Original & Replacement SGs Through Containment Opening During SG Replacement Outage 0CAN099901, Application for Amends to Licenses DPR-51 & NF-6,changing TS by Revising Curie Limits for Radioactive Gas Storage Tanks1999-09-17017 September 1999 Application for Amends to Licenses DPR-51 & NF-6,changing TS by Revising Curie Limits for Radioactive Gas Storage Tanks 1CAN089903, Application for Amend to License DPR-51,revising ESAS Low RCS Pressure Setpoint,To Ensure That TS Adequately Bounds Safety Analysis1999-08-18018 August 1999 Application for Amend to License DPR-51,revising ESAS Low RCS Pressure Setpoint,To Ensure That TS Adequately Bounds Safety Analysis 2CAN089905, Application for Amend to License NPF-6,revising TS to Remove Requirements for Tube Repair (Sleeving) & Clarify Requirements for Preservice & ISI of Tubes to Facilitate Replacement of Original SGs1999-08-18018 August 1999 Application for Amend to License NPF-6,revising TS to Remove Requirements for Tube Repair (Sleeving) & Clarify Requirements for Preservice & ISI of Tubes to Facilitate Replacement of Original SGs 2CAN079903, Application for Amend to License NPF-6,revising SRs Pertaining to ISI Requirements for SG Tube Circumferential Cracking at top-of-tubesheet During 2P99 Planned mid-cycle Outage1999-07-29029 July 1999 Application for Amend to License NPF-6,revising SRs Pertaining to ISI Requirements for SG Tube Circumferential Cracking at top-of-tubesheet During 2P99 Planned mid-cycle Outage 1CAN079904, Suppl to Util 990409 Proposed TS Changes to Revise Requirements Associated with Station Batteries & Dc Sources to 125 Volt Dc Switchyard Distribution Sys1999-07-29029 July 1999 Suppl to Util 990409 Proposed TS Changes to Revise Requirements Associated with Station Batteries & Dc Sources to 125 Volt Dc Switchyard Distribution Sys 0CAN079901, Application for Amends to Licenses DPR-51 & NPF-6 to Change TS & Subsequent Relief Request from Post Accident Sampling Requirements of NUREG-0737.TS Administrative Control requirements,NUREG-0737 & RG 1.97,rev 3,affected1999-07-14014 July 1999 Application for Amends to Licenses DPR-51 & NPF-6 to Change TS & Subsequent Relief Request from Post Accident Sampling Requirements of NUREG-0737.TS Administrative Control requirements,NUREG-0737 & RG 1.97,rev 3,affected 1CAN069902, Application for Amend to License DPR-51,revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks1999-06-0101 June 1999 Application for Amend to License DPR-51,revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks 1CAN059901, Application for Amend to License DPR-51,revising TS SRs & Applicable Bases Relevant to ISI Requirements for Portions of once-through SG Tubes Encompassed by Upper Tube Sheet. Proprietary Rept Encl.Rept Withheld,Per 10CFR2.790(b)(4)1999-05-14014 May 1999 Application for Amend to License DPR-51,revising TS SRs & Applicable Bases Relevant to ISI Requirements for Portions of once-through SG Tubes Encompassed by Upper Tube Sheet. Proprietary Rept Encl.Rept Withheld,Per 10CFR2.790(b)(4) 2CAN049902, Application for Amend to License NPF-6,adding TS 3.0.6 & Associated Bases to ANO-2 Ts.Proposed Specification Is Identical to Specification 3.0.5 of NUREG-1432, Improved STS CE Plants, Rev 11999-04-0909 April 1999 Application for Amend to License NPF-6,adding TS 3.0.6 & Associated Bases to ANO-2 Ts.Proposed Specification Is Identical to Specification 3.0.5 of NUREG-1432, Improved STS CE Plants, Rev 1 1CAN049901, Application for Amend to License DPR-51,revising Requirements Associated with ANO 1 Provisions for RB Testing & Insp1999-04-0909 April 1999 Application for Amend to License DPR-51,revising Requirements Associated with ANO 1 Provisions for RB Testing & Insp 1CAN049902, Application for Amend to License DPR-51,revising Requirements Associated with ANO-1 Station Batteries & DC Sources to 125 Vdc Switchyard Distribution Sys1999-04-0909 April 1999 Application for Amend to License DPR-51,revising Requirements Associated with ANO-1 Station Batteries & DC Sources to 125 Vdc Switchyard Distribution Sys 2CAN029913, Application for Amend to License NPF-6,adding Footnote to Action 2 Allowing Startup with Functional Units Associated with Channel D Excore Inoperable.Action 2 Is Associated with TS Table 3.3-1, Reactor Protective Instrumentation1999-02-25025 February 1999 Application for Amend to License NPF-6,adding Footnote to Action 2 Allowing Startup with Functional Units Associated with Channel D Excore Inoperable.Action 2 Is Associated with TS Table 3.3-1, Reactor Protective Instrumentation 0CAN119801, Application for Amends to Licenses DPR-51 & NPF-6, Implementing Consolidated EOI QA Plan Manual Submitted on 980430 & Approved by NRC in 981106 Se.Changes Also Clarify Responsibilities on STA Position on Shift1998-11-24024 November 1998 Application for Amends to Licenses DPR-51 & NPF-6, Implementing Consolidated EOI QA Plan Manual Submitted on 980430 & Approved by NRC in 981106 Se.Changes Also Clarify Responsibilities on STA Position on Shift 2CAN099805, Application for Amend to License NPF-6,modifying Notes in Table Associated with Tech Specs 2.2.1,3.3.1.1 & 3.3.2.1 Re Operating Bypass Setpoint1998-09-17017 September 1998 Application for Amend to License NPF-6,modifying Notes in Table Associated with Tech Specs 2.2.1,3.3.1.1 & 3.3.2.1 Re Operating Bypass Setpoint 1CAN089801, Application for Amend to License DPR-51,revising TS 3.3.4.B Requirements for Sodium Hydroxide Tank Concentration1998-08-0606 August 1998 Application for Amend to License DPR-51,revising TS 3.3.4.B Requirements for Sodium Hydroxide Tank Concentration 2CAN089802, Application for Amend to License NPF-6,revising TS 3.1.3.2 Action Requirements for CEA Position Indicator Channels1998-08-0606 August 1998 Application for Amend to License NPF-6,revising TS 3.1.3.2 Action Requirements for CEA Position Indicator Channels 2CAN069801, Application for Amend to License NPF-6,revising Portion of Plant Protection Sys Design to Ensure That ESFAS Meets Its Applicable Design Requirements.Rev 1 to Engineering Rept 97-R-2015-01 Encl1998-06-30030 June 1998 Application for Amend to License NPF-6,revising Portion of Plant Protection Sys Design to Ensure That ESFAS Meets Its Applicable Design Requirements.Rev 1 to Engineering Rept 97-R-2015-01 Encl 2CAN069805, Application for Amend to License NPF-6,providing Range of Acceptable Values for 4160 Volt Bus Loss of Voltage Values, to Be Consistent W/Requirements Set Forth in NUREG-1432,rev 11998-06-29029 June 1998 Application for Amend to License NPF-6,providing Range of Acceptable Values for 4160 Volt Bus Loss of Voltage Values, to Be Consistent W/Requirements Set Forth in NUREG-1432,rev 1 2CAN069807, Application for Amend to License NPF-6,revising Surveillance Testing Requirements for Unit 2 Direct Current Electrical Distribution Sys & to Reflect Installation of New Inverters During Next Scheduled Refueling Outage1998-06-29029 June 1998 Application for Amend to License NPF-6,revising Surveillance Testing Requirements for Unit 2 Direct Current Electrical Distribution Sys & to Reflect Installation of New Inverters During Next Scheduled Refueling Outage 2CAN069806, Application for Amend to License NPF-6,modifying Requirements for Pressurizer Code Safety Valve Requirements Specified by TS 3.4.2 & Safety Tank Isolation Requirements Specified in TS 3.4.121998-06-29029 June 1998 Application for Amend to License NPF-6,modifying Requirements for Pressurizer Code Safety Valve Requirements Specified by TS 3.4.2 & Safety Tank Isolation Requirements Specified in TS 3.4.12 2CAN069804, Application for Amend to License NPF-6,increasing Allowable as-found Lift Setting Tolerances on MSSVs & Pressurizer Safety Valves1998-06-29029 June 1998 Application for Amend to License NPF-6,increasing Allowable as-found Lift Setting Tolerances on MSSVs & Pressurizer Safety Valves 2CAN049802, Application for Amend to License NPF-6,revising Value of Single Largest post-accident Load Capable of Being Supplied by DGs & Relocates Value to Associated Bases1998-04-30030 April 1998 Application for Amend to License NPF-6,revising Value of Single Largest post-accident Load Capable of Being Supplied by DGs & Relocates Value to Associated Bases 1CAN049802, Application for Amend to License DPR-51,revising TS 1.6.1 Re Qpt Definition.Amend Allows Use of Either Incore Detectors or Excore Detectors for Determining Qpt1998-04-30030 April 1998 Application for Amend to License DPR-51,revising TS 1.6.1 Re Qpt Definition.Amend Allows Use of Either Incore Detectors or Excore Detectors for Determining Qpt 1CAN049806, Application for Amend to License DPR-51,changing Order of Channel Rotation During Outage for Scheduling Flexibility, While Still Requiring Rotation Schedule to Be Established for Operating Cycle1998-04-28028 April 1998 Application for Amend to License DPR-51,changing Order of Channel Rotation During Outage for Scheduling Flexibility, While Still Requiring Rotation Schedule to Be Established for Operating Cycle 1CAN049803, Application for Amend to License DPR-51,allowing Upper Tubesheet Volumetric Indications to Remain in Svc for Cycle 15,as Discussed W/Nrc on 980318 & 261998-04-0101 April 1998 Application for Amend to License DPR-51,allowing Upper Tubesheet Volumetric Indications to Remain in Svc for Cycle 15,as Discussed W/Nrc on 980318 & 26 1CAN029803, Application for Amend to License DPR-51,revising TS to Allow Use of Repair Roll Technology (Reroll) for Upper Tubesheet of Sgs.Revised TS Pages,Proprietary Rev 0 to Topical Rept BAW-10232P Included.Proprietary Encl Withheld1998-02-0909 February 1998 Application for Amend to License DPR-51,revising TS to Allow Use of Repair Roll Technology (Reroll) for Upper Tubesheet of Sgs.Revised TS Pages,Proprietary Rev 0 to Topical Rept BAW-10232P Included.Proprietary Encl Withheld 1CAN129702, Application for Amend to License DPR-51,establishing Alternate Repair Criteria for Upper Tubesheet Region of ANO-1 Sgs.Proprietary Topical Rept BAW-10226P Encl.Rept Withheld (Ref 10CFR2.790(b)(4))1997-12-12012 December 1997 Application for Amend to License DPR-51,establishing Alternate Repair Criteria for Upper Tubesheet Region of ANO-1 Sgs.Proprietary Topical Rept BAW-10226P Encl.Rept Withheld (Ref 10CFR2.790(b)(4)) 2CAN099701, Application for Amend to License NPF-6,reducing Min Required Reactor Coolant Sys Flow Rate Requirements Listed in 3.2.5 Until ANO-2 SGs Are Replaced1997-09-23023 September 1997 Application for Amend to License NPF-6,reducing Min Required Reactor Coolant Sys Flow Rate Requirements Listed in 3.2.5 Until ANO-2 SGs Are Replaced 2CAN099703, Application for Amend to License NPF-6,modifying RPS & ESFAS Trip Setpoint & Allowable Values for SG Low Pressure1997-09-23023 September 1997 Application for Amend to License NPF-6,modifying RPS & ESFAS Trip Setpoint & Allowable Values for SG Low Pressure 2CAN079702, Application for Amend to License NPF-6,modifying Actions Associated W/Ts Table 3.3-1 for Reactor Protective Instrumentation & Table 3.3-3 for Esfa Sys Instrumentation1997-07-28028 July 1997 Application for Amend to License NPF-6,modifying Actions Associated W/Ts Table 3.3-1 for Reactor Protective Instrumentation & Table 3.3-3 for Esfa Sys Instrumentation 2CAN079703, Application for Amend to License NPF-6,revising Surveillance Testing Requirements for Facility EFW Sys as Specified in TS 4.7.1.2.Requests That Effective Date for Change Be within 30 Days of Issuance1997-07-21021 July 1997 Application for Amend to License NPF-6,revising Surveillance Testing Requirements for Facility EFW Sys as Specified in TS 4.7.1.2.Requests That Effective Date for Change Be within 30 Days of Issuance 1CAN059702, Application for Amend to License DPR-51,allowing Sufficient Time for Submittal & NRC Review & Approval of Exigent TS Change Request for one-time Exception to Requirements of Section 4.18.5.b Re SG Tube Insp Surveillance Requirements1997-05-0202 May 1997 Application for Amend to License DPR-51,allowing Sufficient Time for Submittal & NRC Review & Approval of Exigent TS Change Request for one-time Exception to Requirements of Section 4.18.5.b Re SG Tube Insp Surveillance Requirements 2CAN049703, Application for Amend to License NPF-6,revising Requirements for Sample Scope Initial Size & Expansion for Inservice Insp Steam Generator Tube Sleeves1997-04-24024 April 1997 Application for Amend to License NPF-6,revising Requirements for Sample Scope Initial Size & Expansion for Inservice Insp Steam Generator Tube Sleeves 2CAN049702, Application for Amend to License NPF-6,permitting Delay of Scheduled three-yr Inspections of Flywheels on All Four RCPs Until Completion of 2R13 Refueling Outage,Scheduled for Winter of 1998-991997-04-18018 April 1997 Application for Amend to License NPF-6,permitting Delay of Scheduled three-yr Inspections of Flywheels on All Four RCPs Until Completion of 2R13 Refueling Outage,Scheduled for Winter of 1998-99 1CAN049703, Application for Amend to License DPR-51,requesting Exigent TS Change Re Steam Generator Tube Insp Surveillance Requirements1997-04-11011 April 1997 Application for Amend to License DPR-51,requesting Exigent TS Change Re Steam Generator Tube Insp Surveillance Requirements ML20133A6801996-12-23023 December 1996 Application for Amend to License NPF-6,revising TS 3/4.7.8 Which Will Enable on-line Testing of Selected Snubbers by Clarifying Intent of TS 2CAN129603, Application for Amend to License NPF-6,requesting Change to Power Calibr Requirements1996-12-19019 December 1996 Application for Amend to License NPF-6,requesting Change to Power Calibr Requirements 2CAN129604, Application for Amend to License NPF-6,requesting Deletion of Specific Value for Total Reactor Coolant Sys Volume in TS 5.4.21996-12-19019 December 1996 Application for Amend to License NPF-6,requesting Deletion of Specific Value for Total Reactor Coolant Sys Volume in TS 5.4.2 2CAN129611, Application for Amend to License NPF-6,requesting to Provide Addl NRC-approved Methodology in List of References in TS 6.9.51996-12-19019 December 1996 Application for Amend to License NPF-6,requesting to Provide Addl NRC-approved Methodology in List of References in TS 6.9.5 2CAN119609, Application for Amend to License NPF-6,revising Surveillance Requirements for Unit 2 Re SG Tubing,Ts 4.4.5.CEN-630-NP & CEN-630-P Repts encl.CEN-630-P Rept Withheld,Per 10CFR2.790(b)(4)1996-11-26026 November 1996 Application for Amend to License NPF-6,revising Surveillance Requirements for Unit 2 Re SG Tubing,Ts 4.4.5.CEN-630-NP & CEN-630-P Repts encl.CEN-630-P Rept Withheld,Per 10CFR2.790(b)(4) 2CAN119610, Application for Amend to License NPF-6,adding Suppl 1-P & Approval Ltr to Section 6.9.5.1 in Support of Increased SG Tube Plugging Limit Beyond 10% Ref to Small Break LOCA Methodology CENPD-1371996-11-24024 November 1996 Application for Amend to License NPF-6,adding Suppl 1-P & Approval Ltr to Section 6.9.5.1 in Support of Increased SG Tube Plugging Limit Beyond 10% Ref to Small Break LOCA Methodology CENPD-137 2CAN109603, Application for Amend to License NPF-6,changing Channel Functional Testing Frequency for Most of Reactor Protection Sys (RPS) & ESFAS Instrumentation from Monthly to Every Four Months1996-10-0707 October 1996 Application for Amend to License NPF-6,changing Channel Functional Testing Frequency for Most of Reactor Protection Sys (RPS) & ESFAS Instrumentation from Monthly to Every Four Months 0CAN109603, Application for Amend to Licenses DPR-51 & NPF-6 Re Relocation of RETS Per GL 89-011996-10-0202 October 1996 Application for Amend to Licenses DPR-51 & NPF-6 Re Relocation of RETS Per GL 89-01 0CAN109602, Application for Amends to Licenses DPR-51 & NPF-6,reducing Costs for Licensees by Allowing Change to Requirements W/O Necessarily Requiring License Amend,Per GL 95-101996-10-0202 October 1996 Application for Amends to Licenses DPR-51 & NPF-6,reducing Costs for Licensees by Allowing Change to Requirements W/O Necessarily Requiring License Amend,Per GL 95-10 2CAN089601, Application for Amend to License NPF-6,relocating RCS Flow Rate Limit from TS & to Colr,Iaw/Gl 88-16, Removal of Cycle-Specific Parameter Limits from Ts1996-08-23023 August 1996 Application for Amend to License NPF-6,relocating RCS Flow Rate Limit from TS & to Colr,Iaw/Gl 88-16, Removal of Cycle-Specific Parameter Limits from Ts 0CAN089606, Application for Amends to Licenses DPR-51 & NPF-6,allowing Implementation of Approved Option B to 10CFR50,App J1996-08-23023 August 1996 Application for Amends to Licenses DPR-51 & NPF-6,allowing Implementation of Approved Option B to 10CFR50,App J 2CAN089609, Application for Amend to License NPF-6,revising Section 5.0, Design Features & Would for Most Part,Adopt NUREG-1432 Rev 1,improved, Std Tech Specs for C-E Plants, for Section of TS1996-08-23023 August 1996 Application for Amend to License NPF-6,revising Section 5.0, Design Features & Would for Most Part,Adopt NUREG-1432 Rev 1,improved, Std Tech Specs for C-E Plants, for Section of TS 0CAN069601, Application for Amends to Licenses DPR-51 & NPF-6,allowing Reactor Containment Bldg Equipment Hatch Doors to Remain Open During Fuel Handling & Core Alterations1996-06-28028 June 1996 Application for Amends to Licenses DPR-51 & NPF-6,allowing Reactor Containment Bldg Equipment Hatch Doors to Remain Open During Fuel Handling & Core Alterations 1999-09-19
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEAR1CAN099904, Application for Amend to License DPR-51,changing TS 4.18.5.a.9 & Associated Bases for One Cycle of Operation Through End of Cycle 16,for Suppl Use of OTSG Repair Roll Technology1999-09-19019 September 1999 Application for Amend to License DPR-51,changing TS 4.18.5.a.9 & Associated Bases for One Cycle of Operation Through End of Cycle 16,for Suppl Use of OTSG Repair Roll Technology 0CAN099901, Application for Amends to Licenses DPR-51 & NF-6,changing TS by Revising Curie Limits for Radioactive Gas Storage Tanks1999-09-17017 September 1999 Application for Amends to Licenses DPR-51 & NF-6,changing TS by Revising Curie Limits for Radioactive Gas Storage Tanks 0CAN099903, Application for Amends to Licenses DPR-51 & NPF-6,changing Heavy Load Handling Requirements & Transportation Provisions to Permit Movement of Original & Replacement SGs Through Containment Opening During SG Replacement Outage1999-09-17017 September 1999 Application for Amends to Licenses DPR-51 & NPF-6,changing Heavy Load Handling Requirements & Transportation Provisions to Permit Movement of Original & Replacement SGs Through Containment Opening During SG Replacement Outage 2CAN089905, Application for Amend to License NPF-6,revising TS to Remove Requirements for Tube Repair (Sleeving) & Clarify Requirements for Preservice & ISI of Tubes to Facilitate Replacement of Original SGs1999-08-18018 August 1999 Application for Amend to License NPF-6,revising TS to Remove Requirements for Tube Repair (Sleeving) & Clarify Requirements for Preservice & ISI of Tubes to Facilitate Replacement of Original SGs 1CAN089903, Application for Amend to License DPR-51,revising ESAS Low RCS Pressure Setpoint,To Ensure That TS Adequately Bounds Safety Analysis1999-08-18018 August 1999 Application for Amend to License DPR-51,revising ESAS Low RCS Pressure Setpoint,To Ensure That TS Adequately Bounds Safety Analysis 1CAN079904, Suppl to Util 990409 Proposed TS Changes to Revise Requirements Associated with Station Batteries & Dc Sources to 125 Volt Dc Switchyard Distribution Sys1999-07-29029 July 1999 Suppl to Util 990409 Proposed TS Changes to Revise Requirements Associated with Station Batteries & Dc Sources to 125 Volt Dc Switchyard Distribution Sys 2CAN079903, Application for Amend to License NPF-6,revising SRs Pertaining to ISI Requirements for SG Tube Circumferential Cracking at top-of-tubesheet During 2P99 Planned mid-cycle Outage1999-07-29029 July 1999 Application for Amend to License NPF-6,revising SRs Pertaining to ISI Requirements for SG Tube Circumferential Cracking at top-of-tubesheet During 2P99 Planned mid-cycle Outage 0CAN079901, Application for Amends to Licenses DPR-51 & NPF-6 to Change TS & Subsequent Relief Request from Post Accident Sampling Requirements of NUREG-0737.TS Administrative Control requirements,NUREG-0737 & RG 1.97,rev 3,affected1999-07-14014 July 1999 Application for Amends to Licenses DPR-51 & NPF-6 to Change TS & Subsequent Relief Request from Post Accident Sampling Requirements of NUREG-0737.TS Administrative Control requirements,NUREG-0737 & RG 1.97,rev 3,affected 1CAN069902, Application for Amend to License DPR-51,revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks1999-06-0101 June 1999 Application for Amend to License DPR-51,revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks 1CAN059901, Application for Amend to License DPR-51,revising TS SRs & Applicable Bases Relevant to ISI Requirements for Portions of once-through SG Tubes Encompassed by Upper Tube Sheet. Proprietary Rept Encl.Rept Withheld,Per 10CFR2.790(b)(4)1999-05-14014 May 1999 Application for Amend to License DPR-51,revising TS SRs & Applicable Bases Relevant to ISI Requirements for Portions of once-through SG Tubes Encompassed by Upper Tube Sheet. Proprietary Rept Encl.Rept Withheld,Per 10CFR2.790(b)(4) 2CAN049902, Application for Amend to License NPF-6,adding TS 3.0.6 & Associated Bases to ANO-2 Ts.Proposed Specification Is Identical to Specification 3.0.5 of NUREG-1432, Improved STS CE Plants, Rev 11999-04-0909 April 1999 Application for Amend to License NPF-6,adding TS 3.0.6 & Associated Bases to ANO-2 Ts.Proposed Specification Is Identical to Specification 3.0.5 of NUREG-1432, Improved STS CE Plants, Rev 1 1CAN049901, Application for Amend to License DPR-51,revising Requirements Associated with ANO 1 Provisions for RB Testing & Insp1999-04-0909 April 1999 Application for Amend to License DPR-51,revising Requirements Associated with ANO 1 Provisions for RB Testing & Insp 1CAN049902, Application for Amend to License DPR-51,revising Requirements Associated with ANO-1 Station Batteries & DC Sources to 125 Vdc Switchyard Distribution Sys1999-04-0909 April 1999 Application for Amend to License DPR-51,revising Requirements Associated with ANO-1 Station Batteries & DC Sources to 125 Vdc Switchyard Distribution Sys 2CAN029913, Application for Amend to License NPF-6,adding Footnote to Action 2 Allowing Startup with Functional Units Associated with Channel D Excore Inoperable.Action 2 Is Associated with TS Table 3.3-1, Reactor Protective Instrumentation1999-02-25025 February 1999 Application for Amend to License NPF-6,adding Footnote to Action 2 Allowing Startup with Functional Units Associated with Channel D Excore Inoperable.Action 2 Is Associated with TS Table 3.3-1, Reactor Protective Instrumentation 0CAN119801, Application for Amends to Licenses DPR-51 & NPF-6, Implementing Consolidated EOI QA Plan Manual Submitted on 980430 & Approved by NRC in 981106 Se.Changes Also Clarify Responsibilities on STA Position on Shift1998-11-24024 November 1998 Application for Amends to Licenses DPR-51 & NPF-6, Implementing Consolidated EOI QA Plan Manual Submitted on 980430 & Approved by NRC in 981106 Se.Changes Also Clarify Responsibilities on STA Position on Shift 2CAN099805, Application for Amend to License NPF-6,modifying Notes in Table Associated with Tech Specs 2.2.1,3.3.1.1 & 3.3.2.1 Re Operating Bypass Setpoint1998-09-17017 September 1998 Application for Amend to License NPF-6,modifying Notes in Table Associated with Tech Specs 2.2.1,3.3.1.1 & 3.3.2.1 Re Operating Bypass Setpoint 2CAN089802, Application for Amend to License NPF-6,revising TS 3.1.3.2 Action Requirements for CEA Position Indicator Channels1998-08-0606 August 1998 Application for Amend to License NPF-6,revising TS 3.1.3.2 Action Requirements for CEA Position Indicator Channels 1CAN089801, Application for Amend to License DPR-51,revising TS 3.3.4.B Requirements for Sodium Hydroxide Tank Concentration1998-08-0606 August 1998 Application for Amend to License DPR-51,revising TS 3.3.4.B Requirements for Sodium Hydroxide Tank Concentration 2CAN069801, Application for Amend to License NPF-6,revising Portion of Plant Protection Sys Design to Ensure That ESFAS Meets Its Applicable Design Requirements.Rev 1 to Engineering Rept 97-R-2015-01 Encl1998-06-30030 June 1998 Application for Amend to License NPF-6,revising Portion of Plant Protection Sys Design to Ensure That ESFAS Meets Its Applicable Design Requirements.Rev 1 to Engineering Rept 97-R-2015-01 Encl 2CAN069804, Application for Amend to License NPF-6,increasing Allowable as-found Lift Setting Tolerances on MSSVs & Pressurizer Safety Valves1998-06-29029 June 1998 Application for Amend to License NPF-6,increasing Allowable as-found Lift Setting Tolerances on MSSVs & Pressurizer Safety Valves 2CAN069806, Application for Amend to License NPF-6,modifying Requirements for Pressurizer Code Safety Valve Requirements Specified by TS 3.4.2 & Safety Tank Isolation Requirements Specified in TS 3.4.121998-06-29029 June 1998 Application for Amend to License NPF-6,modifying Requirements for Pressurizer Code Safety Valve Requirements Specified by TS 3.4.2 & Safety Tank Isolation Requirements Specified in TS 3.4.12 2CAN069807, Application for Amend to License NPF-6,revising Surveillance Testing Requirements for Unit 2 Direct Current Electrical Distribution Sys & to Reflect Installation of New Inverters During Next Scheduled Refueling Outage1998-06-29029 June 1998 Application for Amend to License NPF-6,revising Surveillance Testing Requirements for Unit 2 Direct Current Electrical Distribution Sys & to Reflect Installation of New Inverters During Next Scheduled Refueling Outage 2CAN069805, Application for Amend to License NPF-6,providing Range of Acceptable Values for 4160 Volt Bus Loss of Voltage Values, to Be Consistent W/Requirements Set Forth in NUREG-1432,rev 11998-06-29029 June 1998 Application for Amend to License NPF-6,providing Range of Acceptable Values for 4160 Volt Bus Loss of Voltage Values, to Be Consistent W/Requirements Set Forth in NUREG-1432,rev 1 2CAN049802, Application for Amend to License NPF-6,revising Value of Single Largest post-accident Load Capable of Being Supplied by DGs & Relocates Value to Associated Bases1998-04-30030 April 1998 Application for Amend to License NPF-6,revising Value of Single Largest post-accident Load Capable of Being Supplied by DGs & Relocates Value to Associated Bases 1CAN049802, Application for Amend to License DPR-51,revising TS 1.6.1 Re Qpt Definition.Amend Allows Use of Either Incore Detectors or Excore Detectors for Determining Qpt1998-04-30030 April 1998 Application for Amend to License DPR-51,revising TS 1.6.1 Re Qpt Definition.Amend Allows Use of Either Incore Detectors or Excore Detectors for Determining Qpt 1CAN049806, Application for Amend to License DPR-51,changing Order of Channel Rotation During Outage for Scheduling Flexibility, While Still Requiring Rotation Schedule to Be Established for Operating Cycle1998-04-28028 April 1998 Application for Amend to License DPR-51,changing Order of Channel Rotation During Outage for Scheduling Flexibility, While Still Requiring Rotation Schedule to Be Established for Operating Cycle 1CAN049803, Application for Amend to License DPR-51,allowing Upper Tubesheet Volumetric Indications to Remain in Svc for Cycle 15,as Discussed W/Nrc on 980318 & 261998-04-0101 April 1998 Application for Amend to License DPR-51,allowing Upper Tubesheet Volumetric Indications to Remain in Svc for Cycle 15,as Discussed W/Nrc on 980318 & 26 1CAN029803, Application for Amend to License DPR-51,revising TS to Allow Use of Repair Roll Technology (Reroll) for Upper Tubesheet of Sgs.Revised TS Pages,Proprietary Rev 0 to Topical Rept BAW-10232P Included.Proprietary Encl Withheld1998-02-0909 February 1998 Application for Amend to License DPR-51,revising TS to Allow Use of Repair Roll Technology (Reroll) for Upper Tubesheet of Sgs.Revised TS Pages,Proprietary Rev 0 to Topical Rept BAW-10232P Included.Proprietary Encl Withheld 1CAN129702, Application for Amend to License DPR-51,establishing Alternate Repair Criteria for Upper Tubesheet Region of ANO-1 Sgs.Proprietary Topical Rept BAW-10226P Encl.Rept Withheld (Ref 10CFR2.790(b)(4))1997-12-12012 December 1997 Application for Amend to License DPR-51,establishing Alternate Repair Criteria for Upper Tubesheet Region of ANO-1 Sgs.Proprietary Topical Rept BAW-10226P Encl.Rept Withheld (Ref 10CFR2.790(b)(4)) 2CAN099703, Application for Amend to License NPF-6,modifying RPS & ESFAS Trip Setpoint & Allowable Values for SG Low Pressure1997-09-23023 September 1997 Application for Amend to License NPF-6,modifying RPS & ESFAS Trip Setpoint & Allowable Values for SG Low Pressure 2CAN099701, Application for Amend to License NPF-6,reducing Min Required Reactor Coolant Sys Flow Rate Requirements Listed in 3.2.5 Until ANO-2 SGs Are Replaced1997-09-23023 September 1997 Application for Amend to License NPF-6,reducing Min Required Reactor Coolant Sys Flow Rate Requirements Listed in 3.2.5 Until ANO-2 SGs Are Replaced 2CAN079702, Application for Amend to License NPF-6,modifying Actions Associated W/Ts Table 3.3-1 for Reactor Protective Instrumentation & Table 3.3-3 for Esfa Sys Instrumentation1997-07-28028 July 1997 Application for Amend to License NPF-6,modifying Actions Associated W/Ts Table 3.3-1 for Reactor Protective Instrumentation & Table 3.3-3 for Esfa Sys Instrumentation 2CAN079703, Application for Amend to License NPF-6,revising Surveillance Testing Requirements for Facility EFW Sys as Specified in TS 4.7.1.2.Requests That Effective Date for Change Be within 30 Days of Issuance1997-07-21021 July 1997 Application for Amend to License NPF-6,revising Surveillance Testing Requirements for Facility EFW Sys as Specified in TS 4.7.1.2.Requests That Effective Date for Change Be within 30 Days of Issuance 1CAN059702, Application for Amend to License DPR-51,allowing Sufficient Time for Submittal & NRC Review & Approval of Exigent TS Change Request for one-time Exception to Requirements of Section 4.18.5.b Re SG Tube Insp Surveillance Requirements1997-05-0202 May 1997 Application for Amend to License DPR-51,allowing Sufficient Time for Submittal & NRC Review & Approval of Exigent TS Change Request for one-time Exception to Requirements of Section 4.18.5.b Re SG Tube Insp Surveillance Requirements 2CAN049703, Application for Amend to License NPF-6,revising Requirements for Sample Scope Initial Size & Expansion for Inservice Insp Steam Generator Tube Sleeves1997-04-24024 April 1997 Application for Amend to License NPF-6,revising Requirements for Sample Scope Initial Size & Expansion for Inservice Insp Steam Generator Tube Sleeves 2CAN049702, Application for Amend to License NPF-6,permitting Delay of Scheduled three-yr Inspections of Flywheels on All Four RCPs Until Completion of 2R13 Refueling Outage,Scheduled for Winter of 1998-991997-04-18018 April 1997 Application for Amend to License NPF-6,permitting Delay of Scheduled three-yr Inspections of Flywheels on All Four RCPs Until Completion of 2R13 Refueling Outage,Scheduled for Winter of 1998-99 1CAN049703, Application for Amend to License DPR-51,requesting Exigent TS Change Re Steam Generator Tube Insp Surveillance Requirements1997-04-11011 April 1997 Application for Amend to License DPR-51,requesting Exigent TS Change Re Steam Generator Tube Insp Surveillance Requirements ML20133A6801996-12-23023 December 1996 Application for Amend to License NPF-6,revising TS 3/4.7.8 Which Will Enable on-line Testing of Selected Snubbers by Clarifying Intent of TS 2CAN129603, Application for Amend to License NPF-6,requesting Change to Power Calibr Requirements1996-12-19019 December 1996 Application for Amend to License NPF-6,requesting Change to Power Calibr Requirements 2CAN129611, Application for Amend to License NPF-6,requesting to Provide Addl NRC-approved Methodology in List of References in TS 6.9.51996-12-19019 December 1996 Application for Amend to License NPF-6,requesting to Provide Addl NRC-approved Methodology in List of References in TS 6.9.5 2CAN129604, Application for Amend to License NPF-6,requesting Deletion of Specific Value for Total Reactor Coolant Sys Volume in TS 5.4.21996-12-19019 December 1996 Application for Amend to License NPF-6,requesting Deletion of Specific Value for Total Reactor Coolant Sys Volume in TS 5.4.2 2CAN119609, Application for Amend to License NPF-6,revising Surveillance Requirements for Unit 2 Re SG Tubing,Ts 4.4.5.CEN-630-NP & CEN-630-P Repts encl.CEN-630-P Rept Withheld,Per 10CFR2.790(b)(4)1996-11-26026 November 1996 Application for Amend to License NPF-6,revising Surveillance Requirements for Unit 2 Re SG Tubing,Ts 4.4.5.CEN-630-NP & CEN-630-P Repts encl.CEN-630-P Rept Withheld,Per 10CFR2.790(b)(4) 2CAN119610, Application for Amend to License NPF-6,adding Suppl 1-P & Approval Ltr to Section 6.9.5.1 in Support of Increased SG Tube Plugging Limit Beyond 10% Ref to Small Break LOCA Methodology CENPD-1371996-11-24024 November 1996 Application for Amend to License NPF-6,adding Suppl 1-P & Approval Ltr to Section 6.9.5.1 in Support of Increased SG Tube Plugging Limit Beyond 10% Ref to Small Break LOCA Methodology CENPD-137 2CAN109603, Application for Amend to License NPF-6,changing Channel Functional Testing Frequency for Most of Reactor Protection Sys (RPS) & ESFAS Instrumentation from Monthly to Every Four Months1996-10-0707 October 1996 Application for Amend to License NPF-6,changing Channel Functional Testing Frequency for Most of Reactor Protection Sys (RPS) & ESFAS Instrumentation from Monthly to Every Four Months 0CAN109602, Application for Amends to Licenses DPR-51 & NPF-6,reducing Costs for Licensees by Allowing Change to Requirements W/O Necessarily Requiring License Amend,Per GL 95-101996-10-0202 October 1996 Application for Amends to Licenses DPR-51 & NPF-6,reducing Costs for Licensees by Allowing Change to Requirements W/O Necessarily Requiring License Amend,Per GL 95-10 0CAN109603, Application for Amend to Licenses DPR-51 & NPF-6 Re Relocation of RETS Per GL 89-011996-10-0202 October 1996 Application for Amend to Licenses DPR-51 & NPF-6 Re Relocation of RETS Per GL 89-01 0CAN089606, Application for Amends to Licenses DPR-51 & NPF-6,allowing Implementation of Approved Option B to 10CFR50,App J1996-08-23023 August 1996 Application for Amends to Licenses DPR-51 & NPF-6,allowing Implementation of Approved Option B to 10CFR50,App J 2CAN089601, Application for Amend to License NPF-6,relocating RCS Flow Rate Limit from TS & to Colr,Iaw/Gl 88-16, Removal of Cycle-Specific Parameter Limits from Ts1996-08-23023 August 1996 Application for Amend to License NPF-6,relocating RCS Flow Rate Limit from TS & to Colr,Iaw/Gl 88-16, Removal of Cycle-Specific Parameter Limits from Ts 2CAN089609, Application for Amend to License NPF-6,revising Section 5.0, Design Features & Would for Most Part,Adopt NUREG-1432 Rev 1,improved, Std Tech Specs for C-E Plants, for Section of TS1996-08-23023 August 1996 Application for Amend to License NPF-6,revising Section 5.0, Design Features & Would for Most Part,Adopt NUREG-1432 Rev 1,improved, Std Tech Specs for C-E Plants, for Section of TS 0CAN069601, Application for Amends to Licenses DPR-51 & NPF-6,allowing Reactor Containment Bldg Equipment Hatch Doors to Remain Open During Fuel Handling & Core Alterations1996-06-28028 June 1996 Application for Amends to Licenses DPR-51 & NPF-6,allowing Reactor Containment Bldg Equipment Hatch Doors to Remain Open During Fuel Handling & Core Alterations 1999-09-19
[Table view] |
Text
.
S* *. Entergy OperationJ,Inc.
72801 L.1/ Tel 501-858-4888
.* C. Randy Hutchinson vre Presonnt Orxvatus ANO August 18,1999 2CAN089905
)
U. S. Nuclear Regulatory Commission Document Control Desk Mail Station OPI-17 Washington, DC 20555
Subject:
Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6 Proposed Technical Specification Change Request Concerning Steam Generator Inspection Requirements for the Replacement Steam Generators l Gentlemen:
Attached for your review and approval is a proposed Arkansas Nuclear One, Unit 2 (ANO-2)
Technical Specification amendment associated with the Replacement Steam Generator (RSG)
Project that modifies the surveillance requirements for the steam generators. In order to facilitate the replacement of the original steam generators, the requirements for tube repair (sleeving) will be removed and the requirements for preservice and inservice inspection of the tubes will be clarified. Changes to the inspection interval and reporting requirements are also requested.
l Entergy is aware of efforts underway to develop revised technical specifications regarding steam generator tube inspections; however, these efforts have not yet culminated in mutually agreeable language between the industry and the NRC. The ANO-2 proposed technical specifications will continue to utilize the general guidance of the existing standard technical specifications language of NUREG-0212, Rev. 4, " Standard Technical Specifications Combustion Engineering Plants."
The proposed change has been evaluated in accordance with 10CFR50.91(a)(1) using criteria j in 10CFR50.92(c) and it has been determined that this change involves no significant hazards I I
considerations. The bases for these determinations are included in the attached submittal.
Entergy Operations requests that the effective date for implementation of this change be prior to restart from the 2R14 refueling outage which is currently scheduled to begin on dg September 15,2000. Although this request is neither exigent nor emergency, your timely review is requested.
n A id ' Y 9908250231 990818 PDR ADOCK 05000368 P PDR
" U.S.NRC August 18,1999 2CAN089905 P;ge 2 Very truly y urs,
)
gg '
CRH/dwb Attachments To the best of my knowledge and belief, the statements contained in this submittal are true.
SUBSCRIBED AND SWORN TO before e, a Notary Public in and for h County and the State of Arkansas, this / day of Od ,19999 V
4G'ML- -
/[
J N .T PP Notary Pupic '**ff8';*sTyS^8 My Commission Empires k '[/-MG6 wc-m .om.u...mo i
i l
. , U. S. NRC August 18,1999 2CAN089905 Page 3 cc: '
Mr. Ellis W. Merschoff Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 Mr. Chris Nolan NRR Project Manager Region IV/ANO-2 U. S. Nuclear Regulatory Commission NRR Mail Stop 04-D-03 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. David D. Snellings Director, Division of Radiation Control and Emergency Management Arkansas Department ofHealth 4815 West Markham Street Little Rock, AR 72205
i i
t I
ATTACHMENT IQ 2CAN089905 PROPOSED TECHNICAL SPECIFICATION A_N_D RESPECTIVE SAFETY ANALYSES IN THE MATTER OF AMENDING LICENSE NO. NPF-6 1
ENTERGY OPERATIONS. INC.
ARKANSAS NUCLEAR ONE. UNIT TWO DOCKET NO. 50-368 1
i I I I
i
h, ' '
Attachm:nt to j 2CAN089905 Page 1 of 9
}
DESCRIPTION OF PROPOSED CIIANGES To' accommodate replacement of the original steam generators at Arkansas Nuclear One -
Unit 2 (ANO-2), the requirements for tube repair currently specified in ANO-2 Technical Specifications (TS) Surveillance Requirements (SR) 4.4.5.0 and the associated Bases for Specification 3/4.4.5 need to be revised. The resulting ANO-2 requirements for the replacement steam generators will be consistent with the requirements in the standard l technical specifications (i.e., NUREG-0212, Revision 4) that do not include provisions for repair (sleeving) of the tubes. The requirements for preservice and inservice inspection of tubes will also be clarified The specific changes are as follows:
Technical Specification 4.4.5.0 will be revised to add a " Note" exempting the replacement steam generators from inservice inspection requirements during the replacement steam generator outage.
l
. Technical Specification 4.4.5.2 will be revised to delete the reference to Table 4.4-3 regarding steam generator tube sleeve inspection and the requirement that tubes selected for inservice inspection include at least 20% of each type ofinstalled sleeves.
. Technical Specification 4.4.5.3 will be revised to extend the inspection interval to a maximum of once per 40 months provided the inspection results from the first inspection
( following the preservice inspection fall into the C-1 category.
. Technical Specifications 4.4.5.2.c, 4.4.5.3.b, and 4.4.5.3.c will be revised to delete the reference to Table 4.4-3.
. Technical Specifications 4.4.5.4.a.1, 4.4.5.4.a.6, and 4.4.5.4.a.7 will be revised to delete the references to sleeving, repair limit, and the B&W and CENO repair reports. Technical Specification 4.4.5.4.a.3 will be revised to delete the word " wastage."
. Technical Specification 4.4.5.4.a.10 will be revised to delete the requirement that the l baseline preservice eddy current inspection be performed after the field hydrostatic test.
J
. l Technical Specification 4.4.5.4.b will be revised to delete the references to sleeving, repair 9 limit, Table 4.4-3, and the B&W and CENO repair reports. l Technical Specification 4.4.5.5.a and 4.4.5.5.b will be revised to delete the requirement that inservice inspection reports include the number of sleeved tubes. Section 4.4.5.5.b is also revised to be consistent with the guidance for reporting frequency contained in NEI j 97-06, Revision 0, " Steam Generator Program Guidance."
3
\
. Technical Specification 4.4.5.5.c will be revised to delete the reference to Table 4.4-3. I Section 4.4.5.5.c. is also revised to clarify what is meant by " prior to resumption of plant operation."
! I
r
, Attachment to 2CAN089905 Page 2 of 9 Technical Specification Table 4.4-2 will be revised to delete words "non-repaired" from
,the title and "or sleeve" from the Action Required columns. l
- Technical Specification Table 4.4-3 will be deleted.
- Bases for Technical Specification 3/4.4.5 will be revised to remove the references to sleeving, repair and the B&W and CENO repair reports. Additionally, the term " wastage-type" defects and reference to reliably detecting 20% tube degradation will be removed.
BACKGROUND Prior to 1991, the original steam generators at ANO-2 only experienced mechanical wear at the batwing tube support straps due to cross flew in the upper tube bundle region. In 1991, axially oriented stress corrosion cracking at the eggerate tube support plates was identified.
The cracking was initiated on the outside portion of the tubing on the secondary side of the original steam generators due to corrosion product transport and buildup from the balance-of-plant piping and components.
In 1992, circumferential cracking was first discovered in the portion of tubing just above where the tube is expanded into the tubesheet. This expansion transition area is a region of higher residual stress where the tube decreases in diameter from the expansion down to the nominal diameter of the tubing (3/4").
Because of the large number of defective tubes, sleeves were installed in the tubes at the top-of-tubesheet area to remove the defective area from the pressure boundary and reduce lost margin to the tube plugging limit (maximum number of tubes that could be plugged).
1 Since 1992, ANO-2 experienced axial cracking in freespan regions of the tubing between the tube support plates and areas of the tube where denting has occurred due to a buildup of secondary side corrosion products reducing the diameter of the tubing.
The original steam generators at ANO-2 will be replaced during the refueling outage that follows fuel cycle 14. ANO-2 will subsequently operate with replacement steam generators starting with fuel cycle 15.
l The U-tubes in the ANO-2 steam generators provide for the transfer of heat between the primary and secondary coolants and are part of the primary pressure boundary. The tubes are periodically inspected for indication of degradation. If significant degradation is found, the tube may be removed from service by installing a plug at each end. Plugging of a tube results in a slight reduction of the available heat transfer area and the flow area for the primary coolant. If a large number of tubes are plugged, safety analyses may need to be revised and a power reduction may be required. To address the adverse effects of extensive tube plugging, repair of tubes using a sleeve has been developed. The sleeve spans the degraded area and a connection between the tube and sleeve is made above and below the degraded area.
F~
Attachment to 2CAN089905 Page 3 of 9 The sleeving repair design is approved on a sleeve and tube design specific basis. Since there are several differences in tubes in the replacement steam generators from those in the original steam generators, the referenced sleeve designs and associated repons are no longer applicable and are to be removed from the ANO-2 Technical Specifications.
The replacement steam generators use thermally treated Alloy 690 tubes and other design enhancements. Because of the improved materials and manufacturing processes, the tubing in the replacement steam generators is not expected to experience the amount of degradation that has been seen in the original steam generators. This expectation is supported by operating experience with other plants that have replacement steam generators built with the same materials and manufacturing processes. Therefore, a new sleeving design appropriate to the new tube diameter is not expected to be required.
The ASME Code,Section III hydrostatic test for the replacement steam generators is completed in the manufacturing shop prior to shipment. The pressure testing in an operating plant is limited by the rules of ASME Code Section XI. The pressure testing following a repair in an operating plant is a function of the operating pressure. Preservice inspection of the tubes at the ANO-2 site will provide verification that the tubes were not adversely affected by the maximum pressure that they experienced during hydrostatic testing.
DISCUSSION OF CIIANGE For the purpose of evaluation, the requested changes to the ANO-2 Technical Specifications for tube inspection can be grouped into the following six areas:
- 1. The first area of change is to add a " Note" to exempt the replacement steam generators from inservice inspection requirements during the steam generator replacement outage.
Since the replacement steam generators will be subjected to a preservice inspection at the ANO-2 site prior to installation, there is no need to perform inservice inspection upon installation.
- 2. The second area of change is to remove the references to repair of the original steam generator tubes by sleeving since they are not applicable to the tubes in the replacement steam generators. These changes modify the ANO-2 Technical Specifications to be consistent with the standard technical specification (i.e., NUREG-0212, Revision 0) for tube inspection. The current revised standard technical specifications (NUREG-1432, Rev.1) do not propose revised testing technical specifications at this time. The tubing diameter and thickness in the replacement steam generators are different from the original steam generators. Therefore, the sleeving designs described in the referenced reports are inappropriate. The replacement steam generators use metallurgy and fabrication technology that has proven to be very resistant to corrosion related degradation. A sleeving design for the replacement steam generators is not expected to be required. <
Tubes in the replacement steam generators will require plugging for imperfections ;
exceeding the 40% plugging limit. The plugging limits will consist solely of the through-1 I
l l
Attachtet to 2CAN08r,05 Page 4 of 9 wall criteria and will require that tubes be plugged when degradation meets or exceeds the plugging limit of 40% of the nominal wall thickness. ASME Section XI,1992 edition, provides the depth of an allowable outside diameter (OD) flaw for tubes in service. The replacement steam generators have tubing fabricated from SB-163 Alloy UNS N06690 (Alloy 690) inspected preservice per the requirements of Section III,1992 edition, NB-2250. For such tubing, ASME Section XI IWB-3521.1 defines the depth of allowable indications: for tubing having a radius to thickness (r/t) ratio ofless than 8.7, the depth of an allowable OD flaw shall not exceed 40% of the tube wall thickness. The replacement steam generator tubing has an r/t ratio less than 8.70 using either the inside diameter or the OD. Using the OD is conservative-R/t = (OD/2) / (t) = (0.688"/2) / (0.040") = 8.60 In addition analysis per Regulatory Guide 1.121 will be performed to establish the required minimum wall thickness for the replacement steam generators. The Regulatory Guide 1.121 analysis will be performed using Westinghouse methodology and will include assessment of the loads that result from postulated accident conditions, including a safe shutdown earthquake (SSE) in combination with a loss of coolant accident (LOCA) break, a steam line break (SLB) or a feedwater line break (FLB).
For the LOCA plus SSE analysis of dynamic loadings, the most recent version of the ABB-CE computer code CEFLASH-4A will be used to generate the dynamic response (i.e., pressure time histories) due to a LOCA pipe break. The Westinghouse WECAN/Plus computer code will be used for the structural analysis, including the development and assessment of the loads resulting from the SSE in combination with the dynamic response due to a LOCA pipe break. These computer codes are consistent with those used in the pipe break analysis for the original steam generators. CEFLASH-4A is the same computer code that was used for the original steam generators. WECAN/Plus is a Westinghouse developed proprietary structural analysis computer code that is functionally equivalent to the industry developed ANSYS computer code that was used for the original steam generators. WECAN/Plus is the workstation version of the WECAN (Westinghouse Electric Computer Analysis) computer code that has been used extensively by Westinghouse in the design analyses of NSSS seismic Category I components designated as ASME Code Class 1,2 or 3. The WECAN and WECAN/Plus computer codes have been used by Westinghouse in previous replacement steam generator Regulatory Guide 1.121 analysis. The use of WECAN/Plus in the ANO-2 Regulatory Guide 1.121 analysis will be a first time application to ANO-2.
For the Westinghouse designed tube bundle, dynamic load effects on the tubes resulting from SLB/FLB loads do not result in significant tube stresses relative to the determination of the tube minimum wall thickness. During the postulated SLB/FLB accidents, the predominant primary tube stresses result from the primary to secondary side through-wall pressure gradient. The peak differential pressures for these events are obtained from the results of transient blowdown analyses that are based on a full double-ended mpture of the main steam line/ main feedwater line. In both cases, the secondary side of the faulted
I , ,
Attachment to
' 2CAN089905 Page 5 of 9 l
steam generator blows down to the ambient pressure. The SLB/FLB dynamic loads on the Westinghouse designed tube bundle are sufficiently small that they are not limiting, and
'therefore, do not require detailed analysis.
- 3. The third change is to revise the inspection interval to extend it to a maximum of once per 40 months provided the inspection results from the first inspection following the
, preservice inspection fall into the C-1 category. Significant industry knowledge has been gained from monitoring the performance of steam generators that have been replaced.
Alloy 690 tubing material has proven to be superior to Alloy 600 in regard to corrosion resistance. Plants that have utilized Alloy 690 tubing in their replacement steam generators have not experienced corrosion-induced degradation (some plants have as many as 10 years operating experience without any detectable tube degradation). Also, tubing that has been thennally treated has shown little, if any, corrosion-induced degradation. The primary failure mechanism expected with this type of tube is mechanical wear due to flow-induced vibration.
Due to the design and construction of the replacement steam generators, and based on the operating experience of the Alloy 690 material, it is acceptable to extend the inspection interval to a maximum of once per 40 months if: 1) the inspection results from the first inspection following the presenice inspection fall into the C-1 category, and 2) after one cycle of operation no corrosion-mduced mechanisms are identified and wear is found to be minimal such that growth would not exceed 40% through-wall for the next inspection interval. The basis for excluding wear is that the mechanism is easily detected with the bobbin-coil eddy current technique, which is approved through the Electric Power Research Institute (EPRI) Guidelines as a qualified sizing technique. Typically, the growth rate associated with wear is very low (on the order of 2% through-wall per 18 months) and is predictable. The operational assessment performed following each inservice inspection will address the detection capabilities and growth rates associated with the wear that is identified. Based on the length of the next operating interval, the evaluation would determine if the growth rate of the identified wear would exceed the repair limit. If the repair limit is predicted to be exceeded, the tubes would be removed from service or the operating interval would be decreased.
The inspection interval may continue to be extended to a maximum of once per 40 months thereafter if two consecutive inspections demonstrate that previously observed degradation has not continued and no additional degradation has occurred. Based on today's stringent chemistry controls, which are based on the latest version of the EPRI Guidelines, minimal damage would be expected due to corrosion-induced degradation for Alloy 690 material.
- 4. The founh area of change is to revise the preservice inspection requirements to accommodate the difference between the original steam generators and the replacement steam generators regarding when the ASME Code Section III hydrostatic test and the presenice eddy current inspection of the tubes are performed. For the original steam generators, the hydrostatic test was done as part of the reactor coolant system hydrostatic
, Attachment to 2CAN089905 Page 6 of 9 test. The presenice eddy current inspection for the original steam generators was performed after the field hydrostatic test to find indications of adverse effects due to the
' hydrostatic test. There was no separate hydrostatic test for the original steam generators.
For the replacement steam generatort, the hydrostatic test will be performed at the manufacturing facility. The preservice eddy current inspection for the replacement steam generators will be performed at the plant site following the hydrostatic test, but prior to installation, in order to shorten the duration of the replacement outage. It will confirm that there are no adverse effects due to the hydrostatic test and will establish a baseline condition of the tubes for future inspections. The preservice eddy current inspection will be performed under the direction of Entergy to assure that the equipment and techniques used for the preservice inspection are the same as those expected to be used during subsequent inservice inspections, consistent with the requirements of Specification 4.4.5.4.a.10. Following installation of the replacement steam generators, an ASME Code Section XI post-repair leakage test will be performed. Since the post-repair leakage test for an operating plant will be at a much lower pressure than the hydrostatic test, it will not change the baseline condition of the tubes prior to operation.
- 5. The fifth area of change is to revise section 4.4.5.5.b to be consistent with the guidance for reporting frequency contained in NEI 97-06, Revision 0, " Steam Generator Program Guidance." Rather than continue reponing the complete results of the inservice inspections on an annual basis, the wording would be revised to report the results within 12 months following the completion of the inservice inspection. Currently, repons are submitted each year prior to March 1" For inservice inspections completed late in the calendar year, little time is available to complete the analysis work, prepare and process the report for submittal to the NRC. The change to the NEI guidance would ease the administrative burden for preparation and submittal of these reports. The change in this reporting frequency would not affect the requirements for submittal of the C-3 Report which is required if the inservice inspection should reveal more than 10% of the total tubes inspected to be degraded or if more than 1% of the inspected tubes are determined to be defective.
Additionally, the wording in section 4.4.5.5.c. is revised to clarify what is meant by " prior to resumption of plant operation." In the past this phrase has resulted in confusion. The intent is to make notification to the NRC prior to entering Mode 4 when the steam generators are required to be operable.
- 6. The sixth area of change is to revise the bases to delete reference to tube repair and
" wastage-type" defects. Wastage is an historical term that relates to tube degradation associated with phosphate chemistry control which is no longer utilized at ANO-2.
Additionally, the bases refer to reliably detecting 20% tube degradation. ANO uses the qualified or equivalent techniques for flaw detection as outlined in EPRI TR-107569, Vol.
1, Rev. 5, "PWR Steam Generator Examination Guidelines." This ensures that the minimum detectability of the technique used is capable of finding those flaws (with high I probability) that would challenge structural integrity. The 20% value in the bases was a l consenative, arbitrary percentage that was based on the ability to detect wastage-type l
l l
l
, , Attachment to 2CAN089905 Page 7 of 9 (volumetric) flaws. The detection of linear-type flaws is more difficult and more
, challenging. While 20% tube degradation of both types can be detected, the probability of detection is lower for linear-type flaws. The probability for flaw detection is described in the EPRI document.
DETERMINATION OF NO SIGNIFICANT HAIARDS CONSIDERATION Entergy Operations, Inc. is proposing that the Arkansas Nuclear One Unit 2 (ANO-2)
Operating License be amended to modify the surveillance requirements for the steam generators. An evaluation of the proposed change has been performed in accordance with 10CFR50.91(a)(1) regarding no significant hazards considerations using the standards in 10CFR50.92(c). A discussion of these standards as they relate to this amendment request follows:
Criterion I - Does Not Involve a Significant Increase in the Probability or Consequences of an Accident Previously Evaluated.
The accidents ofinterest are a tube mpture, loss of coolant accident (LOCA) in combination with a safe shutdown earthquake and a steam line break in combinadon with a safe shutdown earthquake. A redcction in tube integrity could increase the possibility of a tube mpture accident and increase the consequences of a steam line break or LOCA. The tubing in the replacement steam generators is designed and evaluated consistent with the margins of safety specified in the ASME Code,Section III. The program for periodic inservice inspection provides suflicient time to take proper and timely corrective action if tube degradation is present. The ASME Section XI basis for the 40% through wall plugging limit is applicable to the replacement steam generators just as it was to the original steam generators. As a result there is no reduction in tube integrity for the replacement steam generators.
Addition of a " Note" to clarify that inservice inspection is not required during the steam generator replacement outage is an administrative change that provides clarification regarding inservice inspect!an requirements. The change in reporting requirements is also an administrs.tive change. The requirements for inservice inspection or the plugging limit for the tubes are not altered by these administrative changes. Additionally, changes were made to the bases to remove potentially misleading information. Bases changes are considered to be administrative in nature.
Elimination of the repair option and the associated references to repair of the original steam l generator tubes is an administrative adjustment since the sleeve design is not applicable to the replacement steam generators. The elimination of the repair option does not alter the requirements for inservice inspection or reduce the plugging limit for the tubes.
l l
The proposed change to extend the inspection interval to a maximum of once per 40 months is l acceptable based on the use of the superior Alloy 690 tubing material. Significant industry knowledge has been gained from monitoring the performance of steam generators that have
I , . Attachment to 2CAN089905 Pcge 8 of 9 been rcplaced. Alloy 690 tubing material has proven to be superior to Alloy 600 in regard to corrosion resistance. Plants that have utilized Alloy 690 tubing in their replacement steam gen'erators have not experienced corrosion-induced degradation.
A preservice eddy current inspection will be performed onsite prior to installation of the replacement steam generators. The orientation of the replacement steam generators during l
the eddy current exam will not impact the results. The hydrostatic test required by the ASME Code Section III for the replacement steam generators is to be performed in the manufacturing facility and not as part of a reactor coolant system hydrostatic test. The post-repair leakage test required by the ASME Code,Section XI for an operating plant is performed at a much lower pressure. No evolutions subsequent to the replacement steam generator hydrostatic test are expected to occur that will change the condition of the tubes prior to operation. This change does not alter the requirement to perform a presenice inspection. As a result, an inservice inspection is not required during the steam generator replacement outage.
The requested ANO-2 Technical Specification changes do not alter the requirements for tube integrity, tube inspection, or tube plugging limit. Therefore, this change does not involve a significant increase in the probability or consequences of any accident previously evaluated.
Criterion 2- Does Not Create the Possibility of a New or Different Kind of Accident from any Previously Evaluated.
The proposed changes do not affect the design or function of any other safety-related component. There is no mechanism to create a new or different kind of accident for the replacement steam generators by eliminating repair criteria or by clarifying the applicable preservice and insewice inspection requirements because a baseline of tube conditions is established and plugging limits are maintained to ensure that defective tubes are removed from service. A change in inspection frequency has a negligible impact on the pre-accident state of the reactor core or p. st' accident confinement of radionuclides within the containment building. Changing the inspection frequency creates no new failure modes or accident initiators / precursors.
The requested ANO-2 Technical Specification changes do not alter the requirements for tube integrity, tube inspection or tube plugging limit. Therefore, this change does not create the possibility of a new or different kind of accident from any previously evaluated.
Criterion 3 - Does Not Involve a Significant Reduction in the Margin of Safety.
The tubing in the replacement steam generators is designed and evaluated consistent with the margins of safety specified in the ASME Code,Section III. The program for peiiodic inservice inspection provides sufficient time to take proper and timely corrective action to preserve the design margin if tube degradation is present.
l
. Attachment to 2CAN089905 Page 9 of 9 l
Due to the superior Alloy 690 tubing material and the significant amount of industry
, knowledge and operating history with this improved tubing material, extending the inspection interval to a maximum of once per 40 months will still allow the integrity of the steam generator tubing to be ensured. The steam generator inspection program is not intended to provide an accident mitigation or assessment function; therefore, this change results in a l neutral impact to the margin of safety.
l Based upon the reasoning presented above and the previous discussion of the amendment i
request, Entergy Operations has determined that the requested change does nat involve a significant hazards consideration.
ENVIRONMENTAL IMPACT EVALUATION 10 CFR 51.22(c) provides criteria for and identification of licensing and regulatory actions eligible for categorical exclusion from performing an environmental assessment. A proposed amendment to an operating license for a facility requires no environmental assessment if operation of the facility in accordance with the proposed amendment would not: (1) involve a significant hazards consideration, (2) result in a significant change in the types or significant increase in the amounts of any effluents that may be released off-site, or (3) result in a significant increase in individual or cumulative occupational radiation exposure. Entergy Operations, Inc. has reviewed this license amendment and has determined that it meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the proposed license amendment. The basis for this determination is as follows:
- 1. The proposed license amendment does not involve a significant hazards consideration as described previously in the evaluation.
- 2. As discussed in the significant hazards evaluation, this change does not result in a significant change or significant increase in the radiological doses for any Design Basis Accident. The proposed license amendment does not result in a significant change in the types or a significant increase in the amounts of any efiluents that may be released off-site.
- 3. The proposed license amendment does not result in a significant increase to the individual or cumulative occupational radiation exposure. This change simply revises the surveillance requitemcats of the steam generator tube inspection program and results in no physical changes to plant equipment or methodologies that could result in an increase in occupational radiation exposure.