Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20210B360 + (ML20210B360)
- ML20210B362 + (ML20210B362)
- ML20210B365 + (ML20210B365)
- ML20210B366 + (ML20210B366)
- PNO-IV-87-024, on 870429,licensee Announced Intent to Sell Nuclear Operations.No Time Frame for Divestiture of Holdings Specified + (ML20210B368)
- ML20210B369 + (ML20210B369)
- ML20210B372 + (ML20210B372)
- ML20210B374 + (ML20210B374)
- ML20210B375 + (ML20210B375)
- ML20210B376 + (ML20210B376)
- NOC-AE-000583, LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With + (ML20210B378)
- ML20210B380 + (ML20210B380)
- ML20210B382 + (ML20210B382)
- ML20210B383 + (ML20210B383)
- 05000456/LER-1987-022, :on 870331,turbine Trip/Reactor Trip Signal Occurred.Caused by Operator Failure to Follow Procedure. Permissive Test Switch Returned to Off Position & Personnel Instructed to Pay Attention to Details + (ML20210B384)
- 05000324/LER-1987-005-02, :on 870330,HPCI Sys Steam Supply Outboard Primary Containment Isolation Valve E41-F003 Declared Inoperable.Caused by Blown Control Power Fuse in Valve Operator Motor Breaker.Fuse & Coil Replaced + (ML20210B387)
- ML20210B390 + (ML20210B390)
- ML20210B391 + (ML20210B391)
- ML20210B393 + (ML20210B393)
- ML20210B394 + (ML20210B394)
- ML20210B395 + (ML20210B395)
- ML20210B396 + (ML20210B396)
- ML20210B402 + (ML20210B402)
- ML20210B403 + (ML20210B403)
- L-87-195, Advises That Engineering Evaluation of Mangroves Will Be Submitted by 870715 + (ML20210B404)
- ML20210B408 + (ML20210B408)
- ML20210B409 + (ML20210B409)
- ML20210B410 + (ML20210B410)
- ML20210B414 + (ML20210B414)
- TXX-6144, Forwards Responses to Violations Noted in Insp Repts 50-445/84-32 & 50-446/84-11.Corrective Actions:Qa Overview Committee Formed & Meets on Regular Basis Since Sept 1985 & Procedure DQP-CS-4 Revised + (ML20210B415)
- ML20210B417 + (ML20210B417)
- ML20210B418 + (ML20210B418)
- ML20210B420 + (ML20210B420)
- ML20210B423 + (ML20210B423)
- ML20210B424 + (ML20210B424)
- ML20210B427 + (ML20210B427)
- ML20210B429 + (ML20210B429)
- ST-HL-AE-2133, Forwards marked-up Proof & Review Tech Spec Pages 3/4 8-18 & 3/4 8-3 Which Should Have Been Included in + (ML20210B430)
- ML20210B431 + (ML20210B431)
- ML20210B432 + (ML20210B432)
- ML20210B433 + (ML20210B433)
- ST-HL-AE-2137, Forwards Annotated Revs to FSAR Chapters 7,9 & 11,reflecting Design Mods to Reactor Containment Bldg 18-inch Supplemental Purge Lines to Isolate on High Radiation Signal.Revs Will Be Incorporated Into Future FSAR Amend + (ML20210B435)
- ML20210B438 + (ML20210B438)
- ML20210B440 + (ML20210B440)
- ML20210B441 + (ML20210B441)
- ML20210B442 + (ML20210B442)
- ML20210B443 + (ML20210B443)
- ML20210B444 + (ML20210B444)
- ML20210B445 + (ML20210B445)
- ML20210B447 + (ML20210B447)
- VPN-061-99, Forwards Rept Describing Effects of Earthquake That Occurred on 990702 Near Satsop,Wa,Iaw Trojan Nuclear Plant Defueled Sar,Section 4.1.3.1 + (ML20210B448)