Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20209A713 + (ML20209A713)
- ML20209A715 + (ML20209A715)
- ML20209A717 + (ML20209A717)
- ML20209A718 + (ML20209A718)
- ML20209A719 + (ML20209A719)
- ML20209A720 + (ML20209A720)
- ML20209A721 + (ML20209A721)
- ML20209A722 + (ML20209A722)
- ML20209A723 + (ML20209A723)
- ML20209A726 + (ML20209A726)
- NUREG-0032, Fuel Performance of Licensed Nuclear Power Plants Through 1974 + (ML20209A729)
- PY-CEI-NRR-0580, Forwards LERs 86-091-00,86-092-00,86-093-00 & 86-094-00 + (ML20209A731)
- ML20209A732 + (ML20209A732)
- ML20209A734 + (ML20209A734)
- ML20209A735 + (ML20209A735)
- ML20209A736 + (ML20209A736)
- 05000336/LER-1986-021-01, :on 861231,broken Springs Found in Two of Eight Valcor Solenoid Operated Valves.Caused by Hydrogen Embrittlement as Discussed in Valcor Part 21 Notification & IE Info Notice 86-072.Springs Replaced + (ML20209A739)
- ML20209A744 + (ML20209A744)
- ML20209A745 + (ML20209A745)
- ML20209A746 + (ML20209A746)
- ML20209A748 + (ML20209A748)
- ML20209A749 + (ML20209A749)
- ML20209A751 + (ML20209A751)
- U-603227, Provides Updated Rept on Status of Decommissioning Funding for Plant.Updated Rept Provides Min Decommissioning Fund Estimate,Per 10CFR50.75(b) & (C) Utilizing NUREG-1307,Rev 8 Methodology + (ML20209A755)
- ML20209A757 + (ML20209A757)
- ML20209A759 + (ML20209A759)
- 05000440/LER-1986-092, :on 861230,reactor Shutdown Conducted to Comply W/Tech Spec 3.4.4,due to High Reactor Coolant Conductivity. Caused by Failure of Three Main Condenser Tubes.Leakage & Damaged Tubes Plugged & Loose Lagging Removed + (ML20209A761)
- ML20209A762 + (ML20209A762)
- ML20209A766 + (ML20209A766)
- ML20209A767 + (ML20209A767)
- ML20209A768 + (ML20209A768)
- ML20209A769 + (ML20209A769)
- ML20209A771 + (ML20209A771)
- NG-99-0859, Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants,Per GL 98-01.Y2K Readiness Disclosure for Plant Encl + (ML20209A773)
- ML20209A775 + (ML20209A775)
- ML20209A777 + (ML20209A777)
- ML20209A779 + (ML20209A779)
- ML20209A781 + (ML20209A781)
- ML20209A788 + (ML20209A788)
- 05000370/LER-1986-014-02, :on 860818,operability of Diesel Generator 2B Not Verified as Required.On 860810,operability of Diesel Generator 2A Not Verified.Caused by Personnel Error. Procedures Will Be Enhanced + (ML20209A790)
- ML20209A791 + (ML20209A791)
- ML20209A794 + (ML20209A794)
- ML20209A795 + (ML20209A795)
- ML20209A796 + (ML20209A796)
- ML20209A797 + (ML20209A797)
- ML20209A799 + (ML20209A799)
- IR 05000400/1986062 + (ML20209A800)
- ML20209A801 + (ML20209A801)
- ML20209A802 + (ML20209A802)
- ML20209A807 + (ML20209A807)
- ML20209A808 + (ML20209A808)