Forwards Insp Rept 50-400/86-62 on 860707-25.No Violation or Deviation Noted
ML20209A736
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/25/1986
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20209A741 List:
References
NUDOCS 8609080092
Download: ML20209A736 (2)


See also: IR 05000400/1986062

Text

_.

--

.l

. . .

{ u,

,

AUG 2 51986

Docket No. 50-400

License No. CPPR-158

Carolina Power and Light Company

[ ATTN: Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. O. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NO. 50-400/86-62

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

T. D. Gibbons on July 7-25, 1986. The inspection included a review of activities

authorized fcr your Harris facility. At the conclusion of the inspection, the

findings were discussed with those members of your staff identified in the

enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Your attention is invited to unresolved items identified in the inspection

report. These matters will be pursued during future inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclo~sure

will be placed in the NRC Public Document Room.

Should you <have any questions concerning this letter, please contact us.

Sincerely,

//

l$ f

Dav'd M. Verrelli, Chief

Reactor Projects Branch 2

Division of Reactor Projects

l

Enclosure: (See page 2)

, ,

8609030092 860825 0

PDR ADOCK 0500

po/  !

-

- _ . -

_-

_.

o AUG 2 51986

. .

Carolina Power and Light Company

'

2

'

Enclosure:

NRC Inspection-Report

cc w/ enc 1:

A.A. Watson,VicePresident

Harris Nuclear Project

y/D. L. Tibbitts, Director of Regulatory

Compliance

/J. L. Willis, Plant General Manager

b

/ ec

C. w/ encl:

Barth, ELD

/J. Moore, ELD -

/ NRC Resident Inspector

Document Control Desk

State of North Carolina

,

t

't

d

4

?

RII RI RII

TDGibbons:er

i

TEConlon ARHerdt DMVerrelli

08/>i/86 084g/86 08/ /86

08/f//86

,

,- - - - . , , - . . , - . . s-,.,..----- ,--.,----,-..,-,..---c..- , , . , , , . , - -. -.-,-.~.: