AUG 2 51986
Docket No. 50-400
License No. CPPR-158
[ ATTN:
Carolina Power and Light Company
Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. O. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT: NRC INSPECTION REPORT NO. 50-400/86-62
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
T. D. Gibbons on July 7-25, 1986. The inspection included a review of activities
authorized fcr your Harris facility. At the conclusion of the inspection, the
findings were discussed with those members of your staff identified in the
enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
Your attention is invited to unresolved items identified in the inspection
report.
These matters will be pursued during future inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclo~sure
will be placed in the NRC Public Document Room.
Should you <have any questions concerning this letter, please contact us.
Sincerely,
//
l$ f
Dav'd M. Verrelli, Chief
Reactor Projects Branch 2
Division of Reactor Projects
l
Enclosure:
(See page 2)
,
,
8609030092 860825
ADOCK 0500
0
po/
-
-
_
.
-
-
-
--
_.
AUG 2 51986
o
.
.
'
Carolina Power and Light Company
2
'
Enclosure:
NRC Inspection-Report
cc w/ enc 1:
A.A. Watson,VicePresident
Harris Nuclear Project
y/D. L. Tibbitts, Director of Regulatory
Compliance
/J. L. Willis, Plant General Manager
/ ec w/ encl:
b
C. Barth, ELD
/J. Moore, ELD
-
/ NRC Resident Inspector
Document Control Desk
State of North Carolina
,
t
't
d
4
?
RII
RI
RII
i
TDGibbons:er
TEConlon
ARHerdt
DMVerrelli
08/>i/86
08/f//86
084g/86
08/ /86
,
,-
- - - . , ,
- .
.
,
- . .