5' Oyster Creek Core Spray System Inspection Program Topical Report No. 037 (Rev. 0)
Project No 51070 E. J. Ahern Author oi Approvals:
kD:
8-zz 86 Sectioft Manap Date p
T l
8 M w,-
Department' Manager Date
/A
$~ bA~ $b' g,
tor - bality Assurance Date
\\
l
\\ *- M L
'l du
(
VicePresid%1t Datd Technical Functions (Significant Impact Review) 8609030089 860903 DR ADOCK 05000219 PDR 1
5
=,
Topical Rsport No 037 Prga 2 of 11 Abstract During the 1986 refueling outage at Oyster Creek, an augmented inspection program was performed on the Core Spray Sparger System.
In-vessel annulus piping was inspected utilizing remote visual examination. Sparger assemblies were inspected utilizing remote visual and remote ultrasonic examinations. No relevant indications were identified or recorded.
l l
I l
i
~,.
p-
-7,.,-
wag,g--+.,g,,
s.
~
4, Tepical Rgpart No 037
~
Page 3 of 11 i
TABLE OF CONIENTS Page Introduction 4
Visual Inspections 5
Core Spray Spargers Core Spray Annulus Piping Ultrasonic Inspection 5
Core Spray Spargers Conclusions 6
References 7
Attachements Core Spray Piping Inspection Summary 8
Core Spray Sparger UT Scan Areas 9
Annulus Piping - Upper Unit 10 Annulus Piping - Lower Unit 11 i
s_
4-y9
-.w.1,,,yy.
e,-
_w-
,-w.
,e<3
=-
Tepical R2part No 037 P&;o 4 cf 11 Oyster Creek Core Spray Sparger System Inspection "rogram Introduction The inspection program for the Core Spray Sparger System was performed during the present 1986 refueling outage. The program and the results, as reported herein, are f ollow up responses to NRC I&E Bulletin 80-13 and Section 6.9.3(3)e, " Unique Reporting Requirements", of Oyster Creek's Conditional Operating License.
Both require the reporting of inspection results and plan of action, if needed, for the Core Spray Sparger System.
The inspections have been completed and a summary of each follows.
i i
e yr-w w-
,9, m
~
Sy
.g Tepical R2 port N3 037--
Pcgs 5 of 11 Visual Examinations The Core Spray System was visually inspected utilizing a Westinghouse ETV-1250 video camera with twin 50 watt lights attached to the camera.
Video filter and processing equipment were available for enhancing video images. There were no indications that required the usa of video enhancement.
The visual examinations were performed by vendor personnel with the results evaluated by a certified Visual Level III. An independent overview of the results was performed by a indepcndent certified Visual Level III.
Core Spray Spargers Two visual examinations were performed on the Core Spray Sparger.
The first examination was performed prior to the ultrasonic examination.
The camera was mounted on a rigid fixture that was erected f rom the reactor vessel's center fuel cell.
This examination provided a close-up inspection of the Spargers and nozzles surf aces.
The second visual examination of the~ Core Spray Spargers was performed subsequent to the ultrasonic examination of the spargers and utilized a hand held camera technique. This inspection was performed to assess the overall intergity.of the Core Spray Sparger's and nozzles.
Core Spray Annulus Piping The Core Spray Annulus piping was visually inspected utilizing a hand held camera technique. All accessible areas of the piping were inspected. Refer to figures 2 and 3 Ultrasonic Examination Core Spray Spargers Ultrasonic examination of all accessible areas of the Core Spray Spargers was perf ormed by certified NDE pesonnel under-the supervision of CPUN Site Quality Control personnel.
An improved fixture was designed for use during this inspection.
Scanning of the spargers was performed using one shoe (vs two shoes in 1983) which resulted in hetter coupling and increased coverage. No helical scans were performed during this inspection.
-n a-.
Tcpicc1 Rzpset No 037 P;ga 6 of 11 Conclusions Following completion of all inspections relative to the Core Spray System, a review was conducted of the results along with the acceptance criteria of Specification SP-1302-56-005. The following conclusions are drawn f rom this review.
The number of confirmed cracks in the sparger assemblies is one, that being the through-wall crack at 208* identified and clamped in 1978.
The 1985 UT inspection of the spargers showed no recordable indications. This is consister.t with the 1983 UT inspection.
t The 1986 visual inspection of the spargers showed various and minor degrees of scratches, scuf f marks, scrapes, gouges and discoloration on the sparger surf ace.
No indications that could be interpreted as crack-like were noted during the examination or post examination review.
s e
v..m..
\\
Tcpical Rsport Ne 037 Prga 7 cf 11 References 6130-QAP-7209.07, Rev 2-00, UT Examination of Core Spray Sparger 6130-QAP-7209.30, Rev 0-00, Visual Examination Reactor Vessal Internals TDR 657, Rev 0,1986 (Cycle 11R) Outage Activities-Assessments / Requirements Specification SP-1302-56-005, Rev 5, oyster Creek Core Spray Sparger and Reactor Vessel Internals Inspection.
S 4
s
Txble 1 CORE SPRAY PIPING INSPECTION
SUMMARY
,f Spargers Annulua Piping Visual Ultrasonic Visual Ultrasonic Air Test R emarks No indications Air release observed One Repair 1978 1 through wall crack f rom 1 crack (208*)
Bracket only installed at 208* (Sys II)
Seven Repair 1980 19 indica-16 indications 2 indications tions called Brackets Installed c racks (Sys II) Two 28 Total Indications (excluding Repair Brackets:
1978 indication) installed (Sys I) 1982 Video enhanced Video enhanced Video 1980 visual in-one 1980 indi-Enhance-dications.
cation ments Results identi-Results:
{
fied :
Not a crack
~
3 cracks (6 x 5 reducer)
I 2 possible cracks 1983 No indications
- No indications
- No indications No indications
- Area of (4 of 1980 (5 of 16 - 1980 7 welds Inspection indications indications inspected limited by examined) rechecked)
Repair Brackets 1986 No indications
- No indications
- No indication 5Y N,
a
>* O ft
~
\\
's, Topical Raport No 037 e.
Figure 1 - UT SCAN AREAS
,0 Page 9 of 11 Tut IT 9 8 st m b
% /,s*
- g
.W T
. s, p/, -
s
$,/
s s
i s
=
I
\\/
1 l
/\\
a
/
g
\\
\\.
/
'k -
IN
- /
Lower Sparger au s#,e ll O
b o!
O i
e e
_7 N! I T U
U w
4 3
e #,,,. ** "" * ' ' # '3 u 4 **,4 '*
\\
O.
/
f c.
c.
m
.a cX
.'c' W7 Upper Sparger S,
s s u u
s' 8.
8 8
8
/
./ ;
3 4
e
/'
's
/.
i i
i i
4 a
bi
'\\
l t
s 4
$\\cy
............ w/
,; I
\\\\
im w-4._i u m
O
PP m
~
.4
)
~.
f a
ca >
4Y Ye
- * 's 5
1 iS 5j Y
s$
)
)) )
)
3k*5 s
s r-4 e'4 s
s s
C' ez N
HA a:
taa Si N,
r i
.A 2
m ff S i
8sS Ts A
14 AY II go 01 ased
'400 ON asodaH TU3T ol g aansig d
b
-s e
C4
( '1 l h
a t
t L
)
)..i, n
.~
T 9
a
~
s H
5 0z H
SLe M
C4 S
t r
m 3Y d
0, 4
a.*, >
i,
,a
)
a a.s 7
3, l
l 9
l l
1 r
l 4
,4 d
n
()
.*+
A 11 Jo 11 eBed 400 ON 32oday Iv3T ol g e2nSTd d
- ,.,3 E
_b