Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20206R739 + (ML20206R739)
- PNO-I-98-025, on 980630,unit 3 Established Reactor Criticality,However Reactor Was Shut Down When Control Room Operator Noticed Spiking Intermediate Range Monitor.Licensee Troubleshooting + (ML20206R742)
- ML20206R744 + (ML20206R744)
- PNO-I-98-013, on 980417,alert Declared After Detection by Smell of Unidentified Odor,Initially Believed to Be Acetylene or Propane Gas,Resulting in Evacuation of Area. Fire Brigade Activated + (ML20206R745)
- ML20206R747 + (ML20206R747)
- ML20206R748 + (ML20206R748)
- ML20206R749 + (ML20206R749)
- 05000327/LER-1987-020, :on 840518,nonconformance Rept Written Describing Condition Where Class 1E Electrical Components Found Unprotected Against Potential Water Spray from Failure of Piping.Caused by Inadequate Design + (ML20206R751)
- ML20206R756 + (ML20206R756)
- ML20206R758 + (ML20206R758)
- 05000382/LER-1987-010, :on 870318,discovered That Retest of Pressurizer Surge Line PSL-203 Sample Header Inside Containment Isolation Valve Not Performed.Caused by Failure to Comply W/Mgt Controls & Procedures + (ML20206R759)
- ML20206R760 + (ML20206R760)
- ML20206R762 + (ML20206R762)
- ML20206R763 + (ML20206R763)
- PNO-I-98-002, on 980130,operators Declared Both Trains of Component Cooling Reactor & Reactor Plant River Water Sys Inoperable Due to Failure to Meet TS Surveillance Testing Requirements.Entered TS 3.0.3 & 4.0.3 + (ML20206R764)
- 05000312/LER-1987-021, :on 861121,pressurizer Heater Bundles Damaged Following Heater Breaker Trips.Caused by Energization of Heaters W/O Adequate Water Level & Inadequate Administrative Controls.Root Cause Investigation 86-34 Issued + (ML20206R765)
- ML20206R766 + (ML20206R766)
- ML20206R769 + (ML20206R769)
- TXX-4883, Interim Deficiency Rept CP-85-31 Re Impact of Addl Weight on Electrical Raceway Support Sys.Initially Reported on 850827.Ebasco Consolidated All Raceway Items Under Scope of Single Program.Next Rept by 861021 + (ML20206R770)
- ML20206R773 + (ML20206R773)
- ML20206R776 + (ML20206R776)
- ML20206R777 + (ML20206R777)
- ML20206R778 + (ML20206R778)
- ML20206R779 + (ML20206R779)
- 05000261/LER-1987-002-03, :on 870318,while Subcritical,Reactor Tripped & Reactor Protection Sys Received Spurious P-7 Permissive Signal Actuating Shutdown Banks.Cause of Voltage Spike Not Determined.Reactor Returned to Power + (ML20206R780)
- ML20206R781 + (ML20206R781)
- ML20206R784 + (ML20206R784)
- ML20206R785 + (ML20206R785)
- BSEP-99-0080, Forwards Revs Made to TS Bases Between 980605 & 990507 Without Prior NRC Approval + (ML20206R786)
- ML20206R788 + (ML20206R788)
- NLS8600297, Application for Amend to License DPR-46,consisting of Proposed Change 29,revising Tech Specs to Incorporate Cycle 11 Reload + (ML20206R789)
- ML20206R790 + (ML20206R790)
- IR 05000423/1986017 + (ML20206R792)
- ML20206R793 + (ML20206R793)
- 05000327/LER-1987-019, :on 870318,operator Observation Discovered That Four Emergency Diesel Generators Started.Caused by Inadequacy of Procedure to Isolate Degraded Voltage Timer Contacts for Functional Testing + (ML20206R795)
- PNO-III-98-013, on 980126,turbine Tripped Causing Subsequent Reactor Trip.Cause of Turbine Trip Remains Under Investigation.Appears Replacement Circuit Board Had Incorrect Electronic Configuration + (ML20206R796)
- ML20206R797 + (ML20206R797)
- ML20206R798 + (ML20206R798)
- ML20206R799 + (ML20206R799)
- BECO-86-138, Revised Application for Amend to License DPR-35,changing Administration Section of Tech Specs to Reflect Elimination of Position of Senior vice-president + (ML20206R800)
- ST-HL-AE-2053, Forwards Results of Discussions Re Several Questions Asked by NRC & NRC Contractors During Course of App R Fire Protection Audit Conducted at Site on 870330-0403 in Preparation of Ser.List of NFPA Deviations Reviewed Encl + (ML20206R801)
- ML20206R802 + (ML20206R802)
- ML20206R805 + (ML20206R805)
- ML20206R806 + (ML20206R806)
- ML20206R807 + (ML20206R807)
- ML20206R808 + (ML20206R808)
- ML20206R809 + (ML20206R809)
- ML20206R810 + (ML20206R810)
- SNRC-1325, Submits Listed Changes to QA Organization.Changes Do Not Eliminate or Reduce Any Functional Responsibilities or Activities Described in Manual.Organizational Chart Encl + (ML20206R811)
- ML20206R814 + (ML20206R814)
- PNO-III-98-017, on 980217,three Cs-137 Sources Were Inserted Into Gynecological Applicator in Patient.On 980218,nurse Noticed One Source in Linens of Patients Bed.Nurse Used Cup to Remove Source & Called Attending Physician + (ML20206R815)